Key Takeaways

  • Plan on about four months of rent in cash before fit-out: the usual factory package is a 2-month security deposit, a 1-month utility deposit and 1 month's rent in advance, then stamp duty and the lawyer's fee on top.
  • Stamp duty on a 1 to 3 year tenancy is RM3 for every RM250 of annual rent (about 1.2% of one year's rent) under item 49(a) of the Stamp Act as amended by the Finance Act 2024. The tenant pays, and the agreement must be stamped within 30 days.
  • The lawyer's scale fee for a tenancy is 30% of one month's rent (minimum RM500) when rent is RM10,000 or less, and 15% to 25% of one month's rent above that, under the Solicitors' Remuneration Order 2023.
  • TNB asks for a deposit of two months of estimated electricity when the account moves into your name, plus RM10 stamp duty and a RM3 (low voltage) or RM80 (medium and high voltage) processing fee, and it wants to see your stamped tenancy agreement.
  • Worked example: at the JPPH-registered median rent for a semi-detached factory in Klang and Port Klang (RM15,000 a month), a 2-year tenancy needs about RM64,410 to RM65,910 upfront before the TNB deposit, fit-out and any 6% service tax.

How much does it cost to rent a factory in Malaysia? Expect the first payment to be roughly four months of rent: two months of security deposit, one month of utility deposit and the first month's rent. Add stamp duty on the tenancy agreement (RM3 per RM250 of annual rent for a 1 to 3 year term), your lawyer's fee under the SRO 2023 scale, the TNB deposit if the electricity account moves into your name, and 6% service tax on the rent if the landlord is SST-registered and your company is not exempt. Fit-out, licences and insurance come on top and depend on your operation.

This guide lists each item, who you pay, which parts come back to you, and a worked example at registered Klang rents. For the checks to make on the building itself, see our step-by-step guide to renting a factory. This is general information, not legal or tax advice.

What do you pay upfront when you rent a factory?

Item Typical amount Paid to Comes back?
Earnest deposit with the letter of offer Agreed in the offer, usually credited to the deposits Landlord Credited, but usually lost if you pull out
Security deposit Usually 2 months' rent Landlord Yes, at the end, less agreed deductions
Utility deposit Usually 1 month's rent Landlord Yes, once final bills are settled
First month's rent 1 month Landlord No
Service tax on rent 6% of rent, only if the landlord is SST-registered Landlord, for Customs No
Stamp duty RM1, RM3, RM5 or RM7 per RM250 of annual rent LHDN No
Legal fee SRO 2023 tenancy scale Your lawyer No
TNB deposit (own account) 2 months of estimated electricity TNB Yes, when you close the account
TNB change of tenancy RM10 stamp duty + RM3 or RM80 TNB No
Fit-out, licence, insurance Quotes for your operation Contractors, council, insurer No

Three of these items are deposits you should get back. The rest are costs.

How many months of deposit does a factory landlord ask for?

No Malaysian law fixes the number of months for a factory or warehouse. Even the Residential Tenancy Act, which is meant for homes, was still at the final drafting stage in February 2026 according to The Edge. For industrial space the figure is whatever the letter of offer and tenancy agreement say.

The usual package is a two-month security deposit, a one-month utility deposit and one month's rent in advance. Landlords often ask for more when:

  • the tenant is a newly registered or foreign company;
  • the landlord pays for fit-out such as three-phase power, offices or floor strengthening;
  • the process uses heavy machinery, a lot of power or water, or stores chemicals, batteries or other fire-risk goods;
  • the unit comes with equipment such as cranes, cold rooms or a substation.

The earnest deposit you pay with the letter of offer holds the unit. Check in writing that it is credited to the security deposit or first month's rent, and make the offer subject to your key checks (for example, that the council will license your activity), because an earnest deposit is usually forfeited if you walk away.

A refundable security deposit is not subject to service tax, according to the Customs Guide on Rental or Leasing Services (version 2, 14 May 2026). If the "deposit" is really a payment for the rental, it is taxed.

How much is stamp duty on a factory tenancy agreement?

Item 49(a) of the First Schedule to the Stamp Act 1949, as replaced by the Finance Act 2024, charges duty on the average rent for one whole year:

Tenancy term Duty for every RM250 of annual rent (or part of RM250)
Not exceeding 1 year RM1
Over 1 year, not exceeding 3 years RM3
Over 3 years, not exceeding 5 years RM5
Over 5 years RM7

The same Act added a minimum duty of RM10 per instrument (section 36CB). LHDN's stamp duty guideline names the tenant (lessee) as the person who pays the duty on the tenancy agreement and the landlord (lessor) as the payer for the duplicate copy, and notes that the self-assessment system applies from 1 January 2026. An unstamped agreement cannot be used as evidence in court.

Deadline and penalty. LHDN's STAMPS FAQ gives 30 days from signing to submit the agreement. Late stamping costs RM50 or 10% of the unpaid duty (whichever is higher) within three months after the deadline, and RM100 or 20% after that.

How to work it out: monthly rent x 12, divide by 250 and round up, then multiply by the rate for your term. A 2-year tenancy at RM15,000 a month: RM180,000 / 250 = 720 x RM3 = RM2,160. Our tenancy stamp duty calculator does this for any rent and term, and the tenancy stamp duty guide explains stamping on MyTax step by step.

Stamp the agreement early: TNB lists a valid, duly stamped tenancy agreement as proof of occupancy when a tenant opens an electricity account.

A tenant and a landlord signing a factory tenancy agreement beside a rubber stamp in a factory office
IllustrationA tenant and a landlord signing a factory tenancy agreement beside a rubber stamp in a factory office

How much is the lawyer's fee for a factory tenancy agreement?

The Solicitors' Remuneration Order 2023 (P.U.(A) 207/2023, in force 15 July 2023) sets the scale in its Second Schedule:

Monthly rent Tenancy scale fee Lease scale fee
RM10,000 or less 30% of the monthly rent, minimum RM500 60% of the monthly rent, minimum RM1,000
Above RM10,000 15% to 25% of the monthly rent 30% to 50% of the monthly rent

Rules under the same Schedule that matter for factories:

  • A solicitor acts for only one side, landlord or tenant. If both sides appoint lawyers, each lawyer charges.
  • Service charges and rent for fixtures count as rent when the fee is worked out.
  • Where rent steps up, the fee is based on the highest rent that can be worked out when you sign.
  • The 50% discount for renewals on the same terms applies only when the lawyer acts for the landlord, not the tenant.

Who bears the legal fee is a commercial point: settle it in the letter of offer, and ask the firm for a written quote that separates the scale fee from disbursements.

What does TNB charge when a tenant takes over a factory?

You can keep the electricity account in the landlord's name (then the utility deposit you pay the landlord covers the bills), or open your own account through TNB's change of tenancy process. TNB lists these payments:

  • Deposit: two months of electricity, depending on the type of premises.
  • RM10 stamp duty on the supply contract.
  • Processing fee: RM3 for low voltage or RM80 for medium and high voltage.

According to TNB's security deposit page, the Electricity Supply Act allows TNB to collect two months of your estimated usage, worked out from the average of six months. Deposits earn interest of 2.5% a year, credited to the account; a bank guarantee is an option when the deposit is above RM2,000; TNB refunds any excess on request and asks for a top-up if your two-month average rises; and the deposit is returned when you close the account, less any amount owing. As an example only, if you expect a bill of about RM8,000 a month, the deposit would be about RM16,000. Estimate your load first with the factory power calculator, because a bigger load means a bigger bill and deposit.

For a company, TNB asks for the application form, the authorised person's ID, a letter of authorisation, the company registration documents and proof of occupancy. For commercial or industrial premises it also asks for a development order, permit, licence or other approval from the local authority, according to its get electricity page. An application for a new supply with a load above 100A must be made through an electrical consultant engineer registered with the Board of Engineers.

If the landlord recharges you for electricity billed in the landlord's name, Customs treats that recharge as part of the taxable rental. Bills you pay straight to the utility, either in your own name or on the landlord's account without any recharge, are not subject to service tax.

Is service tax charged on factory rent?

Rental of commercial and industrial property became taxable on 1 July 2025. The Customs rental guide sets the rate at 8% from 1 July to 31 December 2025 and 6% from 1 January 2026. Points that change your cash plan:

  • Only landlords whose taxable rental exceeds RM1 million in 12 months must register and charge it.
  • A tenant that is a micro, small or medium enterprise with annual sales of RM1.5 million or less can be exempted by registering in the Customs MyPMK system.
  • From 1 January 2026, a newly set up SME is exempt for one year from its SSM registration date, also through MyPMK.
  • Refundable deposits are not taxed.
A business owner checking rental invoices with a calculator in a warehouse mezzanine office
IllustrationA business owner checking rental invoices with a calculator in a warehouse mezzanine office

Worked example: how much cash to prepare at registered Klang rents

The rents below are JPPH-registered median rents for factory tenancies in Klang and Port Klang (24 months to August 2026, typical term 24 months), from our Klang and Port Klang transactions page. Each column assumes the usual 2 + 1 + 1 package, a 2-year term and one lawyer at the SRO tenancy scale.

Item Terrace factory, about 2,450 sq ft Semi-detached factory, about 8,630 sq ft Detached factory, about 15,090 sq ft
Monthly rent (registered median) RM3,500 RM15,000 RM19,700
Security deposit (2 months) RM7,000 RM30,000 RM39,400
Utility deposit (1 month) RM3,500 RM15,000 RM19,700
First month's rent RM3,500 RM15,000 RM19,700
Stamp duty (2-year term) RM504 RM2,160 RM2,838
Legal fee (SRO 2023 tenancy scale) RM1,050 RM2,250 to RM3,750 RM2,955 to RM4,925
Upfront before TNB and fit-out RM15,554 RM64,410 to RM65,910 RM84,593 to RM86,563
Add 6% service tax on first month, if charged RM210 RM900 RM1,182

Then add two months of estimated electricity if the TNB account moves into your name, the RM10 stamp duty and processing fee, and your fit-out. Of the upfront sums above, the deposits (three months of rent) should come back to you at the end of the tenancy; the rent, stamp duty and legal fee do not.

What else should you budget for before moving in?

  • Fit-out and reinstatement. Offices, lighting, racking, compressed air, power distribution and any changes to fire protection. Get quotes, agree in writing what you must remove at the end, and ask whether the landlord will give a rent-free period for fit-out.
  • Business premise licence and signboard licence from the local council for your activity. See our premise licence guide.
  • Insurance for your stock, machinery and public liability, as the tenancy requires.
  • Running costs from month two: rent plus any service tax, electricity, water, and whatever the agreement passes to the tenant.

Common mistakes that cost factory tenants money

  • Paying the deposits before confirming the council will license your activity at that address.
  • Leaving the agreement unstamped. It cannot be used in court, TNB will not accept it as proof of occupancy, and penalties grow after 30 days.
  • Forgetting the MyPMK exemption when your company qualifies, and paying 6% service tax on rent you did not need to pay.
  • A vague reinstatement clause that later eats into the security deposit.
  • No joint inspection at handover. Dated photos and meter readings on the first day decide how much deposit you get back.

Frequently Asked Questions

How much does it cost to rent a factory in Malaysia?

Upfront, plan on about four months of rent: two months of security deposit, one month of utility deposit and the first month's rent, plus stamp duty and the lawyer's fee. At the JPPH-registered median rent of RM15,000 for a semi-detached factory in Klang and Port Klang, that comes to about RM64,410 to RM65,910 on a 2-year tenancy, before the TNB deposit, fit-out and any 6% service tax.

How much deposit is needed to rent a factory?

No law fixes it, so it is whatever the letter of offer says. The usual package is a two-month security deposit and a one-month utility deposit, with one month's rent paid in advance. Landlords often ask for more from new or foreign companies, heavy power users, or when they pay for fit-out.

How do I calculate the LHDN stamp duty for a tenancy agreement?

Multiply the monthly rent by 12, divide by 250 and round up, then multiply by RM1 (up to 1 year), RM3 (over 1 to 3 years), RM5 (over 3 to 5 years) or RM7 (over 5 years). The minimum is RM10 per agreement. Submit it within 30 days of signing to avoid a penalty.

LHDN's guideline names the tenant as the payer of duty on the agreement and the landlord as the payer for the duplicate, unless the parties agree otherwise. The legal fee is paid by whoever appoints the lawyer, and under the SRO 2023 a lawyer may act for only one side. Settle both points in the letter of offer.

How can I get my rental deposit back?

Record the factory's condition with dated photos and meter readings at handover, and keep to the repair and reinstatement terms. At the end, do a joint inspection, settle the final utility bills and hand back the keys in writing. Deductions should be limited to what the agreement allows, such as unpaid rent, damage beyond fair wear and tear and agreed reinstatement.

What is the average factory rent in Selangor?

JPPH-registered factory tenancies in Selangor and Kuala Lumpur show a median rent of RM1.54 psf a month (24 months to August 2026), and RM1.43 psf a month in Klang and Port Klang. Registered rents for each area are on our transactions pages.

Is service tax charged on factory rent?

Yes, at 6% from 1 January 2026, but only when the landlord is registered because its taxable rental exceeds RM1 million a year. SME tenants with annual sales up to RM1.5 million, and new SMEs in their first year, can claim exemption through the Customs MyPMK system.

FactoryHub is dedicated to helping every client find the right factory or warehouse. To plan the cash for a specific unit, call Peter Tan (REN 12771) on 016-666 6872 or Jason Low (PEA 1478) on 012-288 1834.