Government Policies

New Industrial Master Plan 2030 (NIMP 2030): What It Means for Factory Owners, Tenants and Buyers

NIMP 2030 explained for factory owners, tenants and buyers: launch date, targets, priority sectors, the automation licence condition, multi-tiered levy, smart factories and the ECRL industrial parks named in Selangor.

Published: October 25, 2026
10 min read
652 views
New Industrial Master Plan 2030 (NIMP 2030): What It Means for Factory Owners, Tenants and Buyers

Key Takeaways

  • The New Industrial Master Plan 2030 (NIMP 2030) is Malaysia's industrial policy for manufacturing and manufacturing-related services, launched by Prime Minister Anwar Ibrahim on 1 September 2023 and running for seven years to 2030.
  • It targets manufacturing value added of RM587.5 billion by 2030 (from RM364.1 billion in 2022), 3.3 million jobs and a manufacturing median salary of RM4,510, through 4 missions, 21 strategies, 62 action plans and 9 mission-based projects.
  • Priority sectors are E&E (IC design and wafer fabrication), specialty chemicals, aerospace, pharmaceuticals and medical devices, plus advanced materials, EVs, renewable energy and carbon capture.
  • For factory owners and tenants, the parts that matter most are the planned automation condition in new Manufacturing Licences, a multi-tiered foreign worker levy, 3,000 smart factories, and turning older industrial estates into eco-industrial parks.
  • In Selangor, the plan lists potential industrial parks at Kapar, Klang, Pulau Indah and Puncak Alam along the ECRL. "Potential" means identified, not approved, so check before paying for that story.

This guide explains what NIMP 2030 is, what it targets, and what it changes for people who own, rent, buy or sell factories and industrial land in Selangor and the Klang Valley. It is a plain-language summary, not legal, tax or investment advice.

What is the New Industrial Master Plan 2030?

NIMP 2030 is the national plan that sets the direction for Malaysia's manufacturing sector from 2023 to 2030. The official NIMP 2030 portal describes it as the industrial policy for manufacturing and manufacturing-related services, built on "moonshot thinking" and a whole-of-nation approach that brings government and the private sector together.

According to MIDA's launch summary, the plan has six goals:

  1. Increase economic complexity
  2. Create high-value job opportunities
  3. Extend domestic linkages
  4. Develop new and existing clusters
  5. Improve inclusivity
  6. Enhance ESG practices

The four missions

Mission What it means in practice
1. Advance economic complexity Move up the value chain: IC design, wafer fabs, specialty chemicals, advanced materials
2. Tech up for a digitally vibrant nation Automation, Industry 4.0, 3,000 smart factories, a national digital platform for manufacturing
3. Push for Net Zero Energy efficiency, renewable energy, an iESG framework, eco-industrial parks, carbon capture
4. Safeguard economic security and inclusivity Supply chain resilience, SMEs, state industrial programmes, clusters

These are backed by four enablers: financing, talent, the investor journey and governance. The plan is delivered through 21 strategies, 62 action plans and nine mission-based projects (MBPs) such as a locally manufactured EV, 3,000 smart factories, a generative AI hub and large-scale carbon capture.

When was NIMP 2030 launched, and what are its phases?

The plan was launched on 1 September 2023. The Prime Minister's launch speech said it would need an estimated RM95 billion of investment over seven years, mainly from the private sector, with close to 10% from the government through the NIMP Industrial Development Fund (NIDF) and the NIMP Strategic Co-investment Fund (CoSIF). MIDA reports a proposed RM8.2 billion government allocation for the missions and enablers from 2024 to 2030, with RM200 million initial funding from Budget 2024.

The official NIMP 2030 document splits delivery into two phases:

Phase Years Focus
Phase 1: Strengthen foundation 2023 to 2026 Set up governance, funding and industry deals, onboard SMEs, launch the first MBPs
Mid-term review End of 2026 Review targets and progress, recalibrate gaps
Phase 2: Sustain growth and resilience 2027 to 2030 Scale up implementation, diversify the economic base, build resilience

We are now at the end of Phase 1, so the mid-term review is the next point where targets or programmes may change.

Three factories growing from a small old workshop to a modern solar plant, like the plan's phases
IllustrationThree factories growing from a small old workshop to a modern solar plant, like the plan's phases

What are the NIMP 2030 targets?

The plan sets these headline targets for the manufacturing sector (from the official document):

Measure Baseline 2030 target
Manufacturing value added (GDP) RM364.1 billion (2022) RM587.5 billion (CAGR 6.5%, +61%)
Manufacturing employment 2.7 million 3.3 million (CAGR 2.3%)
Manufacturing median salary RM1,976 (2021) RM4,510 (+128%)
R&D spending (GERD) to GDP 1.0% 3.5%
Share of export-oriented SMEs 11.7% 25%
Domestic value added in manufacturing 49% (2018) 65%

It also aims for 700,000 high-skilled jobs created over the seven years. Early progress reported by MITI and carried by MIDA: manufacturing value added rose 4.7% (RM4.2 billion) year on year as of the second quarter of 2024, and jobs rose 0.9%.

What are the priority sectors, and what factories do they need?

MIDA lists the high-value priority sectors as E&E (IC design and wafer fabrication), specialty chemicals, aerospace, pharmaceuticals and medical devices, with four more growth sectors: advanced materials, electric vehicles, renewable energy and carbon capture, utilisation and storage (CCUS). Bernama reported in February 2026 that approved E&E investments from 2021 to September 2025 totalled RM341 billion, more than the RM298 billion recorded from 1980 to 2020.

MIDA now also screens manufacturing projects against minimum thresholds under the National Investment Aspirations: a capital investment per employee of RM140,000 and value added of at least 40%, according to MIDA's 2025 investment performance report. That pushes demand toward capital-heavy operations, which in turn need buildings with:

  • Enough electricity: high-value lines, cleanrooms and automated equipment draw far more power than a basic assembly unit. Size your need with the factory power calculator before shortlisting.
  • Floor loading and height for heavy machinery, racking and automated handling.
  • Clean, dry and controlled spaces for semiconductor, pharmaceutical and medical device work.
  • Correct approvals: industrial zoning, CCC, Bomba and DOE approvals, and a Manufacturing Licence where required.

How does NIMP 2030 affect factory owners and tenants?

Automation condition in new Manufacturing Licences

Action plan 2.2.2 proposes adding an automation condition to new Manufacturing Licences issued by MITI. It is phased: SMEs get a grace period to adopt automation, while MNCs and large local companies would face it with immediate effect. Companies would audit and report their automation progress.

Multi-tiered foreign worker levy

Action plan 2.2.1 proposes a multi-tiered levy for low-skilled foreign labour: higher charges for companies that employ more foreign low-skilled workers, sector-based rates, and gradual implementation, led by the Ministry of Human Resources. Our news piece on the levy and mechanisation follows how this is playing out.

3,000 smart factories

Mission-based project 2.1 aims to transform 3,000 factories into smart factories by 2030, using the Industry4WRD readiness assessment and intervention fund, with funding from the private sector and the NIDF.

Eco-industrial parks and ESG

Action plan 3.4.1 aims to turn brownfield industrial estates into eco-industrial parks with shared park management, resilient infrastructure, waste circularity, advanced wastewater treatment and renewable energy. MITI leads it with NRECC, DOE, SIRIM and MIDA. For a building owner, this points toward rooftop solar readiness, efficient services and proper wastewater arrangements.

What this means in short: older low-power, labour-heavy units will be harder to let or sell to the target sectors, while buildings that can take automation, more power and cleaner processes fit where demand is heading.

Robotic arms and an automated cart move cartons while two staff supervise from a control desk
IllustrationRobotic arms and an automated cart move cartons while two staff supervise from a control desk

What does NIMP 2030 mean for industrial property in Selangor and Klang?

The official document notes that Selangor, Johor and Penang are the three main states contributing manufacturing value added in Peninsular Malaysia. MIDA's 2025 report shows Selangor had 410 approved manufacturing projects worth RM18,136.3 million in 2025, with 24,957 potential jobs (2024: 338 projects, RM18,736.3 million).

ECRL industrial parks named in the plan

Under Mission 4, MIDA and China Communications Construction Company signed an MOU for Economic Accelerator Projects along the East Coast Rail Link towards Port Klang. The plan's Table 7.2 lists these Selangor sites:

Site in NIMP 2030 Table 7.1 / 7.2 Status in the plan Nearest ECRL station listed
UMW High Value Industrial Park Identified Serendah Baru
Serendah Cargo Hub (logistics) Identified Bandar Serendah
ITT Gombak Transit Gateway (logistics) Identified ITT Gombak
Puncak Alam Industrial Park Potential Puncak Alam
Kapar, Klang and Pulau Indah Industrial Parks Potential Jalan Kastam
Jalan Kastam Logistic Hub Potential Jalan Kastam

For buyers, two points follow. First, a "potential" park is only an idea in the plan, so never pay a premium on the strength of it without a gazette, a state approval or a developer launch. Second, the existing belts in Kapar and around the Pulau Indah Industrial Park already sit near the rail and port corridor. You can compare JPPH-registered prices on the Kapar industrial transactions page and browse factories for sale in Kapar or the Pulau Indah Industrial Park page.

Common mistakes when reading NIMP 2030

  • Thinking NIMP pays you to buy a building. Its funds (NIDF and CoSIF) target R&D, technology adoption, talent, eco-industrial park and cluster development, and the mission-based projects. Tax incentives are applied for separately through MIDA.
  • Treating action plans as law. The automation condition and multi-tiered levy are proposals to be phased in. Check the current rules with MITI, MIDA and the Ministry of Human Resources before you rely on them.
  • Paying for "potential" parks. Listed sites are not approvals.
  • Ignoring the building. A target sector tenant needs power, floor loading, approvals and space to automate. A low-power unit does not become a semiconductor plant because the sector is a priority.

Frequently Asked Questions

What is the new industrial master plan 2030?

NIMP 2030 is Malaysia's seven-year industrial policy for manufacturing and manufacturing-related services, running from 2023 to 2030. It uses four missions, 21 strategies, 62 action plans and nine mission-based projects to move industry into higher-value, more automated and greener activities. MITI leads it.

When was NIMP 2030 launched?

Prime Minister Anwar Ibrahim launched NIMP 2030 on 1 September 2023. Phase 1 runs from 2023 to 2026, a mid-term review is scheduled for the end of 2026, and Phase 2 runs from 2027 to 2030.

What are the priority sectors for NIMP 2030?

The high-value priority sectors are E&E (IC design and wafer fabrication), specialty chemicals, aerospace, pharmaceuticals and medical devices. Four further growth sectors are advanced materials, electric vehicles, renewable energy and carbon capture, utilisation and storage.

What will happen to Malaysia's manufacturing sector by 2030 under NIMP?

The plan targets manufacturing value added of RM587.5 billion, 3.3 million manufacturing jobs and a median manufacturing salary of RM4,510 by 2030. It also aims for 3,000 smart factories, more export-oriented SMEs and a higher share of domestic value added.

Where can I download the NIMP 2030 PDF?

The full plan and the sectoral plans are published free on the official portal, nimp2030.gov.my, under its resources section. Read the official version rather than copies on file-sharing sites, as targets may be updated after the mid-term review.

Does NIMP 2030 give incentives for buying a factory?

Not directly. NIMP funds support R&D, technology adoption, talent, eco-industrial parks, clusters and the mission-based projects, while tax incentives for manufacturing activities are applied for through MIDA. Check with MIDA and your tax adviser what applies to your project.

How does NIMP 2030 affect factory tenants?

Tenants in target sectors may need more power, automation-ready floors and greener buildings, and the planned automation licence condition and multi-tiered levy push in the same direction. Check a unit's power supply, approvals and landlord consent for upgrades before signing.

FactoryHub is dedicated to helping every client find the right factory or warehouse. If you are looking for a factory that fits a NIMP 2030 sector, call or WhatsApp Peter Tan (REN 12771) at 016-666 6872 or Jason Low (PEA 1478) at 012-288 1834.

Tags

#NIMP 2030#New Industrial Master Plan#MIDA#Manufacturing policy#Smart factory#Selangor
P
Peter Tan
Industrial Property Consultant · FactoryHub

Focused on Malaysia industrial real-estate research and transactions across the Klang Valley and Nilai corridors. Every article is grounded in our own deal flow and licensed-agent sources.

All articles by Peter Tan →
Looking to buy or rent a factory?
Peter Tan (REN 12771) · 016-666 6872
Registered with BOVAEP under CID Realtors Sdn Bhd (E(1) 1855)
Share

Related Posts

Selangor Zero Discharge Policy: LUAS Checks Factories Door to Door, 14 Days to Apply for a Licence | Government Policies
Government Policies

Selangor Zero Discharge Policy: LUAS Checks Factories Door to Door, 14 Days to Apply for a Licence

LUAS is visiting industrial areas across Selangor's nine districts to find factories without Zero Discharge Policy licences. Premises found get 14 days to apply. What owners, tenants and buyers should check.

Peter Tan
Oct 26, 2026
656
7 min
Trade License in Malaysia for a Factory or Warehouse: WRT, Council Licence and SSM | Government Policies
Government Policies

Trade License in Malaysia for a Factory or Warehouse: WRT, Council Licence and SSM

Which trade licence a factory, warehouse or trading company in Malaysia needs: SSM registration, the council premises licence, KPDN's WRT approval for foreign-owned firms and MIDA's manufacturing licence, with fees and steps.

Peter Tan
Oct 30, 2026
586
9 min
Carey Island Port City and Special Economic Zone Approved in Principle: What It Means for Industrial Land | Government Policies
Government Policies

Carey Island Port City and Special Economic Zone Approved in Principle: What It Means for Industrial Land

The National Physical Planning Council has approved in principle the Carey Island Port Special Economic Zone and a National Maritime Port City. Here is what was approved, what the 1,011.7 hectare plan includes, and what land buyers in Kuala Langat should check next.

Peter Tan
Oct 21, 2026
738
6 min
Foreign Worker Levy May Fund Mechanisation: What Tighter Labour Rules Mean for Factories | Government Policies
Government Policies

Foreign Worker Levy May Fund Mechanisation: What Tighter Labour Rules Mean for Factories

The Treasury is open to using foreign worker levy money for mechanisation, MITI says foreign labour will get harder to find, refugees may fill 3D jobs and raids are hitting factories. Here is what it means for factory owners, tenants and buyers.

Peter Tan
Oct 19, 2026
1.3k
7 min
Speed Selangor 2.0 in 2027: Faster Approvals for Factories, Warehouses and Logistics | Government Policies
Government Policies

Speed Selangor 2.0 in 2027: Faster Approvals for Factories, Warehouses and Logistics

Selangor will launch Speed Selangor 2.0 in 2027 with factories, warehouses and logistics facilities as priority projects: 21 days for pre-consultation and 9 days for a decision. What it means for factory buyers and developers.

Peter Tan
Oct 16, 2026
1.2k
6 min
Budget 2027 for Factory Owners: RM2,000 Minimum Wage, Sales Tax Refund and ACA to 2030 | Government Policies
Government Policies

Budget 2027 for Factory Owners: RM2,000 Minimum Wage, Sales Tax Refund and ACA to 2030

Budget 2027 raises the minimum wage to RM2,000 from June 2027 with an MSME exemption, refunds sales tax on machinery bought from local dealers and extends ACA to 2030. Here is what it means for factory owners, tenants and buyers.

Peter Tan
Oct 14, 2026
1.8k
7 min