Technology & Innovation

Data Centre Supplier Factory in Selangor 2026: Banting, Dengkil and the Specs You Need

Selangor's data centres must have 30% local content. Here is where M&E, switchgear, cable and cooling suppliers should set up, from Banting to Dengkil, and what factory specs they need before 2027.

Published: October 10, 2026
12 min read
110 views
Data Centre Supplier Factory in Selangor 2026: Banting, Dengkil and the Specs You Need

Key Takeaways

  • Selangor approved 39 data centre projects from 2021 to 2025, and several large campuses (Google at Elmina, AIMS in Cyberjaya, DayOne in Dengkil) are due to complete in 2027.
  • Data centre investments in Selangor must have 30% local content. That rule is the lever that can pull Malaysian suppliers, and their factories, into the state.
  • The suppliers that need premises are M&E contractors, switchgear and busduct assemblers, cable stockists, cooling equipment and spares holders, and cleanroom and fit-out contractors. Most need a 0.5 to 5 acre semi-D or detached factory with a crane, solid power and yard space, not data centre land.
  • The supplier arc runs from Shah Alam and Puchong down to Dengkil, Jenjarom and Banting, with Kapar for the north-west sites. BAC's new cooling plant is in Nilai, just across the Negeri Sembilan border.
  • The main risks are water and power approvals, big equipment plants choosing Johor, and AI chip export controls that touch some data centre tenants.

This guide is not about the data halls. It is about the contractors, panel builders, cable and cooling suppliers and fit-out firms around them, who need a factory or warehouse within reach of the sites. If you are sizing space for a data hall itself, see our data centre space and amperage guide.

The pipeline: where Selangor's data centres are going

Selangor approved 39 data centre projects between 2021 and 2025, according to MIDA and MDEC data given in the state assembly. The named sites have spread well beyond Cyberjaya.

Operator Location What is known Timing
Google, built and leased by Sime Darby Property Elmina Business Park Two data centres on 49 and 77 acres (Sime Darby Property) Second phase by end-December 2027
AIMS Cyberjaya About 10 acres for a 200MW AI data centre (DCD) Completion targeted for 2027
Bridge Data Centres IOI Industrial Park, Banting 136.03 acres bought from IOI Properties (IOI Properties) SPA signed January 2026
DayOne Kapar 157.07 acres bought in the first half of 2026 (Knight Frank) Not disclosed
DayOne Mah Sing's DC hub, Dengkil 78.8 acres (The Malaysian Reserve) Completion expected in the second half of 2027

For a supplier, the pattern matters more than any single deal: demand now sits in a ring around Cyberjaya, from Elmina and Kapar to Dengkil and Banting.

Why data centre suppliers need premises close by

The 30% local content rule

The Selangor government told the state assembly that data centre investments must have 30% local content so that domestic companies benefit. The statement does not say how the 30% is measured, but operators and main contractors now have a clear reason to show Malaysian suppliers on their lists. MIDA is pushing the same direction nationally under its localisation agenda.

The work is already flowing to local firms

Sunway Construction's order book passed RM10b on a new data centre job in August 2026. On the equipment side, EITA Resources won a RM40.9m busduct supply contract for a Johor data centre.

Sum Technology, a Petaling Jaya cleanroom and mission-critical M&E contractor, disclosed in its prospectus a Jenjarom factory under renovation, due to start operations by the third quarter of 2026, plus a rented 1.5-storey semi-D factory in Banting next to it. In Shah Alam, switchgear maker TAMCO signed with Hoymiles in July 2026 to assemble 5MWh and 6MWh liquid-cooled battery storage systems at its Shah Alam facility, with integration, testing, commissioning, servicing and long-term maintenance also done locally.

Service, spares and maintenance last as long as the building, and on-site energy is growing too: DayOne signed an MoU with TNB GenCo to explore up to 1.5GW of on-site generation and battery storage for a new Selangor campus.

Supplier type, premises and specs

Suppliers need working factories, not data halls. This is our working view, not a regulatory standard; check it against your equipment list.

Supplier type Typical premises Specs to check Watch for
M&E contractor (site base and prefabrication) Semi-D or detached factory, 0.5 to 2 acres, office plus workshop Yard for pipe spools and cable drums, trailer access, three-phase power for welding and fabrication, staff parking Approval to store materials in the open yard
Switchgear, switchboard and busduct assembly Detached factory, 1 to 5 acres Overhead crane sized for the heaviest panel or busduct run, high-amp supply for routine testing, separate test bay, tall doors for crated panels Power upgrade lead time, landlord consent for crane and test bay
Cable and cable tray stockholding Warehouse with hardstanding yard Floor loading for drum racks, forklift or crane capacity, container access, covered drum storage Slab condition, drainage, yard surfacing
Cooling equipment and spares (chillers, CRAH units, pumps, filters) Warehouse or light industrial unit Clear height for racking, loading bays, drainage for a repair area Refrigerant storage rules; check with the authorities
Cleanroom and fit-out contractor Semi-D or detached factory with workshop Clean dry storage for panels, cutting area, dust control Noise and dust near neighbours
Battery storage and modular skid assembly Detached factory with large yard Strong floor, crane, fire separation, high power, room to test before dispatch Bomba and insurance requirements for batteries

New parks set the bar: IOI's Banting park markets detached factories with 800A power, 12m production height and dual high-voltage intake. Older terrace units often fall well short, so size your load before viewing: the factory power calculator turns welders, test sets, cranes and HVAC into an amperage estimate.

Cleanroom contractors who also serve chip plants should read our semiconductor equipment and cleanroom factory guide.

Where in Selangor suppliers are setting up

Area Data centre activity nearby Fit for suppliers
Banting Bridge Data Centres at IOI Industrial Park Newer detached stock with high power; Sum Technology's rented semi-D
Jenjarom Between Banting and Klang Sum Technology's own factory; semi-D and detached units for contractors
Dengkil DayOne at Mah Sing's DC hub; next to Cyberjaya and Sepang Site bases and spares stores serving the Cyberjaya cluster
Kapar DayOne's 157-acre site on the port side Yard-heavy users such as cable and tray stockists
Shah Alam TAMCO's facility; within reach of Elmina Established engineering base; higher prices, tighter supply
Puchong Between Kuala Lumpur, Cyberjaya and Shah Alam Smaller M&E firms needing an office with a workshop
Nilai (Negeri Sembilan) BAC's new cooling plant Cooling installers and service firms

South: Banting, Jenjarom, Dengkil. Here Selangor's newest data centre sites sit next to supplier-sized factories, the same pattern Sum Technology chose. Start with factories for rent in Banting and widen to Jenjarom if you need a detached unit with yard.

Shah Alam and Puchong. Shah Alam has the deepest pool of engineering factories, but Knight Frank has pointed to a shortage of mid to large manufacturing facilities in the Klang Valley. If you plan to stay long term, look at factories for sale in Shah Alam.

Nilai, just across the border. BAC broke ground on a US$150 million plant in Nilai on 5 August 2026. It will make closed-circuit cooling towers, adiabatic coolers, hybrid cooling and liquid cooling systems, with a 30,000 sq m first phase targeted for end-2027. For cooling installers, Nilai sits on the same corridor as Dengkil, Sepang and Cyberjaya.

Power is usually the deciding spec. If a test bay or BESS line needs more than a standard unit offers, ask us for high-power factories in Selangor, including units that are not publicly advertised, or browse high-power factories for rent in Selangor.

Timing: work back from 2027

Google's second Elmina data centre is due by end-December 2027, AIMS targets 2027 for its Cyberjaya build, and Mah Sing expects its Dengkil hub to complete in the second half of 2027. New industrial projects generally take 18 to 24 months to complete.

So a supplier that wants a working base for 2027 deliveries should shortlist in 2026 and sign by early 2027. If the building needs a TNB upgrade, ask how long it takes before you sign.

Supplier site checklist

  • Drive from the shortlisted address to each site you serve at peak hours.
  • Compare the building's TNB supply (amps and kVA) with your full load: welders, test sets, cranes, compressors and air-conditioning.
  • Check crane capacity, span and hook height against your heaviest panel, skid or cable drum.
  • Measure doors, walk the trailer turning path, and confirm the yard is hardstanding and may be used for open storage.
  • Check floor loading where drums, panels or battery modules will sit.
  • Confirm the land use allows fabrication and assembly, not only storage, with the local council.
  • For battery or refrigerant work, check fire separation and storage rules with Bomba and your insurer.
  • Ask your client what evidence it needs for the 30% local content requirement, since the published rule does not define the measure.
  • Match the lease to your contracts, with a renewal option and agreed reinstatement terms.

Risks to price in

Water and power approvals. Selangor's Menteri Besar has said there will be no data centre approval without enough water and power. Developers must provide tanks with three days of water storage, and projected data centre water demand of 632 MLD compares with Air Selangor's reserve of 1,055 MLD (The Edge, cited above). New treatment capacity arrives in stages, with Sungai Rasau stage one in 2027. Tighter approvals would push supplier demand later.

Equipment plants going elsewhere. Vertiv opened its new power and cooling equipment plant in Johor, and BAC chose Nilai. The clearer Selangor demand is from contractors, assemblers and service firms.

Export controls. Since 14 July 2025, Malaysia has required a Strategic Trade Permit for exports and transshipments of US-origin high-performance AI chips. US lawyers also warn that hosting AI workloads for Chinese entities can create export-control exposure. Check who your client's end user is before committing to premises for one job.

For how this sector fits next to auto, semiconductor and port demand, see our guide to Selangor's rising industries from 2026 to 2031.

FAQ

What does Selangor's 30% local content rule mean for data centre suppliers?

Selangor requires data centre investments to have 30% local content so that domestic companies benefit. How it is measured is not published, so ask your client what counts. It gives operators a reason to use Malaysian suppliers with local bases.

Which data centre projects in Selangor complete in 2027?

Google's second data centre at Elmina is due by end-December 2027, AIMS targets 2027 for its 200MW Cyberjaya build, and the Mah Sing DC hub sold to DayOne in Dengkil is expected in the second half of 2027.

Where should a switchgear or busduct assembler look for a factory in Selangor?

Look for detached factories in Shah Alam, Banting, Jenjarom or Dengkil, where you can reach several data centre sites. Check crane capacity, power for testing and door height first.

What factory specs does a data centre M&E supplier need?

Most need a 0.5 to 5 acre semi-D or detached factory with a yard, three-phase power, a crane sized to their heaviest item, and good trailer access. Assemblers add a test bay and higher power; stockists need floor loading.

Is Nilai in Selangor, and why does the BAC plant matter?

No, Nilai is in Negeri Sembilan, just across the border from Dengkil and Sepang. BAC's US$150 million plant there will make cooling towers, adiabatic and liquid cooling systems for data centres, with phase one targeted for end-2027.

Should a data centre supplier rent or buy a factory?

Rent if your work depends on one or two projects, and align the lease with the contract. Buy if you serve several operators, need a crane, test bay or power upgrade you would not want to leave behind, and plan to stay ten years or more.

Buying or renting, talk to us

FactoryHub is the industrial-only platform of Peter Tan (REN 12771) and Jason Low (PEA 1478), registered with BOVAEP under CID Realtors Sdn Bhd E(1) 1855. We handle both rent and sale, and we co-broke across the whole market, so if the right unit is another agent's listing we will still put it in front of you.

Send us the numbers that decide the shortlist: required amps, built-up area, floor loading, preferred area and target date. We reply with what actually exists, including units that are not advertised publicly. For 800A to 4,000A+ requirements, see high-power factories in Selangor.

Agent Licence Mobile / WhatsApp WeChat
Peter Tan REN 12771 +6016-666 6872 peterindustrial
Jason Low PEA 1478 +6012-288 1834 massiveaction

Factories and Warehouses in Port Klang

Live listings with power, ceiling height and floor loading for every unit:

Tags

#Data Centres#M&E Supply Chain#Switchgear#Selangor#Banting#Dengkil#Factory Specs
P
Peter Tan
Industrial Property Consultant · FactoryHub

Focused on Malaysia industrial real-estate research and transactions across the Klang Valley and Nilai corridors. Every article is grounded in our own deal flow and licensed-agent sources.

All articles by Peter Tan →
Looking to buy or rent a factory?
Peter Tan (REN 12771) · 016-666 6872
Licensed under CID Realtors Sdn Bhd (E(1) 1855)
Share

Related Posts

Data Centre Space in Malaysia 2026: What Amperage You Actually Need, and Which Factories Can Carry It | Technology & Innovation
Technology & Innovation
Featured

Data Centre Space in Malaysia 2026: What Amperage You Actually Need, and Which Factories Can Carry It

Not every data centre needs 100 MW. Edge nodes, colocation halls and AI inference racks fit inside existing high-power factories. Here is the amps-to-MW maths, the TNB Green Lane reality, and the 50 units at 3000A and above currently listed.

Peter Tan
Jul 30, 2026
2.3k
11 min
Semiconductor Equipment & Cleanroom Factory in Selangor 2026: Who Needs What, and Where | Technology & Innovation
Technology & Innovation
Featured

Semiconductor Equipment & Cleanroom Factory in Selangor 2026: Who Needs What, and Where

NXP is expanding in Petaling Jaya and Neways builds ASML modules in Selangor. Here is which semiconductor suppliers need which factory, the cleanroom-ready specs to check, and where to look.

Peter Tan
Oct 10, 2026
104
9 min
Selangor Aero Park 2027: Factory Guide for Aerospace and MRO Suppliers Near KLIA Sepang | Industry Trends
Industry Trends
Featured

Selangor Aero Park 2027: Factory Guide for Aerospace and MRO Suppliers Near KLIA Sepang

Selangor Aero Park phase 1 is due in 2027 with GE Aerospace as anchor tenant. Here is where Tier 2 and Tier 3 aerospace suppliers can find factories near KLIA, and the specs they need.

Peter Tan
Oct 10, 2026
60
9 min
Factory for Sale Klang 2026: Johor Data Centre Boom, Buy or Wait? | Land & Development
Land & Development

Factory for Sale Klang 2026: Johor Data Centre Boom, Buy or Wait?

Johor's data centre boom is surging, but does it change the case for buying a factory in Klang in 2026? We break down 21 consecutive quarters of industrial rental growth, the brownfield vs greenfield trade-off, and what the numbers actually mean for buyers and owner-occupiers.

Peter Tan
Oct 6, 2026
536
102 min
Data Centre Land Deal Reshapes Industrial Parks | Industry News
Industry News

Data Centre Land Deal Reshapes Industrial Parks

Eco Business Park 7 has signed a conditional sale and purchase agreement to sell two parcels of industrial land to Tera Data Centers in a billion ringgit scale deal. Meanwhile, the Kuala Langat industrial park project reached key milestones, rising construction costs are expected to gradually lift property prices, and Saudi brand Kinza will seek manufacturing partners at MIHAS 2026. This article analyses the implications for Malaysia's industrial property market.

Peter Tan
Sep 23, 2026
840
10 min
Data Centre Boom Spills Into Wider Property Gains | Industry News
Industry News

Data Centre Boom Spills Into Wider Property Gains

Data centre investments are delivering wider spillover benefits across Malaysia's industrial property market. Meanwhile, Inta Bina's earnings diversification progress has prompted a target price revision, signalling broader structural shifts beyond the data centre boom alone.

Peter Tan
Sep 7, 2026
902
9 min