Key Takeaways

  • A used factory in the RM3 million to RM20 million range deserves its own building inspection before you pay the deposit or sign the SPA. A bank valuation is prepared to support the loan, not to test the roof, steel frame or wiring, and the periodic engineer's inspection in Act 133 applies only to buildings exceeding five storeys, so most factories have never had one.
  • Check the roof in or right after heavy rain, from inside first. DOSH guidance says to treat every roof as brittle until a close inspection shows otherwise and to inspect a roof from its underside before anyone works on it.
  • Grey corrugated fibre cement sheets may be asbestos cement, which is still legal in Malaysia. DOSH says intact sheets generally do not release fibres, but cutting or breaking them does; removal needs a contractor who notifies DOSH and disposes of the waste as scheduled waste SW 201.
  • Rust at column bases and connections, termite mud tubes and any past fire call for a Professional Engineer, a licensed pest control operator and documents from the seller. Rebuilding more than half of a roof counts as erecting a building under Act 133 and needs the council's prior written permission.
  • A factory fed through a main switch of 100 A or more must be run under a certified competent person under the Electricity Supply Act 1990, and one with a standby generator must hold a Certificate of Registration from the Energy Commission. Ask for both records.

Is a building inspection needed before you buy or rent a used factory?

For most purchases, yes, and for a long lease it usually pays too. On a deal worth millions, a roof replacement, an asbestos removal or a corroded frame can change the price you should pay, so the time to find them is before the deposit, not after completion.

The law gives you less protection than many buyers assume. Section 85A of the Street, Drainage and Building Act 1974 (Act 133) lets a council order a building to be inspected by a Professional Engineer after the tenth year from its CCC and every ten years after that, but subsection (2) applies the section only to buildings exceeding five storeys. A one or two storey factory therefore rarely has any engineer's report on file. The council's other power, under section 83, is to order the owner of a ruinous or dangerous building to repair or demolish it, and an owner who repairs must first obtain planning approval and approval of the repair plans. Once you own the building, that order is addressed to you.

What decides how deep to go is the building itself: the age and type of roof, closeness to the sea (Port Klang, Pulau Indah and Westport sit on the coast), the previous use (plating, chemicals and food washdown are hard on steel and floors), any fire history, extensions that may not be on the approved plans, and what you plan to add, such as racking, an overhead crane, heavier machines or rooftop solar.

Who checks what

Item Who to engage What you should get
Steel frame, slab, cracks, fire damage, extensions Civil or structural Professional Engineer (Ir.) registered with BEM Signed report with photos, findings and repair options
Roof sheets, gutters, skylights, flashings Roofing contractor working with fall protection Leak map and itemised quote
Suspected asbestos Sampling and testing first; for removal, a contractor that notifies DOSH Test result; for removal, DOSH acknowledgement and waste records
Termites Company holding a Pesticides Board pest control operator licence Inspection report, treatment proposal, warranty terms
Wiring, switchboard, generator Electrical contractor or competent electrical engineer Test results, defect list, thermal images where the plant is running

The Board of Engineers Malaysia registers Professional Engineers under section 10(2) of the Registration of Engineers Act 1967, and Professional Engineers with Practising Certificate under section 10D; the latter are the ones allowed to practise for designated engineering works. Where the report may end up supporting repair plans for the council, use a PEPC.

When to pay for a full building survey

Pay for a structural engineer and the specialists above when any of these apply: an asbestos cement roof; rust that flakes or pits at column bases, connections or purlins; roof leaks with stains on stock or floor; any fire, however small; extensions or a mezzanine you cannot match to the approved plans; a coastal or chemical environment; or plans to add load. A newer unit with a CCC, a metal roof still under warranty and no fire history may need only a careful walk through plus an electrical test, but still check the roof yourself.

When to do it in the deal

Ask for access for your engineer before you pay the booking fee, or make the offer letter and the factory SPA say what happens if the inspection finds defects: a price adjustment, repairs by the seller before completion, or a refund. For a rental, inspect before you sign, attach a schedule of condition with photos to the tenancy, and agree in writing which defects the landlord fixes before handover. Who repairs what during the tenancy, and the CCC, Bomba and title checks, are covered in our related guides, including what a CCC is and how to verify it.

How do you check a factory roof for leaks?

Go during or straight after heavy rain and start inside. A roof that looks fine in dry weather can leak at every lap in a storm, and a dry visit hides it.

What to look for from inside

  • Water stains, rust streaks or dried tide marks on the underside of roof sheets, purlins, walls and the floor.
  • Daylight through sheet laps, fixing holes or around skylights and exhaust fans.
  • Sagging or stained insulation under the sheets, a sign of a leak that has gone on for a long time.
  • Plastic sheets over machines or stock, buckets on the floor and fresh bitumen patches on the underside: the occupant has been living with leaks.
  • Rust at the foot of columns under gutters and downpipes, where overflow runs down the steel.

What the contractor checks on top

Rusted, loose or missing screws and washers; open or rusted laps; cracked or brittle translucent sheets; damaged flashings at walls, ridges and roof penetrations; internal and valley gutters that are rusted, too small or blocked; downpipes that cannot take the water; and ponding on low pitch roofs.

Do not climb the roof yourself

DOSH's Best Practice on Occupational Safety and Health in Construction Industry 2019 says all roofs should be treated as brittle until a close inspection reveals otherwise. Translucent sheets may have weathered or been painted to look like the rest of the roof, and corrosion can leave sheets unable to carry a person. Before working on any roof, the roof should be inspected from its underside for structural soundness; walking along the line of bolts above the purlins is, in DOSH's words, similar to walking a tight rope; fall protection is required where the roofing is brittle or corroded and no barrier is installed; and internal gutters people walk along must be 450 mm wide or have fall protection. Ask for drone photos or send a roofing contractor equipped for the job.

How long does a factory roof last, and how much does a new roof cost?

There is no single lifespan. A steel roof lasts according to its metallic coating and paint system, how close it is to the sea or to chemical fumes, and how well the gutters, fasteners and cut edges are maintained. Sheet makers state perforation by corrosion warranties per product and per site; one maker's Malaysian product page currently advertises up to 36 years for its prepainted roofing steel, subject to its terms. A warranty is a conditional promise for a named product, not a forecast for the roof in front of you, so ask the seller or landlord for the installation date, the product name and thickness, the warranty certificate with its conditions, and the record of repairs.

No official rate exists for re-roofing a factory, and the cost varies with the area, the sheet and insulation chosen, whether old sheets are asbestos, access and safety, and whether the factory keeps running during the works. To compare quotes, ask each contractor to price the same scope:

Quote item Why it matters
Removal and disposal of old sheets Asbestos cement adds the DOSH removal process and SW 201 disposal
New sheet product, coating and thickness Decides the warranty you will get
Insulation, skylights, flashings Often left out of the cheapest quote
Gutters and downpipes Undersized gutters are a common source of leaks
Fall protection, scaffold, lifting Required for roof work
Working around operations Night or phased work costs more
Warranty on workmanship Separate from the sheet maker's warranty

Two rules affect large roof jobs. Under section 70(16) of Act 133, demolishing and reconstructing more than half the superficial area of the roofs counts as erecting a building, which section 70(1) does not allow without the council's prior written permission, and works on the same building on two or more occasions within ten years may be aggregated. Section 82 also requires the council's prior written permission before altering or repairing the outward part of a building. Ask your contractor and council before you start. Prices of coated steel also move: provisional anti-dumping duties on aluminium zinc coated steel imports took effect on 7 November 2026, as we explain in our report on the duty and factory roofs, so ask for dated quotes.

Roofing contractor in a harness checking rusty screws and a gutter on a factory roof
IllustrationRoofing contractor in a harness checking rusty screws and a gutter on a factory roof

Is an asbestos roof dangerous, and is asbestos still allowed in Malaysia?

Asbestos cement is still legal in Malaysia, and an intact roof is a low risk until someone cuts, drills or breaks it. The DOSH Guidelines for Asbestos Removal 2017 state that asbestos containing materials with chrysotile are still being used in Malaysia, though no longer in government buildings on the instruction of the Public Works Department, and that asbestos cement was widely used in roofing and ceilings. The same guideline explains that corrugated roofing sheets are considered non friable if intact and generally do not emit airborne fibres unless sanded, sawn or worked aggressively, while asbestos cement pipes or sheets can liberate fibres if they are cut, sawed or broken. Health effects listed in the guideline include mesothelioma.

The policy may change. In January 2026 the Natural Resources and Environmental Sustainability Minister said the use of asbestos based materials was under review and that more information would follow, with any legal changes going to Parliament (FMT, 15 January 2026). Check the position at the time you budget.

How do you know if the roof is asbestos?

You cannot be sure by eye. Grey corrugated fibre cement sheets on an older factory are the usual suspect, and the DOSH guideline also lists asbestos in water tanks, pipes, drainage, air conditioner duct insulation, vinyl floor tiles, gaskets and bituminous waterproofing. Only a sample tested by a laboratory confirms it. Do not snap off a piece yourself: breaking it is exactly what releases fibres.

What removal involves

Under the DOSH guideline the employer appoints a capable contractor, which carries out a workplace assessment (hazard identification and risk assessment, plus a chemical health risk assessment by an assessor) and submits documents for DOSH's acknowledgement at least two weeks before preparing the site: a cover letter, project background, work flow, the method of identifying asbestos, the assessment reports, the safe operating procedure, disposal information, the workers' latest medical surveillance and training records. Sheets are removed with minimal breakage and lowered to the ground, the waste is stored in a designated area and delivered by a licensed contractor, and it is handled as SW 201 under the Environmental Quality (Scheduled Wastes) Regulations 2005. The guideline governs how removal is done; it does not set a date by which intact sheets must come off.

What it means for your deal

A buyer should decide whether to replace the roof now or later and price that into the offer, especially if rooftop solar is planned, because fixing panels means drilling the sheets. A tenant should agree in the tenancy that nobody cuts or drills the sheets, who pays if they break, and what the landlord will do if they deteriorate.

How do you check the steel structure for rust and safety?

Walk the frame from the floor with a strong torch, binoculars or a drone, concentrating on the places where water and impact collect, then have a structural Professional Engineer confirm anything beyond light surface rust.

Where to look

  • Column bases, base plates and holding down bolts, especially where floors are washed, water ponds or gutters overflow.
  • Rafter to column and apex connections: bolts, end plates and welds.
  • Purlins, roof bracing and gutter supports under any leaking area.
  • Crane runway beams and brackets, and mezzanine beams.
  • Columns and cladding rails hit by forklifts: bent flanges, dents, missing bolts.

Warning signs

Rust that flakes off in layers, pitting or holes, swollen rust between bolted plates, members that are bent or twisted, a roof line that sags between frames, cracks in the floor slab around column bases, and roller shutters or doors that no longer run true. Salt air on the coast and fumes from processes such as plating speed up corrosion, so a factory near the sea deserves a closer look at fasteners and connections.

Compare what is built with the approved plans: a mezzanine or extension that is not on them is a compliance problem as well as a structural one. If you plan racking, heavier machines or a crane, check the slab with our floor loading calculator and ask the engineer to confirm. Floor cracks and settlement, overhead cranes and illegal extensions each have their own FactoryHub guide.

How do you check a factory for termites?

The steel frame and concrete are not at risk, but almost every used factory has timber: office partitions, door frames, ceiling boards, older roof timbers, mezzanine boards, and the occupant's pallets, cartons and stock. Look for earthen mud tubes running up walls, columns and along floor joints, timber that sounds hollow or crumbles, blistered paint on door frames, and discarded wings near lights.

The person you hire must be licensed. According to the Department of Agriculture's licensing pages, a company that carries out pest control on other people's property for hire must hold a pest control operator licence (Lesen Pengendali Kawalan Makhluk Perosak) from the Pesticides Board, valid for two years and displayed at the premises named in it, and the person who carries out or supervises the treatment must hold a pesticide applicator licence, which covers termite and other wood pest control and must be worn during the work. Ask to see both licences, the inspection report, what treatment is proposed and the warranty and re-inspection terms. A buyer should also ask the seller for past treatment records; a tenant should have the unit inspected before moving stock in and agree who pays for treatment.

Should you buy or rent a factory that had a fire?

It can be a sound purchase, but only when an engineer's post-fire assessment and the paperwork show that the structure was checked, the repairs were approved and the services were restored. Without those, treat the building as an unknown risk and price it that way.

What happens to steel in a fire

The technical guidance on fire damage assessment of hot rolled structural steelwork explains that steel loses strength as it heats and that steel heated above about 600°C may suffer some deterioration in its properties after cooling. Steel that is still straight after a fire while carrying an appreciable load was probably not heated beyond that point, yet the guidance still recommends hardness tests in all cases, replacement of bolts that show any sign of heating such as blistered paint, and careful inspection of connections for cracked welds, damaged end plates and failed bolts, with some bolts removed for checking. Every building is a separate case, and the structural engineer decides what distortion is acceptable.

Approvals after the fire

If the reinstatement rebuilt more than half of the roof area, section 70(16) of Act 133 treats it as erecting a building, which needs the council's prior written permission. Ask for the council approval, the repair drawings and the completion documents.

Documents to ask for

The date and extent of the fire and what burned; the Bomba report and the insurer's loss adjuster report; the engineer's post-fire report; repair drawings, approvals and the contractor's records; test results for replaced wiring; and service records showing the fire alarm, sprinkler and hose reel systems working again. Smoke soaked insulation should have been replaced, and any asbestos sheets broken by the fire should have been cleared under the DOSH removal process.

Pest control technician checking termite mud tubes beside a timber door frame in a factory
IllustrationPest control technician checking termite mud tubes beside a timber door frame in a factory

What should you check in the wiring and switchboard?

Have an electrical contractor or competent electrical engineer inspect and test the installation before handover: the main switchboard, busbars and breakers, cable condition, signs of overheating such as discoloured terminals, earthing and earth leakage protection, distribution boards in wet areas, loose or hanging cables from past alterations, the generator and its changeover, and the capacitor bank.

Ask about compliance as well as condition. Section 23(1) of the Electricity Supply Act 1990 says an installation shall not be worked or operated except by or under the control of persons holding the prescribed certificates, with a fine of up to RM10,000 for a breach. The Electricity Supply (Exemption) Notification 1994 exempts small users, but not installations above low voltage, low voltage installations that receive energy through switchgear rated 100 A or more, or those generating more than 5 kW. Most mid to upper range factories therefore need a certified competent person, usually a chargeman, in control: ask for the appointment and visit records. Under section 21 an installation must be registered on a valid Certificate of Registration, and the same notification keeps that duty for installations with a standby generator and those supplied at 11,000 V or more; the certificate cannot be transferred without the Energy Commission's permission. Section 22 requires notice and prior approval before an installation is constructed, extended or altered, subject to exemptions, so plan time for any upgrade.

Whether the supply is big enough for your machines is a separate question; work it out with our factory power calculator. The cost of a TNB power upgrade has its own guide.

What documents should you ask the seller or landlord for?

Document What it tells you
Approved building plans and CCC or CF Whether what is built matches what was approved
Roof installation date, product and warranty certificate Remaining roof life and who stands behind it
Roof repair records and leak complaints Where the roof has failed before
Asbestos test results, if any Whether removal must be budgeted
Pest control reports and warranty Past termite activity and cover
Fire history, Bomba and insurer reports, engineer's report, repair approvals Whether a past fire was properly dealt with
Single line diagram, electrical test results, competent person records, Certificate of Registration Whether the installation is safe and compliant
Fire protection service records Whether alarms, sprinklers and hose reels work
Previous uses and occupants Chemicals, washdown or loads the building has carried

A seller who cannot produce most of these is not necessarily hiding something, but it moves the cost of finding out onto you.

This guide is general information, not legal, engineering or tax advice; for a specific unit, rely on your own lawyer and engineer.

Costs, tax and financing: more questions

Does the bank valuation check the building's condition?

No. A bank valuation is prepared to support the loan amount, so it does not test the roof, steel frame, wiring or termite status. Your own inspection is what protects you.

Local inspection notes: checking a used factory in Klang by Ms Teh Seok Hoon, and inspecting a used factory in Rawang, Serendah or Shah Alam by Jason Low.

Frequently Asked Questions

Can a factory with an asbestos roof still be bought and sold in Malaysia?

Yes. Asbestos cement is still legal in Malaysia, and a factory with an asbestos roof can be sold or rented like any other. DOSH guidance says intact sheets generally do not release fibres, but cutting, drilling or breaking them does, so removal needs a contractor who notifies DOSH and disposes of the sheets as scheduled waste SW 201. Buyers usually have a sample tested, then price a future re-roof into the offer, especially if rooftop solar is planned. The government said in January 2026 that asbestos use is under review.

How do I check a factory roof for leaks before renting?

Visit during or just after heavy rain and look at the underside of the roof for stains, rust streaks, daylight at the sheet laps and sagging insulation, then check the floor and walls for tide marks. Ask the landlord for the roof's age and repair records, and have a roofing contractor check the top with proper fall protection. Agree in writing which leaks the landlord fixes before handover.

How long does a factory roof last in Malaysia?

It depends on the sheet's coating and paint system, how close the factory is to the sea or to chemical fumes, and maintenance. Sheet makers give corrosion warranties for named products under conditions, and one maker's Malaysian page advertises up to 36 years for its prepainted steel. Ask for the installation date and the warranty certificate rather than relying on a rule of thumb.

How much does a new factory roof cost?

There is no official rate; it varies with the roof area, the sheet and insulation, removal of the old sheets (asbestos costs more to remove and dispose of), access and safety, and whether the factory keeps working. Get at least three quotes on the same written scope. Rebuilding more than half the roof also needs the council's prior written permission under Act 133.

Is asbestos roofing allowed in Malaysia?

Yes, for now. DOSH's 2017 removal guideline says materials containing chrysotile asbestos are still used in Malaysia, though not in government buildings, and in January 2026 the environment minister said the use of asbestos based materials was under review after calls for a full ban. Removal must follow the DOSH guideline, and the waste is scheduled waste SW 201.

How do I know if my factory roof is asbestos?

Grey corrugated fibre cement sheets on an older factory are the usual sign, but only a sample tested by a laboratory confirms it. Do not break off a piece yourself, because broken sheets release fibres. Ask the seller or landlord whether a test was ever done.

Is a building inspection needed when buying a used factory?

For most used factories, yes. Act 133's periodic engineer's inspection applies only to buildings above five storeys, so a factory usually has no recent structural report, and a bank valuation is not a condition survey. Commission a structural engineer plus roof, electrical and termite checks before you commit, and make the SPA say what happens if defects are found.

Is it safe to buy a factory that had a fire?

It can be, if a structural engineer assessed the steel after the fire, with hardness tests and replacement of heated bolts, and the repairs were approved by the council. Ask for the Bomba and insurer reports, the engineer's report, the approvals and the records showing the wiring and fire systems were restored.

FactoryHub is dedicated to helping every client find the right factory or warehouse. To arrange viewings and line up the checks in this guide for a shortlisted unit, call Peter Tan (REN 12771) at 016-666 6872 or Jason Low (PEA 1478) at 012-288 1834.