Key Takeaways

  • Yes, a tenant can put solar on a rented factory, if the TNB account is in the tenant's own name (not a landlord's sub-meter) and the landlord agrees in writing. PLANMalaysia's solar guideline says the building owner's permission is needed for panels on a private building.
  • Solar ATAP is the rooftop programme open now. Since 1 January 2026 a factory can install up to 100% of its average maximum demand, capped at 1,000 kW, on a contract of up to 10 years. Exports earn only the Average SMP (RM0.2515/kWh for September 2026) and only against the same month's bill.
  • Solar pays best when the factory uses the power in daylight. On a low voltage tariff each kWh you use yourself saves 50.68 sen plus AFA; on medium voltage it saves 29.83 sen plus AFA, and the RM/kW demand charges stay.
  • The roof decides more than the price. An engineer must certify the mounting structure, Bomba's guideline asks for clear walkways of 1.2 m or 1.8 m along the roof edges, and old sheets should be replaced before panels go up, not during a 10-year contract.
  • Panels fixed to a roof can count as part of the land unless the tenancy says otherwise, the Solar ATAP contract does not pass to a buyer on its own, and no registered data shows that solar raises a factory's price. Budget 2027 also proposes new GITA tax rules for solar from 1 January 2027.

This guide is for owners and tenants of detached, semi-detached and large warehouse units who are weighing rooftop solar. It covers what the rules say, what to check on the roof, who owns the panels and what happens when the lease ends or the building is sold. It is general information on law and tax, not legal or tax advice: have your lawyer, engineer and tax agent check your own case. The scheme mechanics, sizing and approval steps are explained in our earlier rooftop solar guide for factories; this guide answers the questions that guide leaves open.

Which solar programmes can a factory use in November 2026?

Direct answer: for a roof you occupy, Solar ATAP (with export credit) or SELCO (no export). If you cannot use the roof, TNB's Green Electricity Tariff lets you buy green power through your bill, and CRESS lets large users buy from a renewable developer over the grid.

Programme What it gives you Main rule Source
Solar ATAP Rooftop solar for your own use, surplus exported for a bill credit TNB account holder (owner or occupier), not a multi-tenant sub-meter; up to 100% of maximum demand, 1,000 kW cap; up to 10 years Energy Commission guidelines
SELCO (self-consumption) Rooftop solar with nothing exported No capacity limit for non-domestic users; above 72 kWp a connection study and an Energy Commission licence TNB SELCO page
Green Electricity Tariff (GET) Green electricity and renewable energy certificates (mRECs) without panels Blocks of 1,000 kWh; premium of 5, 4 or 3 sen/kWh for a 1, 2 or 3 year subscription; subscribed units exempt from AFA TNB GET page
GET Greenpath Green electricity for tenants not registered directly with TNB Open since 1 August 2025; the TNB customer declares the tenant account; extra 0.2 sen/kWh TNB GET page
CRESS Green electricity bought from a renewable developer through the grid Guidelines effective 20 September 2024, built on third-party access Energy Commission

NEM 3.0 closed at the end of June 2025, as SEDA's Solar ATAP page notes. A factory already on NEM or SELCO must end that contract before it can join Solar ATAP. The guidelines set no fixed quota: total capacity is whatever the Government determines, first come, first served.

Tax incentives: what changes on 1 January 2027

The Budget 2027 speech, tabled on 9 October 2026, extends the green technology tax incentives to 31 December 2030 but changes what solar qualifies for (Appendix 25):

Until 31 December 2026 Proposed, 2027 to 2030
GITA Assets (own consumption) Tier 2 "Renewable Energy System": 60% allowance, set off against 70% of statutory income, for purchases verified by MGTC Solar listed only in Tier 1 as a "Renewable Energy Integrated System" with battery (BESS) or energy storage: 100% allowance against 70% of statutory income. The Tier 2 list no longer names solar
GITA Project (business purposes) Solar in Tier 3: 100% allowance against 70% Solar no longer listed
Deadline Apply to MGTC within 24 months of buying the asset

The Star reported the same change: solar projects for business purposes drop out while self-consumption stays eligible. A budget proposal only takes effect once legislated, so confirm with MGTC and your tax agent before you sign a purchase order that depends on it.

Can a tenant install solar on a rented factory?

Direct answer: yes, when three conditions are met. Miss any one and either the application fails or the money is at risk.

The three conditions

  1. Your own TNB account. The guidelines exclude multi-tenant consumers, defined as several consumers in one premise with separate supply to the landlord and the tenants. SEDA's FAQ spells it out: TNB accounts registered under tenant sub-meters in a multi-tenant scheme cannot apply. A single-tenant detached or semi-detached factory with its own TNB account is the normal case that qualifies.
  2. Written landlord consent. PLANMalaysia's solar planning guideline requires the building owner's permission for panels on a private building. The Solar ATAP application form asks whether the site is fully owned, charged to a bank or leased, and the competent person signs that they represent the owner of the premises. Attach the engineer's report and layout to the consent so the landlord approves a specific design.
  3. Enough time left on the tenancy. The Solar ATAP period runs up to 10 years from the commencement date, and after approval the system must start operating within 18 months or the approval lapses. A 3 year tenancy with no renewal option rarely lines up with a 10 year contract or a long PPA.

If the landlord refuses or you are on a sub-meter

You can still buy green electricity. GET Greenpath lets the TNB customer, usually the landlord, declare your tenant account so the mRECs are issued in your name. Be careful with offers from a landlord to "sell you the solar power": section 9 of the Electricity Supply Act 1990 bars anyone other than a supply authority from supplying electricity to another person except under a licence or an exemption. Under Solar ATAP, third-party PPAs and solar leases go through SEDA-registered solar PV investors (RPVI). Ask the Energy Commission or your lawyer before you agree to pay a landlord per kWh.

Is my factory roof suitable for solar?

Direct answer: only an engineer's check can say yes. What decides it is the strength of the purlins and rafters, the age and type of the roof sheets, the roof covering's fire rating, the area left after Bomba's walkways, and the TNB supply.

What the rules require

Item Rule Source
Mounting structure Certified by a competent person under the Registration of Engineers Act 1967 or the Architects Act 1967; endorsed civil and structural drawing in the application Solar ATAP guidelines and application checklist
Structural safety Roof must carry the panel load, checked by a structural engineer; wind strength and direction considered; waterproofing laid during installation PLANMalaysia guideline, section 7.4
Council approval Rooftop panels generally need no planning permission, only a building permit under the council's conditions PLANMalaysia guideline, section 7.4
Roof covering Tested to BS 476 Part 3 under by-law 208 of the Uniform Building By-Laws (2021 amendment); a non-combustible layer between covering and insulation Bomba rooftop PV fire safety guideline
Isolation AC isolator at the fire control centre or an accessible point; DC emergency shutdown able to bring the system below 80 V, automatic and remotely controlled Bomba guideline, sections 8.3 and 8.4
Walkways Clear perimeter path of 1.2 m for a building up to 76.2 m long or wide, 1.8 m above that; 1.2 m paths to roof hatches, skylights and smoke vents; no array larger than 46 m by 46 m Bomba guideline, section 8.10

The walkways matter for sizing. On a long warehouse roof, a 1.8 m perimeter band plus paths between arrays can take a noticeable share of the gross area, so ask for a layout drawing with the panel count, not a figure worked from total roof area.

Roof age: the 10 year question

The Solar ATAP contract can run 10 years. If the sheets, fasteners or gutters will need replacing during that time, the array has to be lifted off and refitted, at a cost someone must carry. Before you sign, ask the landlord or roofing supplier for the roof's installation date, warranty and leak history, and have the engineer note any rust, loose fixings or patched areas. If replacement is close, replace first. Malaysian tenancy agreements commonly put the structure, including the roof, on the landlord, as this landlord and tenant briefing hosted by PKNS notes, so settle in writing who pays to remove and refit panels when the landlord repairs the roof.

The electrical side

The size limit comes from your maximum demand, and TNB's technical study can set a lower figure. No study is needed up to 72 kW; above that the fee is RM1,000 (above 72 to 180 kW), RM5,000 (above 180 to 425 kW) and RM8,000 (above 425 kW to 1 MW), with RM15,000 for a high voltage power system study; the application fee is RM7.50 per kW, non-refundable.

Engineer checking roof purlins and mounting rails on a factory roof before solar panels go up
IllustrationEngineer checking roof purlins and mounting rails on a factory roof before solar panels go up

Is factory solar worth it?

Direct answer: it is worth it when most of the output is used on site during the day and you will occupy the factory for most of the contract. The reason is the gap between what a kWh saves and what an exported kWh earns.

What one kWh of solar is worth

Where the kWh goes Value Source
Used on site, Non-Domestic Low Voltage General Energy 27.03 + capacity 8.83 + network 14.82 = 50.68 sen, plus AFA TNB tariff from 1 July 2025
Used on site, Medium Voltage General 29.83 sen energy, plus AFA. Capacity (RM29.43/kW) and network (RM59.84/kW) are charged on maximum demand TNB tariff
Used on site, Medium Voltage ToU 31.32 sen peak, 27.23 sen off-peak, plus AFA. Peak is 2pm to 10pm on weekdays; weekends are off-peak TNB tariff
Exported Average SMP (7am to 7pm): RM0.2515/kWh for September 2026, RM0.1911 for January 2026 after revision Single Buyer

Exports offset only energy imported in the same billing period, capped at capacity (kWac) x 5 sun hours x the billing period; anything left is forfeited, a negative bill is set to zero and the credit cannot reduce AFA. Maximum demand is twice the highest kWh used in any 30 minutes of the month, so a cloudy half hour can still set it: do not count on solar to cut the demand charge.

What decides your answer

  • Daytime load. A plant running weekdays and Saturdays in daylight uses most of its output; a night-shift operation exports much more at the lower credit.
  • Tariff. On low voltage, a kWh used saves about twice the September 2026 export credit. On medium voltage the gap between 29.83 sen plus AFA saved and 25.15 sen credited is much smaller, so sizing to real load matters even more.
  • Years left. Payback depends on staying long enough. Line it up with your lease term and renewal options.
  • Roof works. Strengthening, sheet replacement and walkways can change the cost.
  • How you pay. Cash, bank loan, solar leasing or a PPA with a registered investor change who carries the risk.

We do not quote a payback period, because it differs from roof to roof. Ask each installer to put in writing the system cost including structural works and fees, the share of output used on site, the tariff, AFA and export credit assumed, upkeep and inverter replacement, and any financing or PPA escalation.

Who owns the solar panels in a rented factory?

Direct answer: the contract decides, so write it down. Without a clause, the landlord can argue that panels fixed to the roof became part of the building.

Section 5 of the National Land Code defines land to include all things attached to the earth or permanently fastened to anything attached to the earth. Malaysian courts apply the English common law test on fixtures through the Civil Law Act 1956: the degree of annexation and its purpose, as Kevin Wu & Associates explains. Bolted rails and panels on a roof are exactly the kind of item that test is argued over.

How you pay also decides ownership. SEDA's page describes the models this way: bought with cash or a loan, "the site owner is the system owner"; under a PPA the system is owned by the registered solar PV investor; under solar leasing it passes to the site owner when the lease period ends. SEDA writes as if the applicant owns the site, so in a rented factory agree in writing whether "site owner" means you or the landlord. Carbon credits and similar benefits from the generation belong to the Solar ATAP consumer, which is the tenant when the account is the tenant's.

Clauses for a solar addendum to the tenancy

Clause What to settle
Consent Approval of a specific design, with the engineer's report and drawings attached
Ownership Who owns panels, rails, inverters and cables during and after the tenancy
Roof repairs Who pays to lift and refit panels when the landlord repairs or replaces the roof
Leaks Who pays for leaks caused by fixings or penetrations
Insurance Whose policy covers the panels, the building and third-party claims
Access Roof access for cleaning, inspection and Bomba requirements
End of tenancy Remove and make good, hand over free, or a buyout at an agreed formula
Sale of the building That the clause binds a buyer, and what happens to any PPA
Bank If the factory is charged, whether the landlord's bank must consent to the works

What happens to the solar at the end of the tenancy?

Direct answer: you remove it and make good, hand it to the landlord, or sell it to the landlord or the next tenant. Agree which one before installation, not when the lease expires.

  • Removal is the default. PLANMalaysia's guideline says panels must be taken off the structure when they are no longer used, so abandoned panels are not an option.
  • Taking the programme with you. Under section 18.3 of the guidelines, a Solar ATAP consumer that relocates may apply to SEDA to continue at the new premises for the remaining years, with a new contract with TNB. The 10 years do not restart.
  • Leaving the panels behind. The guidelines provide for two changes only: a sale of the premises by the consumer and relocation of the consumer. A change of tenant is not one of them, so a new tenant taking over your panels should ask SEDA how it can apply before relying on export credits.
  • Reinstatement. Spell out the scope: panels, rails, cables, inverters, roof patching and the time allowed. Our guide to reinstatement works at the end of a factory tenancy covers how this affects your deposit.
Workers removing solar panels from a factory roof at the end of a tenancy as landlord and tenant watch
IllustrationWorkers removing solar panels from a factory roof at the end of a tenancy as landlord and tenant watch

What happens to the solar when the factory is sold?

Direct answer: the Solar ATAP contract does not pass with the title. The new owner must apply and sign a new contract.

  • Owner-occupier selling. Under sections 18.1 and 18.2, the new owner may apply to SEDA to continue for the residual period, and the programme continues only once the new owner signs a new Solar ATAP contract with TNB.
  • Landlord selling with a tenant's panels on the roof. The ATAP contract stays in the tenant's name, but the tenant's right to remain depends on whether the tenancy binds the buyer. Our guide on buying a factory with a tenant explains when it does. Make the solar addendum binding on successors and disclose it in the sale agreement.
  • PPA or leased systems. The investor owns the panels, so the buyer must take over the contract or the investor removes them. Read the assignment and early termination clauses before you list the factory.
  • Hand over the papers: the SEDA approval and Solar ATAP contract, the Energy Commission licence or notification, the endorsed structural drawing, the single line diagram, warranties, maintenance and insurance records, and any PPA or lease.

Does solar raise a factory's property value?

Direct answer: not in any way the registered data can show. JPPH-registered sale records, which we aggregate on our industrial transactions pages, show price, land area, type and location, not whether a roof had panels, and we have found no JPPH or NAPIC figure that measures a solar premium for factories. Do not pay one.

What solar can do is widen the group of buyers or tenants who want the building: manufacturers with heavy daytime loads and exporters asked about their carbon footprint. What it can take away: leaks under the array, a PPA the buyer does not want, fewer Solar ATAP years left each year, and the cost of removal. Our guide on selling a factory vacant or tenanted covers whether to upgrade before a sale. Repairs in general, the TNB industrial tariff in full and green building certification are covered in separate FactoryHub guides.

Frequently Asked Questions

Is factory solar worth it in Malaysia?

It usually is when most of the output is used on site during the day. On a low voltage tariff a kWh you use saves 50.68 sen plus AFA, while an exported kWh earns the Average SMP, RM0.2515 for September 2026. On medium voltage the saving is 29.83 sen plus AFA, and demand charges stay, so check your load profile before deciding.

Can a tenant install solar panels on a rented factory in Malaysia?

Yes, if the tenant has its own TNB account and the landlord gives written consent. Tenants on a landlord's sub-meter in a multi-tenant building cannot apply for Solar ATAP. The tenancy should also run long enough for the up-to-10-year Solar ATAP contract, or say what happens if it ends earlier.

Is my factory roof suitable for solar panels?

Only a structural engineer's check can confirm it. The mounting structure must be certified, the roof covering should meet Bomba's fire test requirement, and walkways of 1.2 m or 1.8 m along the edges reduce the usable area. Replace ageing roof sheets before installing, because replacing them later means lifting the whole array.

Does solar raise property value of a factory?

No registered data shows that it does. JPPH-registered sale records do not record whether a factory had panels, and the Solar ATAP contract does not pass to a buyer automatically. Solar can make a factory more attractive to buyers or tenants with daytime loads, but it is not a guaranteed addition to price.

What is the Solar ATAP programme?

Solar ATAP is the rooftop solar scheme for Peninsular Malaysia that replaced NEM from 1 January 2026, regulated by the Energy Commission and run by SEDA. A factory can install up to 100% of its average maximum demand, capped at 1,000 kW, for up to 10 years. Surplus exported to TNB is credited at the Average SMP and only within the same billing period.

Who owns the solar panels when the factory tenancy ends?

Whoever the tenancy or solar addendum says. Without a clause, panels fixed to the roof can be argued to be part of the land, which the National Land Code defines to include things permanently fastened to the earth. Under a PPA the registered investor owns the system, so agree removal, handover or buyout before installation.

Can my landlord sell me solar electricity?

Not simply by charging per kWh. Section 9 of the Electricity Supply Act 1990 allows only a supply authority, or a person with a licence or exemption, to supply electricity to another person. Solar ATAP PPAs and leases go through SEDA-registered solar PV investors, so ask the Energy Commission or a lawyer first.