Key Takeaways
- Floor loading is the weight a floor is designed to carry, stated in kilonewtons per square metre (kN/m²) on drawings and often in tonnes per square metre (t/m²) on listings. 1 t/m² is about 9.8 kN/m², so 10 kN/m² is about 1 t/m² and 3 t/m² is about 29 kN/m².
- In Selangor, the building by-laws require imposed floor loads to follow MS EN 1991-1-1 and require every structural plan to be marked with the imposed load each floor was designed for. That marked figure, not the listing, is the number to trust.
- Among FactoryHub listings that state a figure, detached factories most often state 3 t/m², semi-detached factories split between 3 t/m² and about 1 t/m² (10 kN/m²), and terrace factories that state one give 1 to 2 t/m². Where upper floors are stated separately, they are usually half or less of the ground floor.
- The slab rating is an average over the floor. Rack base plates, forklift wheels and machine feet put concentrated loads on small areas, so a Professional Engineer has to check those against the slab before you install.
- A mezzanine is a structure inside the building: the Street, Drainage and Building Act 1974 requires the council's prior written permission for any gallery, loft or similar structure, and its columns add point loads to the slab below.
Floor loading decides whether a factory or warehouse can carry your racking, stock and machines without cracking, settling or breaking the law. This guide explains what the numbers mean, what the Malaysian rules say, what figures terrace, semi-detached and detached factories usually carry, and how to check a floor before you commit. It explains rules in general terms and is not engineering or legal advice: a Professional Engineer must confirm the loads for your building.
What does floor loading in kN/m² mean?
Floor loading (also called floor load capacity or design imposed load) is the load a floor can safely carry on top of its own weight. Engineers work in kilonewtons per square metre (kN/m², the same as kPa). Owners and listings usually quote tonnes per square metre, because people think in tonnes of stock.
Converting kN/m² and t/m²
One tonne of mass weighs 9.80665 kN under standard gravity, so:
| Quoted as | About | Where you meet it |
|---|---|---|
| 1.5 kN/m² | 0.15 t/m² (153 kg/m²) | A home floor |
| 2.5 kN/m² | 0.25 t/m² | A general office floor |
| 5 kN/m² | 0.51 t/m² | Many factory upper floors |
| 10 kN/m² | 1.02 t/m² | A common ground floor figure in semi-D specs |
| 1 t/m² | 9.8 kN/m² | Listings |
| 3 t/m² | 29.4 kN/m² | The most common listed figure |
| 5 t/m² | 49 kN/m² | Heavier logistics and fabrication floors |
A figure quoted "per square foot" is almost always a typo for per square metre: 3 tonnes per sq ft would be over 30 t/m². You can run the conversion and your own load with the floor loading calculator.
Average load versus point load
The rating on the drawings is mainly an average spread over the floor (a uniformly distributed load). Real loads arrive through small contact areas: rack legs on base plates, forklift wheels, machine feet. Malaysian design standards therefore give each category two values: a distributed load qk in kN/m² and a concentrated load Qk in kN. A floor can pass on the average and still crack under one heavy foot.
What floor load do Malaysian building rules require for a factory?
Since 2012 in Selangor: MS EN 1991-1-1
Selangor's building by-laws, as amended by Sel. P.U. 142/2012, say that all imposed floor loads shall be calculated in accordance with MS EN 1991-1-1 (by-law 59). The same by-laws say that where forklifts may be used, special provision must be made in the floor design (by-law 60), and that all structural plans shall be clearly marked to indicate the imposed loads for which each floor was designed (by-law 16(3)). Where the actual load will exceed the calculated load, the actual load must be used (by-law 54). The federal version was amended the same way by the Uniform Building (Amendment) By-Laws 2021, gazetted on 31 December 2021, which replaced the old reference to the British code BS CP 3 Chapter V Part 1.
MS EN 1991-1-1 is the Malaysian adoption of Eurocode 1, which the Public Works Department notes is identical to the European standard, with local values set in a Malaysia National Annex. The values that matter for factory users:
| Use (National Annex category) | Distributed load qk | Concentrated load Qk |
|---|---|---|
| Rooms in a dwelling (A1) | 1.5 kN/m² | 2.0 kN |
| Offices, general use (B1) | 2.5 kN/m² | 2.7 kN |
| General storage (E13) | 2.4 kN/m² per metre of storage height | 7.0 kN |
| File rooms and office storage (E14) | 5.0 kN/m² | 4.5 kN |
| Cold storage (E19) | 5.0 kN/m² per metre of storage height, minimum 15.0 | 9.0 kN |
| Industrial use (E2) | No set value: agreed between client and authority |
Two points stand out. Storage load grows with stacking height: goods stacked 4 m high need at least 9.6 kN/m² and 8 m high at least 19.2 kN/m², so a 10 kN/m² floor covers only about 4 m of general storage by this measure. And for production floors the standard sets no number at all: the National Annex says loads for heavy equipment should be agreed between the client and the relevant authority, with the British guidance PD 6688 as the fallback.
Before 2012: the Fourth Schedule
Older factories were designed under the original Selangor Uniform Building By-Laws 1986, whose Fourth Schedule (deleted in 2012) set:
| Use | Distributed load |
|---|---|
| Factories and similar buildings | 5.0, 7.5 or 10.0 kN/m², as appropriate |
| Foundries | Not less than 20 kN/m² |
| Storage not listed separately | Not less than 2.4 kN/m² per metre of storage height |
| Cold storage | 5.0 kN/m² per metre of storage height, minimum 15.0 |
This explains why so many specifications quote 10 kN/m² for a factory ground floor: it was the top factory class in the old schedule. It is about 1 t/m², a third of the 3 t/m² that is now the most common figure on listings.
Machines and cranes
By-law 68 requires the design to allow for impact and vibration from installed machinery, with an increase in imposed loads of not less than 20% or the MS EN 1991-1-1 minimum, whichever is higher, and for concentrated equipment loads while machines are being installed or moved. Crane gantry girders have their own rule (by-law 69). None of this is checked for you when you move into an existing building: the floor was designed for the use declared at the time.
What floor loading do terrace, semi-D and detached factories usually have?
There is no fixed figure by building type. Each floor carries whatever its engineer designed it for. What we can show is what owners state. Among active FactoryHub listings that state a floor loading, checked on 14 November 2026:
| Factory type | Most common stated figure | Spread |
|---|---|---|
| Detached | 3 t/m², stated by about four in ten | About one in eight states 5 t/m² or more |
| Semi-detached | 3 t/m², stated by about a third | About three in ten state about 1 t/m² (10 kN/m²); very few state 5 t/m² or more |
| Terrace | Rarely stated | Those that state one give 1 to 2 t/m² |
These are owners' figures, not engineers' certificates. Treat them as a shortlist filter and verify them.
Upper floors are a different floor
Terrace and semi-D factories are often 1.5, 2.5 or 3.5 storeys, with offices above the production floor. The ground floor usually sits on the ground or on piles; the upper floors are suspended slabs, often designed for office use. Where FactoryHub listings state the upper floors separately, the figure is usually half or less of the ground floor, for example 10 kN/m² below and 5 kN/m² above, or 2 t/m² below and 1 t/m² above. Do not put stock, archives or machines upstairs on the strength of the ground floor figure.
Soft ground in Klang
A ground-supported slab only works if the ground under it will not settle excessively under the load. Parts of Klang sit on a very soft deposit that geotechnical engineers call Klang Clay, where the firm layer can lie very deep and differential settlement is a known problem. In Klang, Kapar or Port Klang, ask whether the floor slab is ground-bearing or carried on piles, and look for sunken bays, stepped joints and gaps under walls.
How much floor loading do racking, forklifts and heavy machines need?
Pallet racking
Work out the weight on one bay and divide by its footprint. Five levels of two one-tonne pallets on a 2.7 m by 1.1 m bay is about 3.4 t/m² before the rack's own weight and a safety margin, so look for at least 5 t/m². The floor loading calculator does this for your own bay. Then the engineer checks the load under each base plate, which is far higher than the average. For racking layout and eave height points in Klang warehouses, see this pallet racking guide.
Forklifts
MS EN 1991-1-1 classes forklifts by weight and lifting capacity and gives a static axle load for each class:
| Class | Lifting load | Static axle load Qk |
|---|---|---|
| FL 1 | 10 kN (about 1 t) | 26 kN |
| FL 2 | 15 kN (about 1.5 t) | 40 kN |
| FL 3 | 25 kN (about 2.5 t) | 63 kN |
| FL 4 | 40 kN (about 4 t) | 90 kN |
| FL 5 | 60 kN (about 6 t) | 140 kN |
| FL 6 | 80 kN (about 8 t) | 170 kN |
The axle load is then multiplied by a dynamic factor of 1.40 for pneumatic tyres or 2.00 for solid tyres. For a solid-tyred FL 3 truck the design axle load is 63 x 2.00 = 126 kN, the weight of about 12.8 tonnes on one axle. That is why by-law 60 asks for special provision where forklifts run.
Heavy machines
Take the machine's operating weight, its base or foot positions and any vibration. As an illustration, an 8-tonne machine on a 2 m by 2 m base averages 2 t/m² (about 19.6 kN/m²); with the by-law minimum of 20% for impact and vibration it is about 23.5 kN/m² before you look at the feet. Heavy presses and large moulding machines may need their own foundation, which is structural work with its own approval.
Can a factory floor take a mezzanine?
A mezzanine raises two questions: what the deck can carry and what the slab under its columns can carry.
Deck load
Tell the engineer the real use. An office deck is designed for 2.5 kN/m² under the National Annex, while shelving 2 m high is general storage at 2.4 kN/m² per metre, at least 4.8 kN/m², nearly twice as much. Each column then brings the deck's whole share down onto a small plate on the ground slab, so the slab check applies too.
Approval
Section 79 of the Street, Drainage and Building Act 1974 says no person shall erect in any building any partition, compartment, gallery, loft, roof, ceiling or other structure without the prior written permission of the local authority. The owner is presumed to have done it unless proved otherwise, and the council may remove an unapproved structure and recover the cost. The load rules in by-law 55 also apply to structural alterations, additions and changes of use. Existing stock: browse factories with a mezzanine floor and ask whether the mezzanine appears on the approved plans.
How do you check floor loading before installing machines or racking?
- List your loads. Racking bay weights and base plate sizes, forklift class and tyre type, each machine's weight, base size and vibration, and any mezzanine use.
- Ask for the structural plans. By-law 16(3) requires them to show the imposed load for each floor. Ask the owner or landlord for the approved plans and structural drawings, and note the unit used.
- Identify each floor. Ground-bearing slab, piled slab or suspended upper floor. Use the right figure for the floor you will use.
- Walk the slab. Look for wide cracks, broken joints, sunken areas near doors and old repairs, especially on soft ground.
- Appoint a Professional Engineer. The by-laws define an engineer as a registered Professional Engineer. Give them your load list and the drawings; where drawings are missing they assess the slab on site.
- Get it in writing. An engineer's letter on the floor's capacity for your layout, and for a lease, the landlord's written consent for racking anchors, machine bases or a mezzanine.
- Shortlist by spec. Start from high floor loading factories for rent or factory requirements by industry, then verify.
Common mistakes
- Reading 10 kN/m² as 10 tonnes. It is about 1 tonne per square metre.
- Using the ground floor figure for upstairs offices or a mezzanine.
- Checking only the average and ignoring base plates, forklift axles and machine feet.
- Raising racking height later without rechecking: storage load rises with every metre.
- Building a mezzanine without council permission, which can surface when you renew licences, insure or sell.
- Trusting a listing figure that has no drawing behind it. For more on reading specs, see factory specs explained.
Practical steps: more questions
Do I need approval to build a mezzanine floor in a factory?
Yes. Section 79 of the Street, Drainage and Building Act 1974 requires the local council's prior written permission before anyone erects a gallery, loft or other structure inside a building, and the council can remove an unapproved one and recover the cost. The design also has to follow the load rules in the building by-laws, so a Professional Engineer should design it.
Can I put heavy machines on the first floor of a terrace factory?
Usually not without an engineer's check. Upper floors in terrace and semi-D factories are often designed for office use, and where listings state them separately they are usually half or less of the ground floor figure. Put heavy machines on the ground floor unless a Professional Engineer confirms the upper slab can take the load, including vibration.
Frequently Asked Questions
What is a factory floor rated at 1 ton/m² suitable for?
A 1 t/m² floor (about 10 kN/m²) suits lighter work: assembly, packing, light production, offices and general storage stacked to about 4 m, since Malaysian design rules set 2.4 kN/m² for each metre of general storage height. It is too light for most pallet racking, where five levels of one-tonne pallets already average about 3.4 t/m², and for heavy presses or large moulding machines. Many semi-D factory specifications state about this figure, so have a Professional Engineer check rack legs and machine feet before you move in.
What machines can be placed on a 3 ton/m² factory floor?
A 3 t/m² floor (about 29 kN/m²), the most common figure on FactoryHub listings, takes machines whose weight spread over their base stays below it after at least a 20% allowance for vibration. For example, an 8-tonne machine on a 2 m by 2 m base averages 2 t/m², about 2.4 t/m² with the allowance. It is a common starting point for plastic injection moulding, while heavy presses and high-bay racking often need 5 t/m² or their own foundation. An engineer must still check the load under each machine foot.
Is a 5 ton/m² factory floor suitable for heavy industry?
Often yes for the loads, but the floor alone does not make a factory fit for heavy industry. A 5 t/m² floor (about 49 kN/m²) suits heavier logistics, high pallet racking and fabrication, and only about one in eight detached factory listings that state a figure gives 5 t/m² or more. Heavy presses, forging hammers and machines with strong vibration usually still need their own foundation. Heavy industry must also match the land title condition, the council zoning and the DOE siting guideline, which suggests a 300 m buffer from homes.
How do I find the floor load capacity of a factory?
Look at the approved structural plans. In Selangor, the building by-laws require every structural plan to be marked with the imposed load each floor was designed for. If the owner has no drawings, a Professional Engineer can assess the slab on site from its thickness, reinforcement and support before you commit.
How much weight can a concrete factory floor hold?
It depends on its design, not on how it looks. Among FactoryHub listings that state a figure, 3 t/m² (about 29 kN/m²) is the most common for detached and semi-D factories, while many semi-D specifications state 10 kN/m², about 1 t/m². Only the structural drawings or an engineer's assessment tell you the real capacity of a given floor.
How much weight can a 150mm concrete slab hold?
Thickness alone does not answer it. Capacity also depends on the reinforcement, the concrete grade, whether the slab sits on the ground, on piles or spans between beams, and on the soil underneath. Two 150 mm slabs can carry very different loads, so ask for the design load on the drawings or an engineer's check.
What is a typical warehouse floor load capacity in Malaysia?
There is no single standard figure. MS EN 1991-1-1 sets general storage at 2.4 kN/m² per metre of storage height and cold storage at 5.0 kN/m² per metre with a 15 kN/m² minimum, so the right floor depends on how high you stack. Among FactoryHub listings that state floor loading, 3 t/m² is the most common figure.
How do I convert kN/m² to tonnes per square metre?
Divide kN/m² by 9.81 to get t/m², or multiply t/m² by 9.81 to get kN/m². So 10 kN/m² is about 1.02 t/m², 20 kN/m² is about 2.04 t/m², and 3 t/m² is about 29.4 kN/m².
FactoryHub is dedicated to helping every client find the right factory or warehouse. If you need a floor that carries your racking or machines, talk to Peter Tan (REN 12771, 016-666 6872) or Jason Low (PEA 1478, 012-288 1834).