Cold Storage Warehouse in Malaysia: Specs to Look For

Refrigeration runs around the clock, so a cold store lives or dies on its power supply. Racked pallets of frozen goods are also heavy. Most cold rooms are built inside an ordinary warehouse, so pick a shell with enough power, floor strength and height.
A cold storage warehouse with insulated walls, racking and a refrigerated lorry

Where can I find a warehouse suitable for building a cold room, and who can help me check it?

Look at the current matching FactoryHub listings below, filtered on stated power and floor loading. Passing these filters does not mean a unit has a cold room. Tell Jason Low (PEA 1478) or Peter Tan (REN 12771) on 016-666 6872 your storage temperatures, pallet count, racking height, budget and target area. FactoryHub can shortlist and confirm actual availability and building specs; your refrigeration contractor confirms room design and temperature.

Peter Tan · REN 12771016-666 6872

Key takeaways

  • We shortlist cold storage warehouses from at least 400 A three-phase power and 3 tonnes per square metre floor loading.
  • Refrigeration runs all day, so check the supply, a backup generator connection and the TNB tariff before price.
  • Racked cold rooms are heavy: work out your racking load with the floor loading calculator.
  • Ask whether the slab can take an insulated cold room floor, or budget to add one.

Starting specs we shortlist from

WhatStarting point
Power supplyFrom 400 A three phase; more for blast freezing or large rooms
Floor loadingFrom 3 t/m²; more for high racking
Ceiling heightEnough for racking plus insulated panels and evaporators
OtherSpace for condensing units, generator, loading bay with dock seal

These are FactoryHub's shortlisting starting points, not legal or engineering requirements. Confirm power, floor loading and approvals with your own engineer before you commit.

Check before you sign

  • Incoming supply, room for a backup generator and space outside for condensing units.
  • Floor that can take an insulated cold room floor and racking loads.
  • Loading bays that let trucks dock without leaving doors open for long.
  • Fire safety requirements for insulated panels and high racking.
  • Running costs: refrigeration makes power the biggest monthly bill.

Factories for sale that meet these specs

See all 198 →

Factories for rent that meet these specs

See all 337 →

Size it for your own operation

Peter Tan

Built by Peter Tan (REN 12771)

Peter is an industrial property negotiator with a software engineering background. He built FactoryHub.my and its spec tools himself, so buyers and tenants can shortlist factories by power supply, ceiling height and floor loading before the first viewing.

About Peter →

Industry guides

FAQ

How much power does a cold storage warehouse need?

Refrigeration is the main load and runs all the time. Small cold rooms can work on a modest supply, but a warehouse built around cold storage often starts at 400 A three phase and rises with blast freezers and room size. Size it with the power calculator.

Can I build a cold room inside an existing warehouse?

Usually yes. Cold rooms are commonly built from insulated panels inside a standard warehouse. Check the power supply, the floor and the height first, and agree with the owner on what happens to the room at the end of a lease.

How are these warehouses chosen?

They are live FactoryHub listings that state at least 400 A of power and 3 t/m² of floor loading. They are a starting shortlist, not a guarantee that a unit suits cold storage.

Other industries

Talk to the agent directly

Tell us what you need or what you want to sell or let. We usually reply within hours.

Watch the short video

Built the cold room, then found the power is not enough? That money is gone. Check power first: refrigeration runs around the clock, so confirm the supply and the backup generator. Check the floor: racks full of frozen goods are heavy. Agree with the landlord before signing what happens to the cold room when the lease ends. Every spec to check is on FactoryHub's cold storage warehouse page. Peter Tan (REN 12771) 016-666 6872

Video transcript

Renting a warehouse for cold storage? Some find out the power is not enough only after the cold room is built. Point four is the one most people miss. One, power. Refrigeration runs around the clock. Our starting point is 400 amps three phase, and a backup generator must be able to connect. Two, the floor. Racks full of frozen goods are heavy, so the floor should take at least 3 tonnes per square metre. Three, outside. You need room for the condenser units, and a loading bay with a door seal so the door is not open for long while a lorry unloads. Four, the one most people miss. Most cold rooms are built inside an ordinary warehouse, so agree with the landlord before signing what happens to it when the lease ends. FactoryHub's cold storage warehouse page lists everything to check before you sign.