Key Takeaways

  • Signing is not the problem, moving in is. Under section 70(27)(f) of the Street, Drainage and Building Act 1974, anyone who occupies a building without a Certificate of Completion and Compliance (CCC), or permits it to be occupied, commits an offence: a fine of up to RM250,000, up to 10 years' jail, or both (Act 133, Part V). That reaches both the tenant and the landlord.
  • No CCC or CF usually means no normal business licence. MBSA lists a copy of the CF or CCC as item 7 of its licence checklist, and MBSJ lists the CF or CCC in its factory licence guideline.
  • Klang has a separate KTK programme licence, with strings attached. MBDK's licence for unauthorised factories lasts one year, costs three times the normal fee inside an industrial zone and five times outside it, and requires land conversion, planning and building plans to be submitted while it runs (MBDK declaration).
  • Bomba and insurance follow the building. A factory that is a designated premises needs a fire certificate renewed every year, and the owner commits an offence when none is in force. For business insurance you must disclose what you know, or a reasonable person would know, is relevant to the insurer.
  • Check before you sign: see the CCC or CF and the approved plans, confirm them with the council, walk the unit against the plans, and make the council licence a condition of the tenancy.

This guide is general information for factory tenants and landlords in Selangor and the Klang Valley. It is not legal or insurance advice; have a lawyer read the tenancy before you sign.

What do CCC and CF mean when you rent a factory?

The CCC (Form F) confirms that a building was completed to its approved plans and is fit to occupy. Only the Principal Submitting Person, the architect or engineer who submitted the plans, can issue it; the council does not (KPKT Local Government Department, CCC FAQ). The CCC system has been in place since 2007. Before that, councils issued the Certificate of Fitness for Occupation, which owners, banks and councils still call the CF or CFO, and projects that were still on the old system could finish under it by submitting Form E.

For a tenant, either document can be the right one:

  • CF or CFO: older factories approved under the old system.
  • CCC (Form F): newer factories.
  • Partial CCC (Form F1): a completed phase of a phased development. Check that the phase includes your unit.

Another "CF" causes confusion: the certificate of fitness for a lift, crane, boiler or air receiver under occupational safety law. That one covers machinery and says nothing about whether the building may be occupied. This guide is about the building certificate. Our CCC guide walks through the forms behind it.

Why some factories have neither

Situation What it means for a tenant
Older factory with a CF Acceptable: the councils below accept a CF or a CCC
New building still waiting for its CCC Do not move in yet. KPKT says vacant possession may be given only together with the Form F
Approved factory with sheds, mezzanines or partitions added later The original building is covered; the additions need their own permits or amendment plans
Factory built on agricultural land without approval (KTK) No CCC or CF at all; only a council's KTK programme licence, where one exists
The owner has lost the certificate Ask the council for a copy: MBDK's building department publishes a form to apply for a copy of a CF

Section 70(27)(f) of Act 133 makes it an offence to occupy "or permit to be occupied any building or any part thereof without a certificate of completion and compliance". The penalty is a fine not exceeding RM250,000, imprisonment for up to 10 years, or both. Three things follow for a factory:

  1. The tenant is exposed as the occupier. The section does not limit the offence to the owner.
  2. The landlord is exposed for permitting it. Letting the unit and handing over the keys is how a landlord permits occupation.
  3. "Any part thereof" covers additions. A shed over the yard, a mezzanine office or a closed side lane that you use is part of the building you occupy, so an approved main building does not cover an unapproved extension. Our guide to unapproved factory extensions explains how these are regularised.

Councils do act in industrial areas. On 7 and 8 May 2026, Kuala Langat council (MPKL) issued 26 offence notices and 20 notification notices in the Telok Panglima Garang industrial area for offences that included running a business without a licence and putting up structures without building approval or planning permission, under the Local Government Act 1976, the Street, Drainage and Building Act 1974 and the Town and Country Planning Act 1976 (Media Selangor, 11 May 2026).

Can a tenant get a business licence for a factory without CCC or CF?

The tenant applies for the licence in its own name, but the council looks at the building. In the Selangor councils below, the CF or CCC is a standard document.

Shah Alam (MBSA)

MBSA's checklist for business, industrial and advertisement licences, amended on 29 August 2025, asks for the SSM documents, the latest MBSA assessment tax bill, the current tenancy agreement stamped by LHDN and, as item 7, a copy of the CF or the CCC (Form F) (MBSA checklist). Item 11 adds that terrace, semi-detached and detached factories need a temporary building permit for partitions and awnings, and amendment plans submitted to the One Stop Centre for added partitions, sheds and extra space at the front, side or back. The processing fee for an industrial licence application is RM100 (MBSA composite licence).

Subang Jaya (MBSJ)

MBSJ puts factory licences in Category B, which needs technical comments from other departments and goes to its technical licensing meeting within 14 working days. Its document list includes the CF or CCC as item 7, and the guideline quotes its by-law plainly: no one may carry on a trade, business or industrial activity, or use any premises for it, without a licence (MBSJ factory licence guideline). A full licence runs one year. A six month temporary licence is possible while you wait for other technical approvals, such as renovation, ramp or partition permits, building alteration approval and the internal sanitary system. It is not a route around a missing CCC.

Our business premise licence guide covers the fees, signboard rules and timelines.

Klang (MBDK): the KTK programme licence

MBDK lists an industrial licence for the unauthorised factory (KTK) regularisation programme as a category of its own, beside the risky industrial licence (30 days) and the temporary industrial licence (14 days) (MBDK Licensing Department). The applicant signs a statutory declaration accepting these conditions (MBDK KTK declaration):

Condition What the declaration says
Validity One year, renewed every year if the council approves
Fee Three times the normal industrial licence fee for Category A (inside an industrial zone), five times for Category B (outside one)
Regularisation Land conversion, planning permission, building plans and road and drainage plans must be submitted while the licence is in force
Agency support Licensing support from Bomba's Klang zone office, DOE Selangor and DOSH Selangor during the licence
Land office Comply with the conditions of the special land development permit from the Klang District and Land Office
Cancellation The council can cancel it if the conditions are broken and local residents complain

For the 2025 renewal, MBDK's checklist asks Category A factories for an official land search or the land conversion application or approval, and Category B factories for the special temporary permit from the Klang land office. Both also need the previous licence, the planning permission application or approval, the building plan application or approval or the CCC, and letters from DOE, Bomba and DOSH (MBDK KTK 2025 checklist).

For a tenant the catch is plain: the licence is in the operator's name, but the land conversion and the plans move only if the landowner moves them. If the landlord stops, the licence cannot be renewed. Our Selangor KTK programme guide explains the state programme and its deadlines.

A factory tenant handing licence documents to an officer at a council counter
IllustrationA factory tenant handing licence documents to an officer at a council counter

Can you get Bomba approval or a fire certificate without CCC?

Under the Fire Services Act 1988, the Director General designates premises by use, size or location, and every designated premises needs a fire certificate that is renewed every year (sections 27 and 28). Bomba issues it only after an inspection shows adequate life safety, fire prevention, fire protection and fire fighting facilities, and it may first ask the applicant for plans and other particulars (section 29) (Act 341). Where no fire certificate is in force, the owner commits an offence, punishable since the 2018 amendment by a fine of up to RM50,000, up to 5 years' jail, or both (Act A1568).

In August 2025, JBPM's deputy director general said full enforcement would start in the first quarter of 2026, that factories and storage are among the nine designated categories, that 9,321 premises nationwide had been designated and 5,881 held a certificate, and that every premises receiving a CCC from the local authority must register for a fire certificate (Bernama via Astro Awani, 7 August 2025).

Why the CCC matters to Bomba: two of the stage certificates behind every CCC, Forms G8 and G9 for passive and active fire protection, need a confirmation letter from Bomba (KPKT CCC FAQ). A building with no CCC has no such record. That is why MBDK's KTK route asks for a Bomba support letter, and why MBSA asks for a Bomba letter when the activity involves flammable materials, petroleum, solvents or LPG.

Once you are in, section 32(2) requires the occupier of a designated premises to notify Bomba before making a material change, so plan your fit out with your engineer. Our fire certificate guide lists what Bomba checks.

Will insurance pay out if the factory has no CCC or CF?

That depends on the policy wording and on what you told the insurer. A factory policy taken out for a business is not a consumer insurance contract, so paragraph 4 of Schedule 9 of the Financial Services Act 2013 applies: before the contract is entered into, varied or renewed, the proposer must disclose any matter it knows to be relevant to the insurer's decision on the risk, rates and terms, or that a reasonable person in the circumstances could be expected to know is relevant (Financial Services Act 2013). The insurer must tell you of this duty in writing.

In practice:

  • Tell your insurer or broker in writing what the building has and lacks: CF or CCC, KTK licence, unapproved extensions.
  • Ask for written confirmation that the cover applies on that basis.
  • Remember that the landlord's building policy and your policy on machinery and stock are separate contracts, and each side owes its own disclosure.

What are the risks for the tenant and the landlord?

Risk Tenant Landlord
Occupation without CCC (Act 133, s.70(27)(f)) Liable as the occupier Liable for permitting occupation
Business licence Cannot supply the CF or CCC that councils ask for; trading without a licence breaches council by-laws Unit is hard to let to any tenant that needs a licence
Fire certificate (designated premises) Must notify Bomba before a material change Commits the offence when no certificate is in force
KTK licence (Klang) Pays three or five times the fee; the licence can be cancelled Must push land conversion and plan approvals forward
Insurance Owes disclosure on its own policies Owes disclosure on the building policy
Money already spent Renovation and machine installation may be wasted if the licence is refused Loses the rent if the tenant leaves under a licence clause
A landlord and a tenant discussing a lease inside an empty factory with an unfinished shed outside
IllustrationA landlord and a tenant discussing a lease inside an empty factory with an unfinished shed outside

How do you check a factory's CCC or CF before signing?

  1. Ask for copies of the CCC (Form F) or CF, the approved building plans and, for anything built later, the approved amendment plans or temporary building permits.
  2. Match the details on the certificate (lot number, address, description) to the unit, and check that a partial CCC covers your unit.
  3. Confirm with the council's building department or One Stop Centre. In Klang, MBDK has a form to apply for a copy of a CF.
  4. Walk the unit with the plans. Look for sheds, covered yards, mezzanines, partitions, awnings and closed side lanes that are not on them.
  5. Ask whether it is a KTK, which category it falls in, and whether the landowner holds the land office permit or has applied for land conversion. Ask for the previous KTK licence.
  6. Ask for the fire certificate if the factory is a designated premises, and for the Bomba endorsed fire installation plans.
  7. Visit the licensing counter with the address and your activity before you pay a deposit. Your activity may need extra agency letters (DOE, Bomba, police) on top of the building documents.

What should the tenancy agreement say?

  • A statement from the landlord that the CCC or CF covers the building and every structure you will use, with a list of anything that is not approved.
  • A licence condition: the tenancy and the rent start only after the council licence (and the fire certificate, where needed) is approved, with a full refund of deposits and advance rent if it is refused.
  • Who does and pays for regularisation: temporary building permits, amendment plans, Bomba upgrades and, for a KTK, the land conversion.
  • An exit right with a refund if the council or Bomba orders the unit closed, orders a structure removed, or does not renew a KTK licence.
  • An indemnity for fines and losses caused by the building's status rather than by your use.
  • Stamping: MBSA asks for the tenancy agreement stamped by LHDN, so stamp it before you apply.

Frequently Asked Questions

Can I rent a factory without CF in Malaysia?

You can sign the tenancy, but occupying a building without a CCC is an offence for the occupier and for the owner who permits it under section 70(27)(f) of the Street, Drainage and Building Act 1974. For an older factory, a CF issued under the old system is the right document. If there is neither, expect the council to refuse a normal business licence.

Can I get a business licence for a factory without CCC?

Usually not through the normal route. MBSA and MBSJ both list the CF or CCC among the documents for a licence. In Klang, MBDK has a separate KTK programme licence for unauthorised factories, valid one year at three or five times the normal fee and conditional on regularisation.

Who is liable if a rented factory has no CCC, the landlord or the tenant?

Both can be. Section 70(27)(f) covers anyone who occupies a building without a CCC and anyone who permits it to be occupied, with a fine of up to RM250,000, up to 10 years' jail, or both. For a designated premises with no fire certificate, the Fire Services Act puts the offence on the owner.

Can Bomba issue a fire certificate to a factory without CCC?

Bomba issues a fire certificate only after an inspection shows adequate fire safety facilities, and it may ask for plans first. JBPM has said every premises receiving a CCC must register for a fire certificate, and the CCC itself carries Bomba's clearance of the fire systems. A factory without a CCC has no record of that clearance, so ask Bomba what it needs for that building before you commit.

Does fire insurance cover a factory without CCC or CF?

It depends on the policy and on what was disclosed. Business policies fall under paragraph 4 of Schedule 9 of the Financial Services Act 2013, which requires you to disclose matters you know, or a reasonable person would know, are relevant to the insurer. Tell your insurer the building's status in writing and get written confirmation of cover.

Is a CF the same as a CCC?

They do the same job for different eras. The CF or CFO comes from the old system run by the councils; the CCC, in place since 2007, is issued by the architect or engineer who submitted the plans. MBSA and MBSJ accept either one for a licence.

How do I get a copy of a factory's CF?

Ask the owner first. If the original is lost, the council's building department can help: MBDK in Klang publishes a form to apply for a copy of a CF.

What is a KTK factory?

KTK stands for kilang tanpa kebenaran, an unauthorised factory, usually built on land not approved for industry. Selangor runs a regularisation programme for these factories, and in Klang MBDK issues a yearly KTK programme licence while the owner converts the land and gets the plans approved.

FactoryHub is dedicated to helping every client find the right factory or warehouse. If you want a unit's CCC or CF, licence position and fire certificate checked before you sign, call or WhatsApp Peter Tan (REN 12771) at 016-666 6872 or Jason Low (PEA 1478) at 012-288 1834.