Key Takeaways
- There is no standard, government-issued SPA for a factory in Malaysia. The statutory sale and purchase agreements under the Housing Development Act are for housing. A factory SPA is a negotiated contract, so every clause is open to discussion before you sign.
- The SPA is usually signed two to three weeks after the offer, when the deposit is topped up to 10% of the price. Completion is commonly three months later, with an extension at late interest if the agreement allows one.
- The clauses that decide most disputes are the conditions precedent (state consent, foreign buyer approval), when the completion period starts, vacant possession, what fixtures and power supply stay with the building, and what happens when one side defaults.
- For a factory, the schedule of fixtures matters as much as the price. If the SPA does not list the cranes, racking, transformer or generator, do not assume they are included.
- The buyer has duties after signing too: the Real Property Gains Tax retention must be paid to LHDN within 60 days, and the transfer must be stamped before it can be registered.
A Sale and Purchase Agreement (SPA) for a factory in Malaysia is the contract that fixes the price, the deposit, the conditions that must be met, the completion date and what each side can do if the other fails to perform. Unlike a new house bought from a developer, a factory has no prescribed form, so the wording is drafted by the lawyers and can be negotiated. This guide walks through the clauses a factory buyer should read closely, and where a factory SPA differs from a house SPA. It is general information, not legal advice.
Is there a standard SPA for a factory in Malaysia?
No. The Housing Development (Control and Licensing) Regulations prescribe fixed agreements for housing accommodation bought from a licensed developer, such as Schedule G for landed homes and Schedule H for strata homes. Those forms do not apply to factories, warehouses or industrial land.
A factory SPA, whether a sub-sale or a purchase from a developer of an industrial park, is governed by ordinary contract law and the National Land Code. Two consequences follow:
- Nothing is automatic. Late delivery compensation, a defect liability period or a fixed completion period exist only if the SPA says so.
- Everything can be negotiated. The first draft usually comes from one side's lawyer and favours that side. The other side is expected to ask for changes.
Where does the SPA sit in the purchase?
- Offer letter signed, with an earnest deposit of about 2% to 3%.
- SPA signed, commonly 14 to 21 days later, and the deposit topped up to 10%.
- Conditions met: loan approved, state consent or other approvals obtained where needed.
- Completion, commonly three months from the SPA or from the date the last condition is met: balance paid, transfer presented for registration, keys handed over.
Our step by step guide to buying a factory covers the whole sequence, and the due diligence checklist covers the checks to finish before you sign.
Which clauses should a factory buyer check in the SPA?
| Clause | What to look for | Why it matters for a factory |
|---|---|---|
| Parties and authority | The seller's name matches the title. A company seller gives a board resolution and the signatory has authority | Many factories are owned by companies, sometimes by companies under financing restrictions |
| Description of the property | Title number, lot number, land area, category of land use and express condition, as shown on the land search | The land must be for industrial use, and the express condition can limit what you may do on it |
| Price, deposit and stakeholder | Who holds the deposit, and when it is released to the seller | A deposit held by a lawyer as stakeholder is easier to recover than one paid straight to the seller |
| Conditions precedent | State consent to transfer, foreign buyer approval, any other approval, each with a time limit and a refund if it is not obtained | Leasehold industrial titles often carry a restriction in interest that needs state consent |
| Completion period | The date it starts, the length, and the extension period and late interest rate | If it starts on the SPA date while consent is still pending, time can run out through no fault of yours |
| Vacant possession or tenancy | Whether the factory is delivered empty or sold with a tenant, and what happens to the tenant's deposit | A tenant who will not leave delays your move-in; a good tenant may be the reason you are buying |
| Fixtures, machinery and power | A schedule listing what stays: cranes, racking, transformer, switchboard, generator, compressors, air-conditioning | Replacing an overhead crane or a power upgrade can cost more than the legal fees |
| Condition and approvals | Whether the sale is as is where is, and whether the seller warrants that extensions and mezzanines have approved plans | Unapproved extensions are common in older factories and affect the loan and the insurance |
| Encumbrances | How the seller's existing bank charge will be redeemed, and removal of any caveat | The balance price is normally used to redeem the seller's loan before the transfer is registered |
| Outgoings | Quit rent, assessment, utilities and sewerage charges apportioned to the handover date | Arrears follow the land, not the previous owner |
| Default | What the seller keeps if the buyer defaults, and what the buyer can claim if the seller defaults | Typical drafts let the seller forfeit the deposit, and let the buyer choose between a refund with agreed damages and specific performance |
| RPGT and costs | The retention sum for Real Property Gains Tax, and who pays which fees and duties | The retention duty is the buyer's by law |
Conditions precedent and the completion clock
If the title has a restriction in interest, the land office will not register the transfer without the State Authority's consent. If the buyer is a foreign company or a company with majority foreign shareholding, a separate state approval applies; see our guide for foreign companies buying a factory.
Ask for three things in the SPA: a fixed period to obtain each approval, an automatic extension if the application is still being processed, and a full refund of the deposit if the approval is refused through no fault of the buyer. Then make sure the completion period starts on the date the last approval is obtained, not on the date of the SPA.
Vacant possession, tenants and what stays in the building
State plainly whether the factory is sold with vacant possession. If a tenant is in occupation, the SPA should attach the tenancy agreement, state the rent and the deposit held, and say whether the tenancy is taken over or ended before completion.
List the fixtures in a schedule and attach photographs. For a factory the list usually includes the incoming power supply and its rating, the transformer or substation equipment that belongs to the owner, overhead cranes, racking, fire fighting equipment, air-conditioning and any machinery included in the price. If the seller is removing something, say who repairs the floor and the walls afterwards.
Default clauses
Read both halves. If the buyer cannot complete, a typical clause lets the seller keep the 10% deposit as agreed damages and return anything else paid. If the seller refuses to complete, the buyer's usual options are specific performance, which means asking the court to order the transfer, or ending the agreement and getting the deposit back with an agreed sum on top. Check that the two sides' remedies are balanced, and that late interest is charged only on the unpaid part of the price.
What do you pay when you sign the SPA?
- The balance of the deposit, so that the total paid reaches 10% of the price.
- Legal fees, on the Solicitors' Remuneration Order 2023 scale, plus service tax and disbursements. Our lawyer fee guide has worked examples, and the legal fees and stamp duty calculator gives an estimate for your price.
- Stamp duty on the SPA itself is only a nominal fixed amount. The larger, ad valorem duty is charged on the transfer; see our guide to the Memorandum of Transfer.
If you are borrowing, the loan agreement has its own legal fee and stamp duty. The factory loan guide explains margins and documents.
What happens after the SPA is signed?
- Stamping. The lawyer stamps the SPA and later the transfer.
- Private caveat. The buyer's lawyer can enter a private caveat on the title so that the seller cannot deal with the land while the sale is pending. A private caveat lapses after six years unless the court extends it (Chambers and Partners).
- RPGT retention. The buyer must retain part of the price and pay it to LHDN within 60 days after the date of disposal. The rate is 3%, 5% or 7% depending on the seller's category, and late payment adds 10% of the unpaid amount (LHDN).
- Applications. Consent to transfer, and the loan documents, are prepared and submitted.
- Completion. The balance is paid, the seller's charge is discharged and the transfer is registered.
Common mistakes with a factory SPA
- Signing the offer letter as if it were only a booking. Terms agreed in the offer are hard to change in the SPA, so put the important conditions in the offer.
- Leaving the fixtures to a verbal promise. If it is not in the schedule, it is not in the sale.
- Letting the completion period start before consent is obtained.
- Assuming the tenant will leave. Get the tenancy agreement and read its term and renewal option.
- Skipping the approved building plans. Compare what is built with what was approved before you sign, not after.
A law firm that handles factory SPAs: Chieng & Lum Associates
FactoryHub is an estate agency and does not give legal advice or draft agreements. Buyers and sellers appoint their own lawyers. One firm our clients can speak to is Chieng & Lum Associates, Advocates & Solicitors.
According to the firm's website, Chieng & Lum Associates was founded in 2018 and has offices in Seremban, Negeri Sembilan and Petaling Jaya, Selangor. Its founding partners have been in practice since 2014. The firm serves clients in English, Chinese and Bahasa Malaysia, welcomes cross-border clients and offers online consultation.
| Property and conveyancing | Sale and purchase agreements for sub-sale, developer, industrial and commercial property, tenancy agreements, leases, loan and refinancing documents, discharge of charge, caveats and auction purchases |
| Corporate and commercial | Business contracts, joint venture and partnership agreements, corporate advisory, legal retainers and financing documents |
| Estate planning and family | Wills and trusts, probate and letters of administration, divorce and custody |
| Dispute resolution | Mediation, negotiation, arbitration and settlement agreements |
| Seremban office | No. 26-3, Second Floor, Jalan KS3, Kepayang Sentral, Taman Bukit Kepayang, 70200 Seremban, Negeri Sembilan |
| Petaling Jaya office | 74A & 98A, Jalan SS21/39, Damansara Utama, 47400 Petaling Jaya, Selangor |
| Contact | Phone or WhatsApp +6018-981 6866, website chienglumassociates.com |
The Seremban office is close to the Nilai and Senawang industrial areas, and the Petaling Jaya office serves buyers in Shah Alam, Klang and the wider Klang Valley. You are free to appoint any lawyer you choose; FactoryHub receives no fee from the firm.
Frequently Asked Questions
Is there a standard SPA for buying a factory in Malaysia?
No. The prescribed agreements under the Housing Development Act apply to housing. A factory SPA is drafted by the parties' lawyers, and its terms are negotiable.
How long after the offer is the factory SPA signed?
Commonly 14 to 21 days after the offer letter, which is market practice and not a legal rule. The date is written into the offer.
How much is the deposit on a factory SPA?
Usually 10% of the price in total: about 2% to 3% with the offer and the rest when the SPA is signed.
How long is the completion period?
Commonly three months from the SPA, or from the date the last condition is met, with an extension at late interest if the SPA provides one. The parties can agree a different period.
Can I back out after signing the SPA?
Not without consequences. If the buyer fails to complete, the seller can usually forfeit the deposit. If a condition precedent such as state consent is not met through no fault of the buyer, a well drafted SPA returns the deposit.
Do the machines and cranes come with the factory?
Only if the SPA says so. Ask for a schedule of fixtures and equipment, with photographs, attached to the agreement.
Can one lawyer act for both buyer and seller?
Each side normally appoints its own lawyer, and each pays its own legal fee. The buyer's lawyer may also act for the buyer's bank on the loan documents.
Does a foreign company sign a different SPA?
The agreement is similar, but it must be conditional on state approval for the foreign acquisition, and the price must meet the state's minimum for foreign buyers.
This guide is general information compiled in November 2026 and is not legal advice. Each sale is different, so have your own lawyer review the agreement before you sign.
Buying or renting, talk to us
FactoryHub is the industrial-only platform of Peter Tan (REN 12771) and Jason Low (PEA 1478), registered with BOVAEP under CID Realtors Sdn Bhd E(1) 1855. We handle both rent and sale, and we co-broke across the whole market, so if the right unit is another agent's listing we will still put it in front of you.
Send us the numbers that decide the shortlist: required amps, built-up area, floor loading, preferred area and target date. We reply with what actually exists, including units that are not advertised publicly. For 800A to 4,000A+ requirements, see high-power factories in Selangor.