  • Yes, a factory can usually take a mezzanine, but only with the council's written approval first. Section 79 of the Street, Drainage and Building Act 1974 covers any gallery, loft or other structure built inside a building, and the council may remove an unapproved one and bill the owner.
  • A mezzanine adds floor area, so it is development as well as building work. The Town and Country Planning Act 1976 counts any increase in floor area as a building operation, which takes it outside the exemption for interior works. Councils such as MBSJ take the planning application and the building plans together, with Bomba's approval of the plans.
  • Height decides first. The Selangor by-laws define a mezzanine floor as any floor between the main floors, including any platform or landing wider than 2.5 m, and require at least 3 m headroom in any factory room where people work.
  • Fire escape and the fire certificate change. People may leave a mezzanine by an open staircase only within the Seventh Schedule travel distances (30 m, or 60 m with sprinklers, for a general factory), and the occupier of designated premises must notify Bomba before a material change.
  • Tenants need the owner on board. Plans must be signed by the owner, the Act presumes the owner built any unapproved structure, and a tenancy that requires reinstatement can oblige the tenant to remove the deck, with approvals, when the lease ends.

Can a factory add a mezzanine floor?

Usually yes. Mezzanines are a common way to add offices, storage, packing space or staff rooms inside a factory or warehouse without buying more land. Whether your unit can take one, and how large, comes down to five things you can check before paying for a design.

What decides it Why it matters What to check
Clear height The by-laws require at least 3 m headroom where people work Height from the floor to the lowest beam, truss, duct, light or sprinkler pipe
Floor slab and frame The deck's columns put point loads on the slab Approved structural plans and the loads marked on them
Spare floor area and parking A mezzanine adds gross floor area, office space and parking demand Approved floor area, the local plan's plot ratio, yard space
Escape routes and fire systems A new level needs its own way out Distance to exits, staircases, sprinklers, fire certificate
Owner, landlord and bank The owner signs the plans and carries the legal risk Title, bank charge, tenancy agreement, insurance

What counts as a mezzanine under Malaysian rules?

The Selangor Uniform Building By-Laws 1986 define a "mezzanine floor" as any floor interposed between the main floors of a building, and the definition includes any platform or landing of greater than 2.5 metres width. A steel deck bolted to the floor, or a platform sold as removable, is still a structure in the eyes of the law. Multi-tier racking with walkways sits in a grey area: give the drawings to your principal submitting person (PSP) and let them confirm with the council how it will be treated.

The core rule is section 79 of the Street, Drainage and Building Act 1974 (Act 133): no person shall erect, or cause or permit to be erected, in any building any partition, compartment, gallery, loft, roof, ceiling or other structure without the prior written permission of the local authority. The owner is presumed to have done it until proved otherwise, and the council may enter, remove the structure and recover the costs of demolition, removal and storage from the owner, even where the person in default can be traced but cannot pay.

Which approvals does a factory mezzanine need in Selangor?

A mezzanine normally needs building plan approval, planning permission and Bomba's approval of the plans. A PSP submits them through the council's One Stop Centre on the OSC 3.0 Plus system. KPKT lists architects, professional engineers and registered building draughtsmen as PSPs.

Building plan approval (Act 133)

Section 70(16) of Act 133 treats anyone who adds to or alters an existing building in a way that involves new foundations, or a new, partly new or increased superstructure, as erecting a building. A mezzanine with its own columns and footings fits that description, so it follows the building plan route: plans and structural calculations prepared and certified by the PSP and signed by the owner or the owner's authorised agent (s.70(19)). If the council does not approve, refuse or ask for changes within three calendar months of submission, the PSP may apply to the State Authority (s.70(18)).

Planning permission (Act 172)

The Town and Country Planning Act 1976 defines a building operation to include "any increasing of the height or floor area of a building". Section 19(2)(a) exempts interior works from planning permission only when they do not, among other things, increase the height or floor area. A mezzanine increases floor area, so by the Act it falls outside that exemption. Subang Jaya City Council's checklist for additions and alterations, in force from 1 April 2026, has an industrial category and lets planning permission for additions and alterations be submitted together with the building plans. It also has a plans-only route for some additions, so your PSP confirms with the council which route your deck takes. Before granting planning permission, the council also decides whether a development charge is payable (s.33).

Bomba approval of the plans

For buildings other than houses, the MBSJ checklist asks for the building plan approval letter and plans certified by the Fire and Rescue Department, and Selayang Municipal Council's form for additions, updated on 1 April 2026, lists a Bomba approval letter among the external technical documents.

Approval Law Who submits What it looks at
Building plan for additions and alterations Act 133 s.70 and s.79, Selangor by-laws PSP, signed by the owner Structure, headroom, escape, fire resistance
Planning permission for additions and alterations Act 172 s.19 PSP or town planner Floor area, plot ratio, use, parking
Bomba plan approval By-laws Part VII PSP with a fire consultant Means of escape, fire systems
Notice to Bomba Fire Services Act 1988 s.32(2) The occupier Material change to premises holding a fire certificate

Documents the council asks for

MBSJ's checklist for additions and alterations includes:

  • a certified copy of the title, and the latest quit rent and assessment tax receipts;
  • a copy of the existing building's CCC (Form F) or older CFO;
  • a copy of the tenancy agreement, if a tenant applies;
  • a statutory declaration signed by the owner;
  • plans signed by the owner and the consultants, with a table comparing the old and new floor area;
  • structural plans and Form A from the civil and structural engineer;
  • sanitary plans where relevant, and SSM documents when the owner is a company;
  • the Bomba approval letter and certified plans, for buildings other than houses.

How much are the council fees?

The plan fees come from the First Schedule of the Selangor by-laws. New floor area is charged per 9 m² or part of it: RM14 for a ground floor (minimum RM140) and RM12 for a first floor (minimum RM120), with lower rates higher up. Plans for alterations to existing buildings pay half of those rates. An amendment to an approved plan costs RM120 plus the normal rate on any extra area. Where work began before approval, the council may charge ten times the fee, and paying it does not stop the council from prosecuting. Your PSP works out which lines apply to your deck. Consultants' fees, the fire consultant's fee and any development charge are separate and vary by job, so ask for written quotes before you commit.

How much ceiling height do you need for a mezzanine?

Enough for 3 m of headroom on every level where people work, measured to the lowest thing overhead.

By-law 44(6) says the height of any room in a factory in which any person works shall be not less than 3 metres headroom, and the by-laws define headroom as the clear vertical distance between the finished floor and the soffit of the lowest projecting member or surface above it. If staff work both under the deck and on it, the sum is 3 m under the deck's lowest beam, plus the depth of the deck structure, plus 3 m above the deck to the lowest roof truss, light, duct or sprinkler pipe. By-law 46(4) separately sets 2 m as the minimum headroom of any habitable room or space in any building.

On site:

  • Measure to the underside of the roof trusses along the whole deck, not to the roof apex. Low eaves on a pitched roof limit where the deck can go.
  • Plan forklift and racking clearance under the deck at the same time, because both compete for the same height.
  • Ask the PSP how the council applies by-law 44(6) to a storage deck that staff visit only to pick goods.

Clear height and ceiling height are not the same figure; a separate FactoryHub guide on factory clear height explains the difference.

A worker measures the clear height under and above a steel mezzanine deck in a factory
IllustrationA worker measures the clear height under and above a steel mezzanine deck in a factory

Can the existing floor and structure carry a mezzanine?

Only an engineer's check on the actual slab and frame can say. By-law 55 applies the dead and imposed load rules to structural alterations and additions to existing buildings, and by-law 16(3) requires every structural plan to be marked with the imposed loads each floor was designed for.

Two loads matter: the deck itself, designed for its real use (office, storage or light assembly), and the slab under it, which takes each column's share as a point load. Our guide to factory floor loading explains kN/m², the design values for offices and storage and how to read the drawings.

One fire rule catches owners out. In a single-storey building the by-laws relax fire resistance for much of the frame, but by-law 216(1)(a) still requires any column that supports a gallery to have the fire resistance required for that gallery, and the by-laws list a gallery among the elements of structure. Steel decks may therefore need fire protection. Ask the PSP early, because it changes the price.

Does a mezzanine count in floor area and plot ratio?

Yes. Act 172 defines floor area as the total area of floor space within a building, and plot ratio as the ratio of total floor area to the plot. The Selangor planning manual counts all floor area towards plot ratio, including utility rooms, ventilation spaces, staircases, corridors and terraces, and excludes only multi-storey and basement car parks. A mezzanine is not on the excluded list.

For a single-storey factory, plot ratio itself is rarely the limit (see what plot ratio means for industrial land). The floor area a mezzanine adds matters more through two other standards the manual sets for detached and semi-detached factories:

  • Office share: up to 30% of the gross floor area is treated as office space. An office deck that pushes the office share higher is a question for the planner before you design it.
  • Parking: one car bay per 500 sq ft of office floor, per 1,000 sq ft of production floor and per 2,500 sq ft of storage, each plus 10% for visitors.

Worked arithmetic, not a real unit: a 3,000 sq ft deck used as offices works out to 6 car bays plus 10% for visitors under the manual's office ratio, while the same deck used only for storage works out to 1.2 bays plus 10%. The council applies its local plan, so use this only to see the effect, then check whether the yard can take the extra bays without blocking the loading bay or fire engine access.

A factory front yard with car parking bays beside the loading area and a mezzanine office inside
IllustrationA factory front yard with car parking bays beside the loading area and a mezzanine office inside

What happens to the CCC and the fire certificate?

The CCC

Because Act 133 treats the works as erecting a building, a mezzanine built under approved plans ends with a Certificate of Completion and Compliance. Only the PSP can issue it, after supervising the works and making sure they follow the approved plans (s.70(20) and (21)). KPKT's FAQ explains that a CCC is supported by 21 Form G, eight of which need a letter from a technical agency, including two from Bomba (G8 and G9). The original building's CCC does not cover a deck added later, and occupying a building or any part of it without a CCC is an offence carrying a fine of up to RM250,000 or jail of up to ten years or both (s.70(27)(f)). For a deck that was built without approval, see what to do about an unapproved factory extension.

Escape routes from the deck

By-law 170 lets people leave a mezzanine floor by an open staircase to the floor below and then to a storey exit only if:

  1. a fire anywhere in the compartment will be obvious to the people on every level;
  2. the travel distances in the Seventh Schedule are not exceeded;
  3. only 50% of the occupants of a floor are assumed to use the open staircase, with storey exits on each level for the other 50%;
  4. the storey exits on the main floor are designed for its own occupants plus 50% of those coming down from the levels above.
Use (Seventh Schedule) Dead-end limit Travel distance without sprinklers With sprinklers
Factory, general and special purpose 15 m 30 m 60 m
Factory, high hazard 0 m 22 m 35 m
Storage, low and ordinary hazard 15 m 30 m 60 m
Storage, high hazard 10 m 20 m 35 m
Office 15 m 45 m 75 m

The same schedule counts factory and office floors at 10 m² gross per person when sizing exits, so a 300 m² office deck is counted as 30 people.

The fire certificate

If the factory is designated premises holding a fire certificate, section 32(2) of the Fire Services Act 1988 requires the occupier to give Bomba notice of the proposals before work begins, and starting without that notice is an offence. Bomba may then tell the occupier what steps will keep the fire safety facilities adequate, and once they are taken it amends the certificate or issues a new one on payment of the fee (s.32(3)).

Safe access for staff

Under section 15(2)(d) of the Occupational Safety and Health Act 1994, an employer must, so far as is practicable, keep a place of work under its control safe and provide safe means of access and egress. On a mezzanine that means proper stairs, edge protection and a safe way to lift goods onto the deck.

How does a mezzanine affect fire insurance and the bank loan?

Fire insurance

Under Condition 9(a) of a standard Malaysian fire policy wording, the insurance ceases to attach to the property affected if the circumstances affecting the building are changed in a way that increases the risk of fire, unless the insurer endorses the change before a loss. The usual alterations and repairs clause allows workmen to carry out alterations only if the trade, occupation and construction of the building remain unchanged, and a new floor changes the construction. Tell the insurer in writing and get the endorsement.

Raise the sum insured too. Under the average condition (Condition 20 in the same wording), if the property is worth more than the sum insured, the insured is treated as its own insurer for the difference and bears a rateable share of the loss. For landlords, the tenants clause in that wording keeps the owner's cover when a tenant increases the risk without the owner's knowledge, provided the owner tells the insurer as soon as it finds out and pays any extra premium.

Bank loan and valuation

The valuation standard for registered valuers says that where the valuer is aware of any breach of statutory requirements, it should be disclosed in the report (Board of Valuers circular on inspections). An approved mezzanine with its CCC is simply part of the building; an unapproved one is a breach that can surface at refinancing or sale. If the factory is charged to a bank, read the facility agreement and the charge for any clause on alterations and get the bank's consent in writing where it is required.

Can a tenant add a mezzanine or make structural changes to a rented factory?

Only with the owner's written consent, on terms written into the tenancy agreement, and after the approvals above. The law puts the owner at the centre:

  • The owner signs. Plans under section 70 must be signed by the owner or the owner's authorised agent together with the PSP (s.70(19)). MBSJ accepts a tenant's application only with a copy of the tenancy agreement.
  • The owner is presumed to have built it. Under s.79(2) the owner is presumed to have carried out an unapproved structure until proved otherwise, and under s.79(3) the owner pays the council's removal costs when the person in default is unknown, untraceable or unable to pay.
  • Letting an unauthorised building is an offence. Section 73(3) of Act 133 sets a fine of up to RM1,000 for letting one.
  • The tenant has its own duty to Bomba. The notice in s.32(2) of the Fire Services Act is the occupier's duty.
  • Even the design needs the owner. Copying an approved plan at the council requires the building owner's written consent (First Schedule, paragraph 11(2) of the Selangor by-laws).

What to agree in writing before work starts

  1. The drawings, size and use of the deck (office, storage or production).
  2. Who appoints and pays the PSP, engineer and contractor, and who pays the council and Bomba fees.
  3. Who owns the deck when the tenancy ends: does the tenant remove it and restore the unit, or leave it for the owner?
  4. Whose insurance covers the deck, with written notice to both insurers.
  5. The bank's consent, if the factory is charged.
  6. How long the works may take, and what happens to the tenancy if the council refuses the plans.

Reinstatement: what the court expected

In Hong Poh Teck & 3 Ors v Effort Ezy Sdn Bhd [2018] 2 AMR 833 (High Court, Kuala Lumpur, 4 October 2017), the owners of two adjoining premises in Melaka let the tenant remove the wall between them on condition that it would reinstate the premises, obtain the structural approvals and return vacant possession at its own cost. When the tenancies ended, the tenant handed back the keys without reinstating. The court held that returning the keys did not amount to vacant possession under the agreements and that the deposit held for the wall was no defence, allowed double rent under section 28(4) of the Civil Law Act 1956, and said the restoration works had to be backed by the approval of the relevant authorities as the agreements required (judgment). A tenant who adds a mezzanine on similar terms should budget for removing it with approvals. Our guide to reinstatement works covers deposits and what "original condition" means.

A landlord, tenant and engineer review blank building plans for a new mezzanine in a factory
IllustrationA landlord, tenant and engineer review blank building plans for a new mezzanine in a factory

Step by step: adding a mezzanine to a factory

  1. Define the need. Deck area, use, loads and the number of people who will work on it.
  2. Collect the documents. Title, approved building plans, structural plans, CCC or CF, and the fire certificate if there is one. A tenant gets the owner's written consent first.
  3. Check height and structure. Measure the clear height and have a professional engineer check the slab and frame.
  4. Test the planning limits. The PSP checks floor area, plot ratio, office share, parking and escape routes against the local plan and the by-laws.
  5. Submit. Planning permission, building plans and Bomba plans go in through OSC 3.0 Plus.
  6. Notify. Give Bomba notice if the premises hold a fire certificate, and tell the insurer and, if the factory is charged, the bank.
  7. Build after approval. Work starts only after approval, under the PSP's supervision.
  8. Close out. Collect the CCC and Form G letters, then update the fire certificate, the insurance and your asset records.

Common mistakes

  • Buying a "removable" steel platform and assuming it needs no approval.
  • Measuring height to the roof apex instead of to the lowest truss, light or sprinkler pipe.
  • Putting an office on the deck without checking the office share and parking.
  • Starting before approval: the plan fee can be ten times the normal fee, and the council may still prosecute.
  • A tenant building without the owner's signature, leaving the owner exposed under section 79.
  • Forgetting the insurer, so that a claim meets Condition 9(a).
  • Buying a factory whose mezzanine is not on the approved plans. When you look at factories with a mezzanine floor, ask to see the approved plans and CCC that cover the deck before you commit.

Frequently Asked Questions

Do you need permission to build a mezzanine in a factory in Malaysia?

Yes. Section 79 of the Street, Drainage and Building Act 1974 requires the local council's prior written permission for any gallery, loft or other structure inside a building. Because a mezzanine adds floor area, planning permission under the Town and Country Planning Act 1976 is normally needed as well, and councils such as MBSJ ask for Bomba's approval of the plans for buildings other than houses.

Can a tenant make structural changes to a rented factory?

Only with the owner's written consent and the approvals. Building plans must be signed by the owner, and the owner is presumed responsible for any unapproved structure, so structural works are in practice the owner's decision. Agree in writing who pays, who owns the work at the end of the tenancy and whether it must be removed.

What is the minimum height for a mezzanine floor in a factory?

The Selangor by-laws require at least 3 m headroom in any factory room where people work, measured to the lowest projecting member above. If people work both under and on the deck, you need 3 m on each level plus the depth of the deck structure. Measure to the lowest truss, light or sprinkler pipe, not to the roof apex.

Does a mezzanine floor count as floor area?

Yes. Act 172 treats any increase in floor area as a building operation, and the Selangor planning manual counts all floor area towards plot ratio except car parks. The added area also counts towards the office share and the parking standards for the factory.

Is a steel platform or racking walkway a mezzanine?

The by-laws define a mezzanine floor to include any platform or landing wider than 2.5 metres, and section 79 covers any other structure built inside a building, so a bolted steel deck needs approval. For multi-tier racking with walkways, ask your PSP to confirm the council's view before you buy.

What is the difference between a loft and a mezzanine?

In everyday use a loft is a space tucked under the roof and a mezzanine is an intermediate floor open to the floor below. For approval the difference does not help: section 79 names both galleries and lofts, and both need the council's written permission.

Do I need a new CCC after adding a mezzanine?

Yes, for the new works. The original building's CCC covers only what was built under its approved plans, and Act 133 treats a new superstructure as erecting a building. The PSP who supervises the mezzanine issues the CCC for it, supported by Form G letters that include Bomba's.

How long does mezzanine approval take?

Act 133 expects the council to approve, refuse or ask for changes within three calendar months of a building plan submission, failing which the PSP may apply to the State Authority. Planning permission and Bomba's review run alongside, and processing times differ between councils, so ask the council's One Stop Centre for its current timeline.