Key Takeaways

  • Yes, you can buy a factory with a pollution history, but find out before the deal goes unconditional. Under the Department of Environment's (DOE) Contaminated Land Management and Control Guidelines No. 1, the seller should disclose all soil and groundwater information, and the buyer is expected to assess soil and groundwater as part of due diligence before the transaction.
  • A Phase 1 environmental site assessment is a desk study, interviews and a site walk; Phase 2 is drilling, groundwater wells and laboratory tests. DOE's Guideline No. 2 says land being transferred should get the initial assessment (Phase 1), and the detailed assessment (Phase 2) follows when Phase 1 points to possible contamination.
  • The polluter pays, until the polluter is gone. If the party that caused the contamination is no longer in operation in Malaysia, the guidelines put the clean-up on the current land owner. After completion, that is you.
  • The guidelines are not yet regulations, but the penalties around them are real. DOE's own FAQ says it is drafting regulations so that Section 24 of the Environmental Quality Act 1974 can be enforced. Since 7 July 2024, soil pollution under Section 24 carries a fine of RM50,000 to RM500,000, and polluting inland waters, which the Act defines to include subsurface water, carries jail of up to five years and a fine of up to RM10 million.
  • Protect yourself in the letter of offer, not only the SPA. Make the purchase conditional on a satisfactory assessment by your own consultant, get written seller disclosure and warranties, agree who pays for any clean-up and how that is secured, and record a baseline at handover.

This guide explains the DOE framework for buyers. It is not legal advice: have your lawyer draft the clauses for your deal.

Can you buy a factory that had pollution in Malaysia?

Yes. Nothing in Malaysian law stops the sale of land that was used by a polluting industry. What changes is the risk you take on: once you are the registered owner, the contamination underneath becomes yours to assess and, in some cases, to pay for.

DOE's framework applies to any land that is being used or was previously used for polluting activities, meaning any business that extracts, manufactures, stores, uses, handles or disposes of chemicals or scheduled waste, and to any land changing use between polluting and non-polluting activities (Guideline No. 1, section 1.2). Appendix A of the same guideline lists 47 activities that can contaminate soil and groundwater. Those you meet most often in a Selangor factory search include:

  • metal surface treatment or coating, such as plating and coating lines
  • electronics manufacturing, repairing and reconditioning
  • printing, and paint manufacturing and formulation
  • chemical manufacturing and storage, and storage tanks for fuel and chemicals
  • motor vehicle workshops, engine reconditioning, transport depots and port activities
  • battery manufacturing or recycling, drum and tank reconditioning, and waste storage or recycling
  • electrical transformers

The list also covers any site that may have received hazardous substances migrating from adjacent land. A clean-looking warehouse next to a plating plant can still carry someone else's contamination.

What decides whether a pollution history is a deal breaker

  • What the contamination is and where it sits. DOE defines contaminated land as a site where substances occur above naturally occurring metal levels and pose or are likely to pose a hazard, or exceed the Site Screening Levels (SSLs) in Guideline No. 1.
  • What you will use the land for. The SSLs have separate figures for industrial and residential soil, so a site that passes for continued factory use may not pass if you plan to redevelop it for another use. A change of land use is itself one of the triggers for the framework.
  • Whether there is an exposure pathway. Guideline No. 2 is explicit that exceeding an SSL does not by itself mean the risk is unacceptable; it means further site-specific evaluation may be warranted. SSLs are screening levels, not clean-up targets.

Why this is a factory question and not a house question

The guidelines are written around industrial land use, and their list of polluting activities is industrial. On a factory purchase the land carries the history of every process that ran there, your own process may later be blamed for whatever is found, and the next buyer or tenant may run an assessment of their own when you sell.

Is an environmental site assessment needed when buying a factory?

For land with an industrial history, DOE expects one. Guideline No. 2 says an initial assessment (Phase 1) should be performed for land that is being transferred, as part of the due diligence exercise, as well as land to be redeveloped for a different use and land currently used for polluting activities. Guideline No. 1 adds that the seller has a duty to disclose all soil and groundwater information and that the buyer is responsible for performing a soil and groundwater assessment before the transaction.

On legal status, DOE's FAQ on scheduled waste and contaminated land states that the three guidelines published in June 2009 remain guidelines until the regulations on soil pollution are gazetted, that DOE is drafting those regulations so that Section 24 can be enforced, and that use of the guidelines is strongly encouraged. The Skrine newsletter that reviewed the guidelines when they went online described the same position. So no Act today makes an ESA a condition of registering the transfer. It is still the standard DOE and consultants work to, and it is the only way to know what sits under the slab you are paying for.

When to stop at Phase 1, go to Phase 2, or take a baseline

Phase 1 finding What Guideline No. 2 says comes next Why it matters to the buyer
Potential contamination from the site or its neighbours Detailed assessment (Phase 2) Measures what is in the soil and groundwater before you commit
No potential contamination identified Baseline environmental site assessment recommended, especially where a polluting industry will use the land Records the condition at purchase so later findings can be compared with it
Results above the SSLs Risk assessment, Tier 2 or Tier 3 Decides whether clean-up is needed and to what level
Risk above acceptable levels Remediation under Guideline No. 3 Cost and time that must be priced into the deal
Consultant inspecting a stained factory floor and an old storage tank during a Phase 1 site walk
IllustrationConsultant inspecting a stained factory floor and an old storage tank during a Phase 1 site walk

What happens in a Phase 1 and a Phase 2 environmental site assessment?

Phase 1: the initial assessment

Guideline No. 2 describes Phase 1 as a non-intrusive investigation: no samples are taken. It has three parts.

  1. Desktop study: the chronological history of uses on the site; chemicals used and stored and wastes generated or disposed of; past spills, leaks and disposal practices; the location, age and construction of above-ground and underground fuel or chemical tanks; underground utilities; the zoning of the site and its neighbours; previous investigations; nearby rivers and drains; groundwater depth and flow direction; and human receptors within at least 500 metres.
  2. Site reconnaissance: a visual inspection of buildings and hard standing, the age and condition of chemical piping and tanks, surface staining, run-off patterns, the condition of vegetation and signs of products migrating off site.
  3. Conceptual site model and report: a picture of possible sources, pathways and receptors, with a recommendation on whether sampling is needed and where.

Phase 2: the detailed assessment

Phase 2 is the soil and groundwater investigation: soil boring, groundwater monitoring wells and sampling, with laboratory results compared against the SSLs. Points from Guideline No. 2 worth knowing:

  • At least three spatially distributed wells are needed to work out groundwater flow direction.
  • Where lighter-than-water liquids such as fuel are suspected, borings should reach at least 3 metres below the static groundwater level.
  • Soil vapour wells are left for 5 days to reach equilibrium before sampling.
  • A copy of the detailed assessment report shall be submitted to DOE. Agree with the seller in writing, before drilling starts, who commissions the work, who receives the report and who deals with DOE.

The guideline sets a minimum number of sampling points by site area:

Site area Roughly Minimum sampling points
1,000 m² 10,764 sq ft 6
2,000 m² 21,528 sq ft 7
4,000 m² 43,056 sq ft, about 1 acre 11
5,000 m² 53,820 sq ft 13
10,000 m² about 2.5 acres 21
20,000 m² about 4.9 acres 30
40,000 m² about 9.9 acres 50
50,000 m² about 12.4 acres 55
Over 50,000 m² Case by case, at least 55

How much does it cost and how long does it take?

DOE does not publish fees and there is no official scale. The cost follows the site area (and so the sampling points above), the depth to groundwater, the chemicals suspected and the laboratory tests ordered. For a sense of scale, detached factories in the JPPH-registered transactions for Klang and Port Klang have a median land area of 47,318 sq ft, about 4,396 m², which falls between the 11 and 13 point rows; the median registered price for that type is RM14.9 million. Ask at least two consultants for an itemised quote and a programme covering fieldwork, laboratory turnaround and reporting, and set the conditional period in your offer to fit it.

Who should do the work

Guideline No. 1 sets out qualified roles. A Registered Environmental Site Assessor, for example, needs a relevant science or engineering degree, at least 3 years of contaminated land work or professional training, and at least 5 ESA projects. A consulting firm needs at least three qualified personnel, at least 10 soil and groundwater projects and professional liability insurance of no less than RM1,000,000. DOE's FAQ notes these requirements take effect only once the soil pollution regulations are gazetted, so use them as your benchmark when choosing a consultant rather than expecting a DOE register.

Who is liable for clean-up of contaminated factory land?

The short answer: the polluter, if it can be identified and is still operating; otherwise the current land owner. Guideline No. 1 (section 2.2) sets out the chain:

  1. The current land owner must find out whether there is subsurface contamination, assess whether the risk is unacceptable and, if it is, propose and carry out a remediation action plan.
  2. If the owner shows through a properly conducted ESA that the contamination was not caused by its own current or past operations, it must identify the polluter. The polluter may carry out its own investigation, and unless it can show the contamination was not caused by its activities, it is responsible for the remediation.
  3. If the identified polluter is no longer in operation in Malaysia, the responsibility is borne by the current land owner.
  4. In a dispute, the Director General of Environmental Quality decides who is responsible.

Under the polluter pays principle, a polluter can be the land owner, the occupant or user, or the owner of the chemical, product or waste. The land owner must notify DOE of subsurface contamination, and at the end of a clean-up the responsible party submits a project closure report to DOE for approval (Guideline No. 3, section 6.5). Guideline No. 3 also shows why clean-up cost varies so much: options range from capping and containment, which manage contamination but restrict future use, to treating or removing the soil and groundwater.

The Environmental Quality Act behind the guidelines

  • Section 47 of the Environmental Quality Act 1974 lets the Director General take action to remove or mitigate pollution caused in breach of the Act and recover all the costs from the person responsible; the sum becomes a first charge on any property or interest held by that person.
  • Higher penalties under the Environmental Quality (Amendment) Act 2024, Act A1712, which Malay Mail reported would take effect on 7 July 2024:
    • soil pollution (Section 24): a fine of RM50,000 to RM500,000, or jail of up to five years, or both, plus up to RM1,000 a day while the offence continues after a DOE notice;
    • pollution of inland waters (Section 25), defined in the Act to include subsurface water: jail of up to five years and a fine of RM50,000 to RM10 million;
    • placing, depositing or disposing of scheduled waste on land other than at prescribed premises (Section 34B): jail of up to five years and a fine of RM100,000 to RM10 million.

What this means for you as the buyer

If the seller is a company that closes down, is wound up or moves its operations out of Malaysia after the sale, the guideline's fallback lands on you as the current owner. That is why protection has to be in place before completion, and why a seller's promise to "sort it out later" is worth little without money held back to support it.

How do you protect the buyer in the offer letter and SPA?

In Malaysia the letter of offer is usually the first document signed, records the key terms including any conditions precedent, and is normally binding, as Baker McKenzie's Malaysia real estate guide explains. Put the environmental conditions in the offer itself. A factory SPA has no prescribed form, so these terms are negotiable; our guide to factory SPA clauses covers the rest of the agreement.

Points to raise with your lawyer:

  1. Condition precedent: the purchase is subject to a Phase 1, and a Phase 2 if Phase 1 recommends it, by a consultant you appoint, with results acceptable to you; if not, the deposit is refunded and the deal ends.
  2. Access: the seller gives access for drilling and well installation, and you agree how the floor and ground are made good after sampling.
  3. Disclosure: the seller hands over every previous environmental report, DOE notice, compound and approval, records of spills and tanks, and the scheduled waste records it reports through DOE's eSWIS system.
  4. Warranties: the seller warrants compliance with laws affecting the land, including environmental laws (a typical seller warranty in Malaysian acquisitions, per Baker McKenzie), that the disclosure is complete, and that there are no undisclosed tanks, buried waste or DOE proceedings.
  5. Clean-up allocation: if contamination is found, choose a route in writing: the seller remediates to DOE closure before completion, the price is reduced, or part of the price is held by the stakeholder lawyer until closure is approved.
  6. Vacant possession: chemicals, drums, sludge and scheduled waste are removed before handover, with the disposal records handed to you.
  7. Baseline at completion: record soil and groundwater conditions at handover. It protects you when you sell, and when a future tenant's process is questioned.
Buyer and seller reviewing contract terms beside soil sample jars taken from a factory site
IllustrationBuyer and seller reviewing contract terms beside soil sample jars taken from a factory site

What should you check on site before commissioning a Phase 1?

A land search shows the owner, charges and caveats; it does not show contamination. Walk the site with this list, drawn from the Guideline No. 2 desk study and reconnaissance items:

Look for Why it matters
Stained or patched floor slabs around old machine bases Possible spills seeping through cracks
Fuel or chemical tanks, above or below ground, and their filling points Leaking tanks and pipes are a common source
An effluent treatment plant, sludge beds or old effluent pits Effluent and sludge handling history
A scheduled waste store, drum yard or burnt patches Waste handling and disposal practice
Existing monitoring wells Evidence of a past investigation: ask for the reports
Transformer yard Electrical transformers appear on the DOE list
Neighbouring plating, chemical or recycling plants Contamination can migrate onto your land
Drains or a river next to the lot A pathway and a receptor
Dead vegetation, chemical odour or an oily sheen in drains Signs of migration

For effluent systems, see our IETS guide. For whether your process suits the land, see light, medium and heavy industry zoning.

Full due diligence before buying a factory: where does the environmental check fit?

The environmental assessment runs alongside the title, building and tax checks in our factory due diligence checklist, not after them. A practical sequence:

  1. Sign the offer with the ESA condition and a conditional period that fits the consultant's programme.
  2. Run the land search, CCC and plan check, quit rent and assessment, power and Bomba checks in parallel with Phase 1.
  3. Commission Phase 2 only if Phase 1 recommends it.
  4. Negotiate on the results: price, seller remediation or a retention.
  5. Sign the SPA with disclosure, warranties and the agreed clean-up route.
  6. Take the baseline record at handover.

Common mistakes

  • Signing an unconditional offer and testing afterwards.
  • Relying on the seller's old report without updating it or getting the consultant's permission to rely on it.
  • Treating any SSL exceedance as a disaster, or brushing it off as a formality.
  • Testing soil but not groundwater.
  • Forgetting what the neighbours make.

Frequently Asked Questions

Can I buy a factory that had pollution in Malaysia?

Yes. The law does not stop the sale, but under DOE's guidelines the current land owner carries the duty to assess the land and, if the polluter is no longer operating in Malaysia, to clean it up. Make the purchase conditional on an environmental site assessment so you know the problem and its cost before you are bound.

Is an environmental site assessment needed when buying a factory in Malaysia?

DOE's Guideline No. 2 says land being transferred should have an initial assessment as part of due diligence, and Guideline No. 1 says the buyer should assess soil and groundwater before the transaction. DOE describes them as guidelines until soil pollution regulations are gazetted, but strongly encourages their use.

What is the difference between a Phase 1 and a Phase 2 environmental site assessment?

Phase 1 is non-intrusive: records, interviews and a site walk to find possible contamination. Phase 2 drills boreholes, installs groundwater wells and sends samples to a laboratory to compare what is there against DOE's Site Screening Levels.

Who pays to clean up contaminated land, the buyer or the seller?

The polluter pays under DOE's framework, and the polluter can be the land owner, the occupant or the owner of the chemical or waste. If the polluter is no longer operating in Malaysia, the current land owner bears it, so agree in the SPA whether the seller remediates, reduces the price or leaves a retention.

Are DOE's contaminated land guidelines law?

Not yet as regulations. DOE says it is drafting regulations so that Section 24 of the Environmental Quality Act 1974 can be enforced. The Act itself is in force, and since 7 July 2024 soil pollution under Section 24 carries a fine of RM50,000 to RM500,000.

Does a tenant need an environmental site assessment?

The guidelines name the occupant or user as a possible polluter. A landlord letting to a process that uses chemicals, or a tenant taking over an old plant, can agree a baseline assessment at the start of the lease so later findings can be compared with it.

What does full due diligence before buying a factory cover?

Title and encumbrances, the CCC and approved plans, unauthorised extensions, quit rent and assessment, power and Bomba, searches on the seller and, for land with an industrial past, an environmental site assessment. Run them in parallel during the conditional period of the offer.

FactoryHub is dedicated to helping every client find the right factory or warehouse. If you are weighing a factory with an industrial past in Klang, Port Klang or elsewhere in Selangor, talk to Peter Tan (REN 12771) at 016-666 6872 or Jason Low (PEA 1478) at 012-288 1834, both registered with BOVAEP under CID Realtors Sdn Bhd.