Key Takeaways
- The East Coast Rail Link (ECRL) has 20 stations on a 665 km line: 2 in Kelantan, 6 in Terengganu, 7 in Pahang and 5 in Selangor. Ten are passenger stations and ten handle both passengers and cargo, according to PLANMalaysia's ECRL land use master plan.
- Phase 1 covers 16 stations from Kota Bharu to ITT Gombak. Trial operations run from 7 November to 2 December 2026, and commercial passenger services are targeted to start on 12 December 2026.
- Phase 2 adds Bandar Serendah, Puncak Alam, Kapar and Jalan Kastam towards Port Klang, with branch lines into Westports and Northport. It was scheduled for completion in December 2027 and full operation by January 2028.
- In Selangor, Bandar Serendah and Puncak Alam are the cargo stations, according to Malaysia Rail Link's 2024 station plan and the Selangor Menteri Besar. ITT Gombak, Kapar and Jalan Kastam are passenger stations; at Port Klang the freight line runs on past Jalan Kastam to Westports and Northport.
- For a factory or warehouse decision, look at the nearest cargo station, the truck route to your gate and JPPH-registered prices in the park, not a "near ECRL" label.
What are the 20 ECRL stations?
The ECRL runs from Kota Bharu in Kelantan down the coast through Terengganu and Pahang, crosses the Titiwangsa range into Selangor and ends at Port Klang. The list below follows the order and station types in Table 1.2 of the Pelan Induk Bersepadu Guna Tanah Laluan Rel Pantai Timur (PeGTaECRL), the land use master plan that PLANMalaysia prepared for the stations and their surroundings up to 2040.
| No. | Station | State | Type | Phase |
|---|---|---|---|---|
| 1 | Kota Bharu | Kelantan | Passenger | Phase 1 |
| 2 | Pasir Puteh | Kelantan | Passenger and cargo | Phase 1 |
| 3 | Jerteh | Terengganu | Passenger | Phase 1 |
| 4 | Bandar Permaisuri | Terengganu | Passenger | Phase 1 |
| 5 | Kuala Terengganu | Terengganu | Passenger | Phase 1 |
| 6 | Dungun | Terengganu | Passenger and cargo | Phase 1 |
| 7 | Kemasik | Terengganu | Passenger | Phase 1 |
| 8 | Chukai | Terengganu | Passenger and cargo | Phase 1 |
| 9 | Cherating | Pahang | Passenger | Phase 1 |
| 10 | Kuantan Port City | Pahang | Passenger and cargo | Phase 1 |
| 11 | KotaSAS | Pahang | Passenger | Phase 1 |
| 12 | Paya Besar | Pahang | Passenger and cargo | Phase 1 |
| 13 | Maran | Pahang | Passenger and cargo | Phase 1 |
| 14 | Temerloh | Pahang | Passenger and cargo | Phase 1 |
| 15 | Bentong | Pahang | Passenger and cargo | Phase 1 |
| 16 | ITT Gombak | Selangor | Passenger | Phase 1 (western end until Phase 2) |
| 17 | Bandar Serendah | Selangor | Passenger and cargo | Phase 2 |
| 18 | Puncak Alam | Selangor | Passenger and cargo | Phase 2 |
| 19 | Kapar | Selangor | Passenger (listed as a future station) | Phase 2 |
| 20 | Jalan Kastam (Port Klang) | Selangor | Passenger; freight branches to Westports and Northport | Phase 2 |
A few names cause confusion in news reports and maps. ITT Gombak is the Gombak integrated transport terminal, also called Terminal Bersepadu Gombak. Bandar Serendah appears as Serendah Baru in older documents; the master plan notes it was renamed after feedback from the Hulu Selangor Municipal Council (MPHS). KotaSAS is the new administrative centre outside Kuantan, while Kuantan Port City is the station that serves the port.
Which ECRL stations connect to other rail lines?
PLANMalaysia names four integration stations where the ECRL meets other transport: Temerloh, ITT Gombak, Bandar Serendah and Jalan Kastam. MIDA's ECRL overview lists the same four as interchanges and names the connecting services as KTM ETS and Intercity, KTM Komuter and the LRT.
Do the ports have their own branch lines?
Yes. The master plan lists branch (spur) lines to Kerteh, Kemaman and Kuantan Port in the Dungun to Mentakab section, and a Temerloh spur plus the Northport and Westports branches at the Port Klang end. A 2024 MRL presentation published by MIDA puts the main line at 592 km and the Westports and Northport section at 25 km. Cargo reaches the two Port Klang terminals by running through Jalan Kastam and onto these port branches.
When does each phase of the ECRL open?
| Section | Stations | Status on 17 November 2026 |
|---|---|---|
| Phase 1: Kota Bharu to ITT Gombak | 16 | Trial operations 7 November to 2 December 2026; commercial passenger services targeted for 12 December 2026 |
| Phase 2: ITT Gombak to Port Klang | 4 more: Bandar Serendah, Puncak Alam, Kapar, Jalan Kastam | Scheduled for completion in December 2027 and full operation by January 2028 |
According to The Edge, MRL finished the fault-free run on 29 October 2026 and Phase 1 was 98.47% built as of October. The trial programme is run by ECRL Operation Sdn Bhd (EOSB), a 50:50 joint venture between Malaysia Rail Link (MRL) and its Chinese contractor. On the first trial run reported by paultan.org, the train left Gombak at 7am, reached KotaSAS in 88 minutes and arrived in Kota Bharu at 10.58am after a stop at Kuala Terengganu. Economy fares from Gombak to Kota Bharu start at RM125 on Transit and RM147 on the limited-stop Express.
For freight the dates differ by section. Transport Minister Anthony Loke said on 20 October 2026 that freight between Gombak and Kota Bharu would start alongside passenger services, but that "freight services connecting to Port Klang will take approximately another year" because the Gombak to Port Klang section is still under construction, as Malay Mail reported. Bernama, carried by DagangNews in October 2025, reported that Phase 2 was expected to be completed in December 2027 and fully operating by January 2028.
On 16 November 2026, Deputy Transport Minister Datuk Hasbi Habibollah told the Dewan Rakyat that ECRL cargo revenue is projected at RM68 million in 2027 and RM71 million in 2028, rising to RM214 million in 2029 in line with the phased opening of the line and its cargo facilities, DagangNews reported. In the long run the government expects about 70% of ECRL revenue to come from cargo.
Which ECRL stations handle cargo?
Ten of the 20 stations are passenger and cargo stations:
- Pasir Puteh (Kelantan)
- Dungun (Terengganu)
- Chukai (Terengganu)
- Kuantan Port City (Pahang)
- Paya Besar (Pahang)
- Maran (Pahang)
- Temerloh (Pahang)
- Bentong (Pahang)
- Bandar Serendah (Selangor)
- Puncak Alam (Selangor)
The master plan also gives three stations a Cargo-Oriented Development (COD) category, which means the land around them is planned around logistics and cargo activity: Bandar Serendah, Pasir Puteh and Kuantan Port City. Most of the other stations are Transit-Oriented Development (TOD) stations, planned around the area within a 5 to 10 minute walk of the platform, and three (Bandar Permaisuri, Kemasik and Maran) are Transit-Adjacent Development (TAD) stations.
How much can one ECRL freight train carry?
Malay Mail reported that ECRL freight trains, pulled by electric locomotives at up to 80 km/h, can haul as many as 45 wagons with a maximum of 3,500 tonnes per trip. MRL's presentation lists three wagon types: open-top box wagons, box cars and container flat-bed wagons. It also draws every rail shipment as a first mile to a freight station, rail between freight stations, then a last mile to the destination. For most factories that first and last mile is a truck.
MRL has also proposed a landbridge in the same presentation: manufactured goods from the Klang Valley carried by rail to Kuantan Port and shipped on to Sabah and Sarawak, with Serendah and Port Klang as the western rail points.
Which industrial areas are near the Selangor ECRL stations?
Selangor has five stations on a 90.5 km stretch, according to the state government's answer in the Selangor State Assembly. That answer, dated January 2023, listed Jalan Kastam rather than Puncak Alam as the second cargo station, but Malaysia Rail Link's 2024 station plan and the Selangor Menteri Besar in October 2024 give the current split: Bandar Serendah and Puncak Alam for passengers and cargo, and ITT Gombak, Kapar and Jalan Kastam for passengers. The councils below are the ones named in the gazetted Selangor State Structure Plan 2035 (Amendment).
| Station | Council | Type | Master plan category | Industrial areas in the same town |
|---|---|---|---|---|
| ITT Gombak | MPS (Selayang) | Passenger | Regional station, TOD | Passenger terminal only |
| Bandar Serendah | MPHS and MPS | Passenger and cargo | Urban station, COD | Serendah and Bukit Beruntung industrial areas |
| Puncak Alam | MPKS (Kuala Selangor) | Passenger and cargo | Suburban station, TOD | Eco Business Park V, Taman Industri Alam Jaya, Alam Perdana |
| Kapar | MBDK (Klang) | Passenger, listed as future | Suburban station, TOD | KIIP Kapar and Sungai Kapar Indah |
| Jalan Kastam | MBDK (Klang) | Passenger; the freight line continues to Westports and Northport | Regional station, TOD | Port Klang industrial belt |
The Section 9 works, 55 km from Serendah to Jalan Kastam, pass Bandar Baru Sungai Buaya, Saujana Rawang, Batu Arang, Puncak Alam, Kapar and Port Klang, crossing the North-South Expressway, Jalan Kuala Selangor, the LATAR expressway and Jalan Kapar. The line ends at Jalan Kastam for passengers and continues to Westport and Northport for cargo.
Bandar Serendah: the inland cargo point for northern Selangor
Bandar Serendah is the only Selangor station that is both a cargo station and a COD station, and it is an integration station with KTM. For factories in Serendah, Bukit Beruntung, Rawang and Batang Kali it is the nearest point where ECRL cargo can be loaded. The state structure plan also names a northern growth corridor from Bestari Jaya and Ijok through Puncak Alam, Bandar Bukit Beruntung, Serendah and Batang Kali to Kuala Kubu Bharu, served by the West Coast Expressway and the ECRL. Jason Low's Serendah area guide covers the local parks and road access.
Puncak Alam: the second Selangor cargo station
Puncak Alam is a passenger and freight station in MRL's station plan. For factories in Puncak Alam, Ijok, Bestari Jaya and the north of Kuala Selangor district, it is the nearest point after Bandar Serendah where ECRL cargo can be loaded. Cargo services west of Gombak only start once the Gombak to Port Klang section is finished, so it is an option for when Phase 2 opens, not one you can use today.
Kapar: a passenger stop beside factory parks
Kapar sits among active factory parks but does not handle cargo, so its value to a factory is mainly staff travel. PLANMalaysia's 2024 master plan lists Kapar as a future passenger station, while the Section 9 contractor said in October 2025 that stations would be built at Puncak Alam, Kapar and Jalan Kastam. A Kapar factory that wants rail freight would truck its containers to the Port Klang terminals or to Puncak Alam.
Jalan Kastam: the Port Klang end of the line
Jalan Kastam in Port Klang is the western end of the passenger line and a regional station. It serves passengers only; the freight line continues from here along a 29 km diversion to Northport and Westports, as the Selangor Menteri Besar described it. For warehouse and logistics operators already in the port belt, see how the port zones differ in our Westport vs Northport vs PKFZ comparison.
What do factories near the Selangor stations sell and rent for today?
These are JPPH-registered transactions aggregated by FactoryHub, latest month August 2026. Prices are 24-month medians and every sale psf is per sq ft of land, not built-up. No official source links any of these figures to the ECRL; treat them as the baseline before Phase 2 opens.
| Station | Area in the data | Semi-detached factory | Detached factory | Industrial land | Deals in 12 months | Median factory rent |
|---|---|---|---|---|---|---|
| Bandar Serendah | Serendah | RM3.16 million (RM213 psf of land) | RM8.65 million (RM166 psf of land) | RM37 psf of land | 145 | RM0.95 psf/month |
| Puncak Alam | Ijok & Puncak Alam | RM3.3 million (RM225 psf of land) | RM7.5 million (RM192 psf of land) | RM90 psf of land | 22 | RM1.52 psf/month |
| Kapar | Kapar | RM6.3 million (RM329 psf of land) | RM14.9 million (RM306 psf of land) | RM100 psf of land | 126 | RM1.40 psf/month |
| Jalan Kastam | Klang & Port Klang | RM5 million (RM337 psf of land) | RM14.9 million (RM270 psf of land) | RM90 psf of land | 288 | RM1.43 psf/month |
The gap between Serendah and the Klang side is wide: industrial land in Serendah registers at RM37 psf of land against RM100 psf of land in Kapar. Part of that is distance from the port, which rail freight does not remove, though it can change how some shippers weigh it.
What does an ECRL station mean for a factory or warehouse?
Freight access comes from cargo stations, not passenger stops
A passenger station brings commuters and, over time, shops and housing under a TOD plan. Rail freight only reaches you through a cargo station and a truck. In Selangor that means Bandar Serendah, Puncak Alam or the port branches to Westports and Northport. When a listing says "near ECRL", ask which station and what type it is.
Selangor plans cargo-led development around cargo stations
The amended Selangor State Structure Plan 2035, gazetted on 19 March 2026, carries two initiatives under its port policy that matter here: implement the Cargo-Oriented Development concept at ECRL stations with cargo services, and develop an inland port to move cargo to and from Port Klang. Land around Bandar Serendah is the clearest Selangor case for logistics and warehouse demand that follows the rail.
Land was acquired along the alignment
The state assembly answer records that the Selangor land needed for the line was gazetted under Section 8 of the Land Acquisition Act 1960. If a lot you are buying sits beside the alignment, check whether any part of it was taken and how much frontage and access remain. This guide is general information, not legal or investment advice.
How is this different from buying a house near a station?
A house buyer cares about the walk to the platform. A factory buyer cares about where a 40 ft trailer joins the rail and how long the road leg is. A passenger stop may bring more traffic and higher-density zoning near the station, which can help a showroom or office but does little for a manufacturing plant that ships containers.
How do you check a factory site near an ECRL station?
- Find the nearest cargo station, not just the nearest station. In Selangor that is Bandar Serendah or Puncak Alam, or the port terminals for Port Klang freight.
- Ask the council (MPHS, MPS, MPKS or MBDK) how the lot is zoned in the local plan and whether it falls inside a TOD or COD planning area around a station.
- Check the title and the land office for any acquisition for the rail reserve, and confirm the remaining access road.
- Drive the truck route from the cargo station or port gate to the factory gate, and measure turning space for a 40 ft trailer.
- Compare JPPH-registered prices in the same park on the transaction pages above, never asking prices.
- Match the lease to the timeline. If you plan to use rail to Port Klang, a lease that runs past January 2028 lets you test it without moving.
Frequently Asked Questions
How many stations does the ECRL have?
The ECRL has 20 stations: 2 in Kelantan, 6 in Terengganu, 7 in Pahang and 5 in Selangor. Ten are passenger stations and ten serve both passengers and cargo. Phase 1, from Kota Bharu to ITT Gombak, opens with 16 of them.
Which ECRL stations are in Selangor?
Selangor has five: ITT Gombak, Bandar Serendah, Puncak Alam, Kapar and Jalan Kastam in Port Klang. ITT Gombak opens with Phase 1; the other four come with Phase 2, which was scheduled for full operation by January 2028. Only Bandar Serendah and Puncak Alam handle cargo; at Port Klang the freight line continues past Jalan Kastam to Westports and Northport.
Which ECRL stations handle cargo?
Pasir Puteh, Dungun, Chukai, Kuantan Port City, Paya Besar, Maran, Temerloh, Bentong, Bandar Serendah and Puncak Alam are passenger and cargo stations. Branch lines also run to Kerteh, Kemaman, Kuantan Port, Westports and Northport. Bandar Serendah, Pasir Puteh and Kuantan Port City are planned as Cargo-Oriented Development stations.
Who operates the ECRL?
Malaysia Rail Link (MRL), owned by the Minister of Finance Incorporated, owns the project. Operations and maintenance are run by ECRL Operation Sdn Bhd (EOSB), a 50:50 joint venture between MRL and its Chinese construction contractor, which is also running the trial operations.
Is the ECRL a high speed train?
ECRL passenger trains run at up to 160 km/h and freight trains at up to 80 km/h on an electrified standard gauge line shared by both. MIDA says the line cuts the trip between Kota Bharu and ITT Gombak to about four hours. It is an intercity line for passengers and freight rather than a passenger-only high-speed railway.
When will the ECRL reach Port Klang?
Phase 2 from Gombak to Port Klang was scheduled for completion in December 2027 and full operation by January 2028. In October 2026 the Transport Minister said freight services to Port Klang would take about another year. Until then, Gombak is the western end of the line.
Will an ECRL station raise factory prices nearby?
No official source has published a link between the ECRL and factory prices. What you can check is the JPPH-registered record: in the 12 months to August 2026 there were 145 industrial deals in Serendah and 126 in Kapar. Compare registered deals in the same park rather than paying for a "near ECRL" label.