Key Takeaways

  • The signed agreement decides who repairs what. No Malaysian statute splits factory repairs between landlord and tenant for every tenancy. For a registered lease (a term over three years, registered at the land office), the National Land Code fills the gaps, but only where the lease is silent.
  • The default can surprise a tenant. Under a registered lease of a whole factory with no repair clause, the tenant must keep the property in repair, roof included, and pay the rates and other outgoings, while the landlord pays quit rent (National Land Code s.230, s.231). The landlord carries the roof, main walls and main drains only when the lease covers part of a building (s.232).
  • The law bills the owner for quit rent, assessment and strata management fees, but an unpaid bill can reach the tenant: the council may seize movable property found in the factory for unpaid assessment, and quit rent left unpaid after a notice of demand can end in the land being forfeited to the State.
  • Electrical installations carry recurring legal duties. The installation must be kept in good working order by the owner, management or occupier, tested at least every five years, with protective relays calibrated every two years, and a low voltage installation fed through switchgear of 100 A or more needs a competent person's inspection at least once a month (Electricity Regulations 1994).
  • Write a repair schedule into the agreement: item by item, who maintains, who replaces, who pays the service contracts and how fast urgent repairs are done, with a dated photo record of the factory at handover.

Who is responsible for repairs in a rented factory in Malaysia?

The tenancy agreement is the first and usually the final answer. A factory, warehouse or industrial unit is let on commercial terms, and the parties are free to put the roof, wiring or air-conditioning on either side. What the law adds depends on which kind of document you signed.

Registered lease or ordinary tenancy

A tenancy of three years or less is exempt from registration and can be made in any written form (National Land Code s.223). A typical two or three-year factory tenancy is of this kind. The National Land Code's implied repair terms are written for a "lease", which the Code defines as a registered lease, so for an ordinary tenancy the written agreement is the main source. If it is silent, a dispute turns on how a court reads the agreement as a whole, which is why a vague clause costs more than a clear one.

A lease for a longer term that is registered gets implied terms "in the absence of any express provision to the contrary":

Implied term (registered lease) Who Section
Pay quit rent (rent due to the State) Landlord s.230(2)
Pay all rates, taxes and other outgoings, except quit rent and anything the law puts only on the lessor Tenant s.231(1)(a)
Keep the property in repair (whole building) Tenant s.231(1)(b)
Keep the property in repair except the roof, main walls, drains and common parts (part of a building) Tenant s.231(1)(b)
Keep the roof, main walls, main drains and common passages or installations in repair (part of a building) Landlord s.232(1)(b)
Let the landlord enter to inspect at convenient times after reasonable notice Tenant s.231(1)(c)

What "in repair" means

"In repair" means the state of repair in which a prudent owner might reasonably be expected to keep the property, and a repair covenant does not require the building to be put into a better state than it was in when the lease began (s.233). In practice this makes the handover record decisive: whatever is not documented at the start is hard to argue about at the end.

Factory roof leaks: is the owner or the tenant responsible?

It depends on the agreement first and the cause second. Under a registered lease of a whole detached or semi-detached factory with no repair clause, the default puts the roof on the tenant, because the roof exception applies only when the lease covers part of a building. Where the agreement does deal with the roof, read three things: who repairs the roof structure and sheets, who keeps gutters and downpipes clear, and who pays for damage caused by works on the roof.

Who should carry which kind of leak

A balanced clause for a detached, semi-detached or large warehouse usually follows the cause:

Cause of the leak Fair allocation to negotiate
Corroded or aged roof sheets, failed fasteners, cracked skylight sheets, defects present at handover Landlord, as part of the building fabric
Gutters and outlets blocked by leaves or dust that routine cleaning would have cleared Tenant, as routine upkeep, with the frequency written in
Holes cut for exhaust ducts, chimneys, solar brackets or signage installed by the tenant Tenant, including the reinstatement at the end
Storm damage and sudden events Repair by whoever the clause names, with the claim made on the building insurance

Damage to the tenant's stock is a separate question from repairing the roof. Our guide to factory insurance for landlords and tenants explains whose policy responds.

What to check on site before you sign

  • Visit after heavy rain and look for water stains on the floor slab, rust streaks on wall cladding and damp patches under skylights.
  • Look up for patched or replaced sheets, sagging gutters and downpipes that look too small for the roof area.
  • Ask the owner for the roof repair history and any warranty on recent roof works.
  • Record every defect with dated photos in the handover report and get the landlord to sign it.

If the landlord does not repair

Give written notice with photos and ask for a date. Under a registered lease with no contrary clause, if the property becomes wholly or partly unfit for use through no fault of the tenant, the rent or a just proportion of it stops until it is fit again, and if it is not made fit within six months the tenant may end the lease with one month's written notice (s.232(1)(c)). For an ordinary tenancy, only the agreement gives a right to repair and deduct or to withhold rent, so ask for such a clause before signing rather than assuming it.

A worker clears a blocked factory roof gutter while the landlord and tenant check the leak
IllustrationA worker clears a blocked factory roof gutter while the landlord and tenant check the leak

Who repairs the electrical system, switchboard and wiring?

TNB owns the meter (myTNB FAQ). Everything on the factory side of it, the main switchboard, cables, distribution boards, busbars and any high voltage switchgear, is the "installation". The Electricity Regulations 1994 put the duty to keep it in good and working order on "the owner, management, licensee or occupier of the installation" (regulation 110). The law accepts either side, so the agreement must say which one.

Recurring duties that cost money

Duty under the Electricity Regulations 1994 Rule
Test the whole installation (non-domestic) At least once every five years, by a competent person (reg. 110(3))
Check, test and calibrate protective relays and devices At least once every two years (reg. 110(4))
Inspection visits, installation up to 600 V fed through switchgear rated 100 A or more At least one visit a month (reg. 67(2)(a))
Inspection visits, installation above 600 V up to 11,000 V At least two visits a month (reg. 67(2)(b))
Keep a book of inspection records and reports Owner, management or licensee, open to the Energy Commission (reg. 68(3))
Certificate of registration of an installation, where required Valid one to five years (reg. 3(3))

The visits must be made by an Electrical Services Engineer, a Competent Electrical Engineer or, for low voltage, an Electrical Supervisor (reg. 67(1)). For a high-power factory these service contracts are a real monthly cost, so name who appoints and pays the competent person.

A fair split for wiring

  • Landlord: the installation as handed over, including replacing aged main switchgear and cables at the end of their life, and producing the latest test report and inspection book.
  • Tenant: routine checks and the monthly competent-person visits while in occupation, damage caused by its own machines, and everything it adds, such as extra distribution boards, sub-mains and a power upgrade, plus taking them out at the end if the agreement requires reinstatement (reinstatement works guide).

Before signing, ask for the switchboard rating, the last five-yearly test report, the inspection book and, where one exists, the installation's registration certificate. TNB also advises having the internal wiring inspected by a registered electrical contractor (myTNB).

Air-conditioning, drains, toilets and floor: who repairs what?

These items have little or no statute behind them, so the repair schedule does all the work. Where a law does apply, it decides whom the authority pursues, not who finally pays.

Item What the law says Balanced clause Check on site
Air-conditioning supplied by the landlord Nothing specific Tenant pays routine servicing at a stated frequency; landlord replaces a unit or compressor at end of life unless misuse caused the failure Age, service records, which units belong to the landlord (inventory list)
Toilets, urinals and sinks Maintained by the owner at the owner's expense; repairs needed because the occupier negligently or wilfully damaged them are recoverable from the occupier (Street, Drainage and Building Act 1974 s.58(13)) Same split, written into the agreement Working fittings, leaks, water pressure
Drains The council may require the owner to repair a drain not properly maintained and recover its costs from the owner (s.58(14)) Landlord for main and external drains; tenant keeps internal drains, sumps and traps clear and keeps process waste out Blocked or cracked drains, flood marks
Floor slab Nothing specific Landlord for structural cracks and settlement; tenant for surface wear from forklifts, its epoxy coating and anchor holes Cracks, uneven joints, previous patching
Roller shutters, dock levellers, gates Nothing specific Tenant services; landlord replaces at end of life Operation, motors, service stickers
Fire protection systems Bomba pursues the occupier or the owner depending on who caused the problem Agree who pays annual servicing and Bomba upgrades; see our Bomba requirements guide Service tags, fire certificate

Lifts, overhead cranes and air receivers need DOSH certificates of fitness, so name who renews each certificate and who pays for the repairs it calls for.

Who pays quit rent, assessment, insurance and management fees?

The owner is the person the law bills for quit rent, assessment and strata charges. An agreement may still pass assessment or management fees to the tenant; that is a commercial term, so read it as part of the rent.

Outgoing Who the law bills What happens if it is not paid
Quit rent (cukai tanah) The proprietor. Under a registered lease, the landlord (NLC s.230(2)) Falls due on 1 January and is in arrear from 1 June (s.94); the Land Administrator may serve a notice of demand on the proprietor (s.97), and if the sum is not paid in time the land is declared forfeit to the State (s.100)
Assessment (cukai taksiran, cukai pintu) The owner, half-yearly in advance in January and July (Local Government Act 1976 ss.133, 146) Unpaid at the end of February or August it becomes an arrear (s.147); the council may seize movable property found on the holding, whoever owns it (s.148)
Strata management charges and sinking fund The proprietor; the sinking fund contribution is at least 10% of the charges (Strata Management Act 2013 ss.52, 61) The Commissioner may issue a warrant to attach the defaulting proprietor's movable property (ss.35, 79)
Management fee of a non-strata managed park Whoever the park's deed or contract names As that contract says
Building insurance No statute; usually the landlord, with the tenant insuring its own machinery and stock See the insurance guide

How the law protects a tenant when the owner does not pay

  • Assessment. A tenant-occupier whose property is attached can have it released by paying the rent to the council as it falls due until the arrear is cleared, and may deduct those payments from the rent to the owner (Local Government Act 1976 s.151(5) and (6)). An occupier who pays the owner's rates may deduct the amount from the next rent payments, notwithstanding any agreement with the owner (s.155).
  • Strata charges. A tenant who pays the owner's unpaid sum to avoid attachment may, unless a written agreement says otherwise, deduct it from the rent and stay in possession until reimbursed (Strata Management Act 2013 s.35(5); s.79 has the same rule for a management corporation).
  • Quit rent. There is no equivalent set-off, and forfeiture ends the owner's title. Ask for the current year's paid quit rent and assessment receipts before signing and every year after.

Our guide to what it costs to rent a factory covers deposits, stamp duty and the TNB deposit; service tax on rent is a separate question with its own rules.

Landlord and tenant sort factory bills into two trays to agree who pays each outgoing
IllustrationLandlord and tenant sort factory bills into two trays to agree who pays each outgoing

What hidden costs does a factory tenant pay besides rent?

For a deal with five-figure monthly rent, these items can matter more to the real cost than a small difference in rent per square foot:

  1. Pass-through outgoings: assessment, management fee, sinking fund or building insurance premium recharged by the landlord. Ask for last year's bills.
  2. Statutory maintenance contracts: monthly competent-person electrical visits, five-yearly installation tests, two-yearly relay calibration, fire system servicing and lift or crane certificates.
  3. A full repairing clause: if the agreement makes the tenant repair "the premises" without exceptions, roof sheets, main switchgear and drains can become the tenant's bill.
  4. Wear items: roller shutter motors, dock levellers, air-conditioning compressors and lighting, unless the schedule says the landlord replaces them at end of life.
  5. Reinstatement at the end: removing partitions, cabling and mezzanines and making good the floor and walls.
  6. Defects nobody recorded: without a signed handover report, an old roof leak or floor crack can be treated as tenant damage when the deposit is refunded.

What should the tenancy agreement say about repairs and outgoings?

Use a repair schedule as an annex rather than one general sentence. Our tenancy agreement template guide shows the standard clauses; for a factory, add these:

Repair schedule

  • A table listing roof structure and sheets, gutters, external walls, structural slab, main and internal drains, main switchboard and cabling, high voltage equipment, air-conditioning, toilets, shutters, dock levellers, fire systems, lifts and cranes, with columns for "maintains", "replaces at end of life" and "pays service contract".
  • A definition of structural and non-structural work, and an express statement that the tenant need not return the factory in a better condition than at handover.

Process and timing

  • How defects are reported, and the response time for urgent items such as a roof leak over production or a tripped main breaker.
  • Whether the tenant may repair urgent items itself and recover the cost, and how.
  • Rent abatement if part of the factory cannot be used, and a right to end the tenancy if it stays unusable.

Outgoings

  • Which outgoings, if any, the tenant reimburses, with the amounts at signing, how increases are handled and a duty on the landlord to show paid receipts for quit rent, assessment and management charges.

Records

  • A signed handover report with dated photographs of roof, floor, walls, drains and M&E, plus copies of the electrical test report, inspection book, fire certificate and equipment certificates.

This guide explains the law and common lease terms; it is not legal advice. Have a lawyer check the agreement before you sign.

Frequently Asked Questions

Factory roof leaks: is the owner or the tenant responsible?

The tenancy agreement decides. If a registered lease of a whole factory says nothing, the tenant must keep the property in repair, roof included; the landlord carries the roof by default only when part of a building is let. A balanced clause puts aged or defective roof sheets on the landlord and blocked gutters or damage from the tenant's own roof works on the tenant.

Who repairs the electrical system in a rented factory?

TNB owns the meter, and the switchboards and wiring behind it must be kept in good working order by the owner, management or occupier under regulation 110 of the Electricity Regulations 1994. The agreement should name who maintains the installation, who pays the competent person's inspection visits and five-yearly tests, and who replaces aged switchgear. Anything the tenant adds, such as extra distribution boards, is normally the tenant's to maintain and remove.

Who pays the management fee, the landlord or the tenant?

In a strata-titled industrial park the Strata Management Act 2013 makes the proprietor, the landlord, liable for the charges and the sinking fund. A tenancy agreement may still pass the fee to the tenant as a commercial term, so check the clause and ask for the latest bill before signing. If the landlord defaults and the tenant pays to avoid attachment, the Act lets the tenant deduct that sum from the rent unless a written agreement says otherwise.

What hidden costs does a tenant pay when renting a factory?

Beyond rent and deposits, budget for any assessment, management fee or insurance premium the landlord recharges, statutory maintenance such as electrical inspection visits and fire system servicing, wear items such as shutters and air-conditioning, and reinstatement at the end. A full repairing clause can also move roof and main switchgear repairs to the tenant. Ask for last year's bills and service contracts before agreeing the rent.

Who bears the cost of repairing a rented factory, the owner or the tenant?

Whoever the agreement names. Without a clause, a registered lease of a whole building makes the tenant keep it in repair, while a lease of part of a building leaves the roof, main walls and main drains with the landlord. Damage caused by the tenant's negligence is the tenant's cost in either case.

What maintenance is required by the tenant?

Usually the routine upkeep listed in the agreement: keeping gutters and internal drains clear, servicing air-conditioning, shutters and dock levellers, arranging the inspections its equipment needs, and repairing damage its operations cause. The agreement should list these with frequencies so both sides can check them.

Can my landlord charge me for repairs after I move out?

Only for what the agreement allows, typically damage beyond fair wear and tear and the reinstatement works it requires. A repair covenant does not oblige you to hand back the factory in a better condition than it was in at the start, which is why a signed, photographed handover report matters.

Can I stop paying rent if the landlord does not fix the factory?

Not unless the agreement or the law gives you that right. For a registered lease without a contrary clause, rent or a fair part of it stops while the property is unfit through no fault of the tenant, and the tenant may end the lease after six months. For an ordinary tenancy, negotiate a repair-and-deduct or rent abatement clause before signing.