Key Takeaways

  • An SMT or PCB assembly line does not need a special kind of building. It needs a factory that passes five checks: clean and stable power, a hall you can air-condition and dehumidify, a ground-floor slab that is strong, level and quiet, room for compressed air and fume exhaust, and land approved for light industry. The Department of Environment (DOE) lists bare printed circuit boards and loading components onto boards as Category 4, its light industry class.
  • Power quality decides more than the amp count. TNB's supply handbook says all critical equipment and processes must be immune to voltage sags, and makes the consumer responsible for keeping voltage sensitive equipment running. In a case published by MIDA, sags cost one plant about RM70,000 per incident until about RM25,000 of mitigation equipment cut 14 events a year to almost zero.
  • ESD flooring is not a legal requirement. Your ESD control programme (ANSI/ESD S20.20 or IEC 61340-5-1) and your customer decide it. Seated operators are grounded with wrist straps; an ESD floor with ESD footwear is for areas where people move, and person, footwear and floor together must stay below 1.0 × 10⁹ ohms and below 100 volts of body voltage.
  • Most SMT lines run in an air-conditioned, humidity-controlled hall, not a classified cleanroom. MetMalaysia records average daily maximum humidity above 94%, while moisture sensitive parts are rated for floor life at 30°C and 60% RH or less, so dehumidification is a production requirement. An ISO 14644-1 cleanroom class applies only when your customer or product calls for one.
  • Penang, Selangor or Johor depends on your customers and supply chain. In MIDA's 2025 manufacturing approvals Johor recorded RM24.58 billion, Penang RM22.38 billion and Selangor RM18.14 billion, with Selangor approving the most projects (410). Selangor suits makers who serve the domestic market and ship through KLIA or Port Klang.

The short answer: for electronics manufacturing, shortlist factories by power supply and power quality first, then by whether the production hall can be enclosed, air-conditioned and fitted with an ESD floor, then by the slab. Price comes after those, because a cheap unit that trips your placement machines in every thunderstorm is not cheap. This guide covers what a decision maker needs to check for an SMT, PCBA or box build plant: power quality, air-conditioning and humidity, ESD flooring, floor flatness and vibration, cleanliness class, compressed air, exhaust and waste, and which Selangor areas electronics makers use. It is general information on technical standards and regulations, not legal or engineering advice.

What does a factory for electronics, PCB or SMT production need?

The building itself can be an ordinary detached or semi-detached factory. What matters is what you can add to it and what the site can supply. Start by naming your process, because the requirements change sharply between assembly and board fabrication.

Which kind of electronics plant are you?

Process What happens on the floor What it means for the building
SMT and PCBA line Solder paste printing, pick and place, reflow, inspection Enclosed, air-conditioned hall, stable power, level ground-floor slab, compressed air, reflow exhaust
Through-hole and wave soldering Insertion, wave or selective soldering Adds solder fumes and solder dross to handle and store
Box build, test and burn-in Final assembly, functional test, burn-in racks More staff, less sensitive to the slab, but burn-in adds continuous power load
Bare PCB fabrication Drilling, imaging, etching, plating Wet chemistry, effluent treatment and chemical storage; far fewer buildings qualify

DOE's Guidelines for the Siting and Zoning of Industry and Residential Areas (second revised edition, October 2012) lists the manufacture of semiconductors and electronic components, including bare printed circuit boards and the loading of components onto printed circuit boards, as Category 4 with an overall buffer of 100 m and a primary buffer of 80 m. Category 4 covers activities with very low pollution potential that generate no significant scheduled waste. If your plant electroplates, note that the same guideline lists plating and anodizing of metals separately as Category 3, with a 250 m overall buffer, so confirm with DOE which listing applies to you before you sign.

The spec sheet to send with your enquiry

Item What to ask for Why it matters for electronics
Power supply Current kVA or amps, TNB supply scheme, substation on site SMT lines, reflow ovens and air-conditioning run for long hours
Power quality History of trips, TNB background data for the site A sag of a fraction of a second can stop a line or scrap boards
Enclosed hall Walls to the roof, ceiling, roof insulation, sealed loading bay Needed to hold temperature and humidity
Slab Ground floor, level, crack-free, rated floor loading Placement accuracy and line alignment
ESD A sound slab that can take ESD epoxy or vinyl, earth points Your ESD control programme
Utilities Space for compressor room, dryer, nitrogen, pipe routes Machines need clean, dry compressed air
Exhaust Routes through roof or wall for reflow and soldering fumes Chemical exposure rules from DOSH
Title and approvals Industrial title, CCC, light industry zoning DOE Category 4, council licence

How much power does an SMT line need, and why does power quality matter more than amps?

Direct answer: work out the load from your machine list, then make sure the site can supply it with clean voltage. List the nameplate power of every printer, placement machine, reflow oven, AOI, compressor and air-conditioning unit, and run it through the factory power calculator. Our guide on how much kVA a factory needs shows how to turn a machine list into amps.

What TNB will supply

TNB's Electricity Supply Application Handbook sets the supply scheme by maximum demand. Above 350 kVA and up to 1,000 kVA, supply is at 400 V by direct underground cable from a new substation. From 1,000 kVA the supply moves to 11 kV or 22 kV through a TNB switching station. The handbook also sets steady-state voltage limits of minus 6% to plus 10% at 400 V and 230 V, and a total harmonic voltage distortion limit of 5% at 400 V and below.

Your machines must accept that range. As an example, the Yamaha YRM20 placement machine is rated for three-phase AC at 200, 208, 220, 240, 380, 400 or 416 V, plus or minus 10%, at 50 or 60 Hz. Check every machine's rating against the declared supply before you buy or relocate it.

Voltage sags: the risk an amp count hides

TNB describes a voltage sag as a short change in the rms voltage supplied to the customer, and its power quality page says most sags come from faults on the power system, with lightning, equipment failure, cable damage and weather among the common causes. The power stays on, but a placement machine, PLC or drive can trip.

The rules put the burden on you. The ESAH states that "all critical equipment & processes must be immune to voltage sag", referring to IEC 61000-4-11 for equipment up to 16 A and IEC 61000-4-34 above 16 A, and that it is the consumer's responsibility to ensure voltage sensitive equipment can function continuously. TNB's power quality FAQ also lists MS 1760:2004, the Malaysian guide on voltage dips and short interruptions, and SEMI F47 for semiconductor equipment.

MIDA published a case from TNB's power quality programme on 25 September 2026. Voltage sags cost Sensata Technologies (Malaysia) about RM70,000 per incident. A TNB ride-through test found the weak point was the secondary control equipment of the chiller system, not the production machines. Two mitigation units costing about RM25,000 in total cut disruptions from about 14 events a year to almost zero. The lesson for an electronics plant: protect the air-conditioning controls as well as the line, because a tripped chiller lets the hall drift out of its humidity range.

What to check on site

  1. Ask TNB for background power quality data for the site. TNB says it can provide this for selected sites, and MIDA's article describes a free TNB power quality assessment service.
  2. Ask the landlord and the neighbours whether machines trip during thunderstorms, and look for symptoms TNB lists: drives tripping, unexplained computer shutdowns, breakers tripping without overload.
  3. Buy machines with stated sag immunity, and plan a UPS or other ride-through equipment for controllers, servers and chiller controls.
  4. If your load goes above 350 kVA, check whether a substation already serves the lot. A separate FactoryHub guide covers the cost of a TNB power upgrade and another covers backup generators.

Is ESD flooring needed for an SMT line?

Direct answer: no law requires it, but most electronics customers will. ESD flooring is one of two ways to ground people under an ESD control programme. The programme standards are ANSI/ESD S20.20 and IEC 61340-5-1:2024, which applies to organisations handling parts with withstand voltages of 100 V human body model and 200 V charged device model or more. The ESD Association notes in its Fundamentals of ESD, Part One that many electronic components are susceptible at less than 100 volts.

Wrist straps or an ESD floor

The ESD Association's Fundamentals of ESD, Part Three (2020) explains the split. Wrist straps are typically the primary means of grounding personnel, and seated operators handling exposed sensitive items are to be grounded with a wrist strap. A flooring and footwear system is especially appropriate where people move around, and it also grounds chairs and trolleys fitted with conductive or dissipative casters. Wrist straps must not be used where operators may be exposed to circuits of 250 volts or more.

The limits an ESD floor must meet

Test Limit Method
Person, footwear and floor together, resistance to ground Less than 1.0 × 10⁹ ohms ANSI/ESD STM97.1
Body voltage while walking Less than 100 volts ANSI/ESD STM97.2
Conductive floor material 1.0 × 10⁶ ohms or less to ground ANSI/ESD STM7.1
Dissipative floor material Above 1.0 × 10⁶ and below 1.0 × 10⁹ ohms ANSI/ESD STM7.1

Both of the first two limits must be met. The ESD Association adds that the line between conductive and dissipative has no practical significance; what counts is the footwear and floor combination you actually use.

Why the air-conditioning affects static

Dry air raises static. In the ESD Association's examples, a worker at a bench reaches about 6,000 V at 10% to 25% relative humidity but about 100 V at 65% to 90%, and walking across vinyl tile drops from 12,000 V to 250 V. Charge still builds at high humidity, so humidity is no substitute for grounding, but an over-dried hall makes ESD control harder.

What to check in the building

  • An ESD epoxy or ESD vinyl tile floor is laid on the existing slab, so the slab must be sound, dry and level. Cracks and patches show through.
  • The floor needs earth points bonded to the building earth. Ask your contractor to test the finished floor to STM97.1 and STM97.2 and keep the results for customer audits.
  • In a rented factory, get the landlord's written consent for the floor and agree at the start whether you must remove it when you leave.
Operator grounded by a wrist strap at a bench while a colleague walks on an ESD floor
IllustrationOperator grounded by a wrist strap at a bench while a colleague walks on an ESD floor

How much air-conditioning and humidity control does an electronics factory need?

Direct answer: no Malaysian rule sets a temperature or humidity for an SMT hall. Your components, solder paste and customer do. The building's job is to let you hold that range all day, in Malaysia's climate.

Why humidity is a production issue

MetMalaysia describes the climate of Malaysia as one of uniform temperature, high humidity and copious rainfall, with the average daily maximum relative humidity above 94% and readings that may reach 100%. Moisture sensitive components are rated against a much drier floor. The floor-life table in IPC/JEDEC J-STD-020 counts the time after a part leaves its moisture barrier bag, dry storage or bake and before reflow:

Moisture sensitivity level Floor life Floor condition
1 Unlimited 30°C / 85% RH or less
2 1 year 30°C / 60% RH or less
2a 4 weeks 30°C / 60% RH or less
3 168 hours 30°C / 60% RH or less
4 72 hours 30°C / 60% RH or less
5 48 hours 30°C / 60% RH or less
5a 24 hours 30°C / 60% RH or less

An open factory hall in Selangor will not stay within 60% RH, so the SMT area and component store need enclosed walls, a ceiling or insulated roof, air-conditioning with dehumidification, and dry cabinets for opened reels.

What decides the cooling load

There is no rule of thumb we can verify, so ask your M&E engineer for a heat load calculation before you sign. The inputs are the power drawn by reflow ovens and machines (nearly all of it ends up as heat in the hall), the number of operators, heat through the roof and walls, and the fresh air you bring in. On site, check:

  • Roof and wall insulation, and whether the production hall can be sealed from the loading bay.
  • A place for condensing units or chillers, and whether the roof can carry air handling units if you need them.
  • Ceiling height: a lower false ceiling reduces the air volume you condition but must leave room for ducts.
  • Power for air-conditioning that runs as long as the line, and sag ride-through for the chiller controls.

Does the floor matter? Flatness, loading and vibration

Direct answer: yes. Put placement machines on a ground-floor slab that is level along the whole line route and free from vibration. Offices, manual assembly, testing and stores can go upstairs once the floor loading is confirmed.

Loading

A modern placement machine is heavy for its footprint. The Yamaha YRM20 weighs about 2,150 kg to 2,250 kg for the main unit alone on a footprint of 1,374 mm by 1,948 mm, which works out to roughly 8 kN/m² averaged over that footprint, and the weight sits on a few levelling feet. Add printers, reflow ovens, racks and component towers, then check the slab with the floor loading calculator.

Vibration and upper floors

A paper by an Intel engineer published by IPC, Mechanical Vibrations: Its Effect on Assembly Equipment, found that the same pick and place machine, moved to the second floor of another site, showed floor vibration almost four times higher than at the first facility. It also notes that vibration from the floor and from neighbouring machines can reduce placement accuracy and yield. That is why SMT lines belong on the ground floor, away from presses, compressors and heavy truck routes.

Flatness

No Malaysian rule sets a flatness figure for SMT. Machines level on adjustable feet, but the printer, placement machines, reflow oven and conveyors must line up at one board transfer height, so a slab with dips, steps or cracks along the line route causes trouble. Ask your machine supplier for its installation specification, get the slab surveyed along the planned line, and ask the installer whether the line may cross a slab joint.

Does an electronics factory need a cleanroom, and which class?

Direct answer: most SMT and PCBA lines run in a controlled, air-conditioned area rather than a classified cleanroom. A cleanroom becomes necessary when your product or customer specifies one, for example optics, medical devices or modules for semiconductor equipment. No Malaysian law sets a cleanliness class for electronics assembly.

ISO 14644-1:2015 classifies the air cleanliness of a cleanroom or clean zone by the concentration of airborne particles, using particle sizes from 0.1 µm to 5 µm. Your customer's specification names the class; a cleanroom contractor designs to it. The class drives air handling power, filter area and ceiling height, so settle it before you shortlist buildings. For what a cleanroom-ready shell needs, see our semiconductor equipment and cleanroom factory guide; a separate FactoryHub guide covers cleanroom factories in detail.

ESD control works differently in a cleanroom. The ESD Association notes that cleanroom garments and the need to move make wrist straps difficult, so ionization and flooring and footwear systems carry more of the load.

Technician checking the level of a placement machine foot on a ground floor concrete slab
IllustrationTechnician checking the level of a placement machine foot on a ground floor concrete slab

What about compressed air, nitrogen, fume exhaust and waste?

Compressed air

Placement machines need clean, dry air. The Yamaha YRM20 specification asks for an air supply of 0.45 MPa or more, in a clean, dry state. ISO 8573-1 defines purity classes for particles, water and oil in compressed air, so agree a class with your machine supplier and size the compressor, dryer and filters to it. In the building, look for a compressor room that keeps noise and heat out of the production hall, and a short pipe route to the line.

Nitrogen

If your reflow process runs with nitrogen, plan space for a nitrogen generator or a tank, and ask your gas supplier what the installation needs. Leave room for it in the layout from the start.

Fumes and chemicals

Soldering, flux and cleaning solvents bring DOSH rules into play. Under the USECHH Regulations 2000, an employer must not carry out work that may expose employees to chemicals hazardous to health without first making a written assessment of the risk, and DOSH says the assessment must be done by assessors registered with the department. Plan exhaust routes through the roof or wall for reflow ovens and soldering stations before fit-out.

Scheduled waste

The Environmental Quality (Scheduled Wastes) Regulations 2005 list dust, slag, dross or ash containing metals such as lead or copper under SW 104 (ask DOE how your solder dross is classified), waste from electrical and electronic assemblies under SW 110, and spent solvents under SW 322 and SW 323. You need a secure storage area for these; a separate FactoryHub guide covers scheduled waste management.

Which Selangor areas do electronics makers use, and should you choose Penang, Selangor or Johor?

Penang, Selangor or Johor: what the approvals show

MIDA's table of manufacturing projects approved by state covers all manufacturing, not only electronics, but it shows where new plants are going:

State Projects approved in 2025 Total capital investment (RM million)
Kedah 84 24,619.4
Johor 323 24,577.1
Pulau Pinang 232 22,375.4
Selangor 410 18,136.3
Negeri Sembilan 55 5,341.3

Choose by your customers first. If you supply a Penang or Kulim plant every day, the haulage and engineering visits favour the north. If your supply chain runs through Singapore, Johor fits. Selangor fits makers who sell into the Klang Valley, ship by air through KLIA, which MIDA's infrastructure booklet puts at 2.9 million tonnes of cargo a year, or import and export through Port Klang.

Where in Selangor

  • Free industrial zones for exporters: Sungai Way (Petaling Jaya), Ulu Klang, Telok Panglima Garang and Pulau Indah (PKFZ). MIDA says FIZ companies are those exporting their entire production or not less than 80% of it, with raw materials mainly imported. Where an FIZ is not practical, a Licensed Manufacturing Warehouse gives similar facilities.
  • Established light industrial areas: Shah Alam, Subang and Petaling Jaya, Puchong and Bangi carry the detached and semi-detached stock that EMS and PCBA firms usually look at. Our guide on which industrial area suits your industry compares them by freight, zoning, power and labour.
  • North and south of the Klang Valley: Serendah and Rawang in the north, and Kuala Langat in the south, offer larger lots. Our partner site's guide to matching industries to Rawang, Serendah and Shah Alam covers the northern side.

Checklist before you sign

  1. Name your process (SMT, through-hole, box build or board fabrication) and confirm its DOE category, the industrial title, light industry zoning and the CCC.
  2. Total your machine and air-conditioning load in kVA and match it to the TNB supply scheme and the substation on site.
  3. Get power quality data for the site and a ride-through plan for the line, servers and chiller controls.
  4. Put the SMT line on a ground-floor slab; survey its level, cracks and joints along the line route; get the machine supplier's installation specification.
  5. Confirm the hall can be enclosed and sized for air-conditioning with dehumidification; get a heat load calculation.
  6. Decide which areas are ESD protected areas, choose wrist straps or a floor and footwear system, and plan the earth points and tests.
  7. Plan compressed air, nitrogen and exhaust routes, and a secure scheduled waste store.
  8. Check whether you need a MIDA manufacturing licence and when to apply.
  9. In a tenancy, get written consent for M&E and floor works, agree reinstatement terms, and negotiate a fit-out period. Separate FactoryHub guides cover rent or buy, and negotiating rent.
Selangor industrial estate with detached factories, rooftop condensers and a substation
IllustrationSelangor industrial estate with detached factories, rooftop condensers and a substation

Practical steps: more questions

How do I know if a factory has a power quality problem?

TNB lists warning signs such as drives tripping offline, unexplained computer shutdowns, breakers tripping without overload, very hot transformers and equipment failing at the same time each day. Ask the current occupier about these, ask TNB for background data for the site, and install a power quality monitor during your trial run if the line is critical.

Frequently Asked Questions

Where can I find a factory suitable for PCB manufacturing?

It depends on whether you assemble boards or make bare boards. PCB assembly fits ordinary detached or semi-detached factories in light industrial estates such as Shah Alam, Subang, Puchong, Petaling Jaya and Bangi, because DOE lists printed circuit boards as Category 4 (light industry). Bare board making adds etching and plating, which DOE lists as Category 3 with a 250 m buffer, plus effluent treatment and chemical storage, so far fewer buildings qualify. Confirm the title, the DOE category and, in Selangor, the LUAS discharge licences before you sign.

What are the requirements to obtain a manufacturing licence in Malaysia?

Under the Industrial Co-ordination Act 1975, a manufacturing company with shareholders' funds of RM2.5 million and above, or with 75 or more full-time paid employees, must apply for a manufacturing licence, according to MIDA. Smaller companies can apply for an exemption letter. Applications go to MIDA and the licence is approved by MITI.

Is ESD flooring needed for an electronics factory?

Not by law, but your ESD control programme under ANSI/ESD S20.20 or IEC 61340-5-1, and usually your customer's audit, will expect people handling sensitive parts to be grounded. Seated operators normally wear wrist straps; an ESD floor with ESD footwear grounds people who move around. If you use the floor as the grounding method, the person, footwear and floor must measure below 1.0 × 10⁹ ohms and below 100 V of body voltage.

What cleanroom class is needed for electronics manufacturing?

There is no single class. Most SMT and PCBA lines run in an air-conditioned, humidity-controlled area without an ISO class, while optics, medical and semiconductor equipment work may require a cleanroom. The class under ISO 14644-1 comes from your customer's specification, and a cleanroom contractor should confirm it before you choose a building.

Should an electronics factory be in Penang, Selangor or Johor?

Follow your customers and suppliers. Penang has an established E&E supply chain and the Bayan Lepas free zones, Johor is linked to Singapore, and Selangor serves the Klang Valley market with KLIA and Port Klang nearby. In 2025 MIDA approved 410 manufacturing projects in Selangor, 323 in Johor and 232 in Penang, across all industries.

Can an SMT line be installed on the first floor of a factory?

It is possible but not advisable for placement machines. An IPC-published study found the same pick and place machine on a second floor saw floor vibration almost four times higher, and upper floors also need a confirmed loading rating. Keep the SMT line on the ground floor and use upper floors for offices, manual assembly, testing or stores.

What temperature and humidity should an SMT area be kept at?

No Malaysian rule sets one; your component makers, solder paste supplier and customer do. Floor-life ratings for moisture sensitive parts under J-STD-020 assume 30°C and 60% RH or less for most levels, which Malaysia's outdoor air exceeds, so the area needs air-conditioning with dehumidification. Very dry air raises static, so the range should suit both moisture and ESD control.

Is an electronics factory light industry in Malaysia?

In DOE's siting guideline, making semiconductors and electronic components, bare printed circuit boards and loading components onto boards are Category 4, the light industry class, with a 100 m overall buffer. Electroplating is listed separately as Category 3. The title, the council's local plan and the DOE category must all fit your process.

Talk to us before you shortlist

Send us your machine list or total kVA, the hall size you need, whether you need an ESD or clean zone, your floor loading and your target date. Peter Tan (REN 12771, 016-666 6872) and Jason Low (PEA 1478, 012-288 1834), registered with BOVAEP under CID Realtors Sdn Bhd, will check the power, slab and approvals of each unit before you visit. FactoryHub is dedicated to helping every client find the right factory or warehouse.