Key Takeaways

  • In Selangor, Kuala Lumpur and Putrajaya a factory buys treated water from Air Selangor at the non-domestic tariff: RM3.51 per m³ for the first 35 m³ a month and RM3.83 per m³ above that, with a RM36 minimum charge, in force since 1 September 2025.
  • The water regulations plan a light industry building at 33,000 litres a day per hectare, medium industry at 50,000 and heavy industry at 65,000, and count a workshop or warehouse at 1,500 litres per unit. A wet process can need far more, so size the meter and tank from real bills.
  • A storage tank between the meter and the taps is compulsory. Medium and heavy industry buildings must store at least two days of demand, other buildings at least one day.
  • Low pressure is fixed on your side of the meter with a suction tank, pumps and storage. A pump drawing straight from the public main is an offence with a fine of up to RM10,000.
  • Piped natural gas runs through Gas Malaysia Distribution's network and is sold by a licensed shipper such as Gas Malaysia Energy and Services. The Central network has nine city gate stations, including Kapar, Meru, Shah Alam, Serdang and Dengkil, but only a written answer for your lot address tells you whether gas reaches the unit.

How much water does a factory need?

There is no single number. The water regulations give planning figures by type of building, and those are the figures used for deposits, capital contributions and minimum tank sizes. Your actual demand comes from your process and your headcount.

The Water Services Industry (Deposit, Fees and Water Service Charges) Regulations 2014 (P.U.(A) 37/2014) list the average estimated daily water demand:

Type of premises Estimated daily water demand
Building for heavy industry 65,000 litres per hectare
Building for medium industry 50,000 litres per hectare
Building for light industry 33,000 litres per hectare
Light industrial workshop 1,500 litres per unit
Semi-detached or bungalow workshop 1,500 litres per unit
Warehouse 1,500 litres per unit
Office or commercial (domestic use) 1,000 litres per 100 m²

Light, medium and heavy industry follow the classification in the Standard Industrial Area Planning issued by the Town and Country Planning Department, the same classes that decide zoning. If you are unsure which class your activity falls into, read our guide on light, medium and heavy industry in Malaysia.

A worked example from the planning figure

This only illustrates the formula; it is not a quote. A medium industry building on 1 hectare (about 2.47 acres) is planned at 50,000 litres, or 50 m³, a day. Over a 30-day month that is 1,500 m³. At the non-domestic tariff the bill is 35 m³ at RM3.51 plus 1,465 m³ at RM3.83, about RM5,734 a month.

Size from real bills, not only the table

  • Moving an existing plant: add up 12 months of water bills in m³ and divide by your working days. Give that daily figure, plus planned growth, to the plumber or engineer who designs the meter, pipe and tank.
  • Wet processes: food washing, cooling towers, boiler make-up water, plating and dyeing are not captured by a per-hectare planning figure. Measure them, or ask the machine supplier for litres per hour.
  • People: the 1,500 litres per unit for workshops and warehouses is a domestic-scale figure. A large shift workforce with canteen and washrooms adds to it.

What is the Air Selangor industrial water tariff?

Factories are billed in the non-domestic category. Air Selangor's tariff review notice and its non-domestic rate table set these rates from 1 September 2025:

Category Monthly usage Rate Minimum charge
Non-domestic 0 to 35 m³ RM3.51 per m³ RM36.00
Non-domestic Over 35 m³ RM3.83 per m³
Data centre Flat rate RM5.31 per m³ RM53.10

The previous non-domestic rates were RM2.70 and RM2.94. The review was approved by Cabinet and led by SPAN, the National Water Services Commission, and Air Selangor applies it across Selangor, Kuala Lumpur and Putrajaya.

What changes for a factory compared with a house

Item House Factory or warehouse
Tariff Domestic tiers, RM0.65 per m³ for the first 20 m³ RM3.51, then RM3.83 per m³ above 35 m³
Account deposit Fixed, RM70 for a single storey house and RM100 for a double storey house Two months of estimated water charges
Minimum tank storage One day One day, or two days for medium and heavy industry
Inflow control No such rule for houses Rule 95 lets Air Selangor require a constant flow valve

In Negeri Sembilan (Nilai, Seremban, Senawang) water comes from Syarikat Air Negeri Sembilan (SAINS) under its own tariff, so ask SAINS in writing for the current non-domestic rate before you compare running costs across the state line.

How do you apply for industrial water supply or a bigger meter?

You apply through a competent person who prepares the connection plans; Air Selangor approves them and then installs a meter that remains its property. A bigger meter for an existing factory is an alteration to the communication pipe, so it follows the same path.

Rule 88 of the Water Services Industry (Water Reticulation and Plumbing) Rules 2014 sets the order:

  1. Work out the demand from bills or the planning figures above.
  2. Appoint a competent person to prepare the communication pipe and tapping point plans. Air Selangor's meter FAQ says a newly built individual premises applies for a meter through a licensed plumber.
  3. Get the plans approved by Air Selangor.
  4. Apply for the connection with the approved plans, then apply for supply on Air Selangor's form.
  5. Pay the deposit and fees. Air Selangor supplies and installs the meter; it stays Air Selangor's property and the consumer is responsible for its safe custody (Rules 71 and 72).

Fees set by the regulations

Item Amount under P.U.(A) 37/2014
Account deposit, industrial premises Estimated monthly water demand × tariff × 2
Meter installation fee RM40 below 50 mm, RM80 for 50 to 100 mm, RM100 for 101 to 150 mm, RM120 above 150 mm
Meter testing deposit RM50 below 50 mm; actual testing cost for 50 mm and above
Disconnection or reconnection RM35, RM50 or RM100 by meter size; actual cost above 150 mm
Constant flow valve test RM150 per test
Capital contribution, industry premises and semi-detached or bungalow workshops RM1,000 or RM0.18 per litre of estimated daily demand, whichever is higher, plus RM0.40 per litre where Air Selangor builds the supply mains and RM0.80 per litre where it builds the service reservoirs

For the 1-hectare medium industry example above, the deposit formula gives about RM11,468, two months of about RM5,734. SPAN amended these regulations and the plumbing rules from 1 September 2025, adding data centre provisions and adjusting how capital contributions apply depending on who builds the mains and reservoirs, according to SPAN's circular of 4 September 2025. Ask Air Selangor to state the deposit, fees and any capital contribution for your application in writing.

How long it takes and who signs

We found no published processing time for an individual industrial connection. It is a plan approval, so start it at the same time as any TNB application; our guide to TNB power upgrade cost and timeline covers the power side. In a rented factory, check whose name the water account is in, the meter size on the bill, and whether the landlord will sign for a bigger connection, and put who pays for it into the tenancy.

Plumber and factory manager checking a large water meter at the factory fence
IllustrationPlumber and factory manager checking a large water meter at the factory fence

Why is the water pressure low at my factory, and how do you fix it legally?

Air Selangor's water pressure FAQ says the average pressure to premises is at least 10 m head (1 bar or 14.5 psi), and that much of the network carries pressure management devices. That is enough to fill a tank, not to run a process straight off the main. The fix sits on your side of the meter: a suction tank, pumps and storage sized for a full day.

What the rules allow

  • No pumping from the main. Rule 45 bars any pump that affects mains pressure downstream of a meter unless a suction tank is installed upstream of the pump. The fine is up to RM10,000.
  • Design pressure for new estates. Under Rule 17, a developer's pipes must supply buildings up to 15 m high without pumping at peak flow and keep at least 7.5 m of residual pressure above the highest supply level.
  • Constant flow valve. Under Rule 95, Air Selangor may require the inflow into a factory's storage tank to pass through a constant flow valve, fitted at the factory owner's expense.

Why some estates get less

Air Selangor's water supply FAQ explains that higher ground takes longer to receive water after a disruption and that premises closer to the source receive water sooner than those further down the pipeline. A factory on a rise at the end of an estate main feels this first.

Check on site before you sign

  1. Put a pressure gauge on the outlet after the meter at peak hours and again at night.
  2. Time how long the tank takes to refill overnight and compare it with a day's use.
  3. Make sure the stop valve is fully open and look for leaks; Air Selangor lists an accidentally closed stop valve among internal causes of no supply.
  4. Compare the meter and incoming pipe size with your demand. If they are undersized, apply for a bigger connection.
  5. Ask neighbours on the same road how their supply holds during dry spells.

Drawing your own water from a well or river in Selangor is not a free fix: abstraction is licensed by LUAS under section 41(2) of the LUAS Enactment 1999, as set out in a LUAS presentation.

How big must a factory water storage tank be?

Rule 50 of the plumbing rules decides it: a building for medium or heavy industry must store at least two days of water demand, and every other building at least one day, using the one-day figures in the Thirteenth Schedule.

Building One-day figure Minimum storage
Heavy industry 65,000 litres per hectare Two days: 130,000 litres per hectare
Medium industry 50,000 litres per hectare Two days: 100,000 litres per hectare
Light industry 33,000 litres per hectare One day: 33,000 litres per hectare
Light industrial workshop 1,500 litres per unit One day
Single or semi-detached workshop 1,500 litres per unit One day
Warehouse 1,500 litres per unit One day

How the tank must be built

  • A storage tank must sit between the meter and all taps, except a kitchen tap (Rule 46).
  • It must be watertight, protected against corrosion, rodents and insects, have a float valve, inlet and outlet at opposite ends, a scour pipe with a stop valve, and a dust and mosquito proof cover with an opening of at least 300 mm (Rule 47).
  • It may not be buried unless it is reinforced concrete designed to retain water, sits above flood and groundwater level and passes a tightness test. Its foundation must be certified by a competent person, and it may not sit directly below a sanitary pipe.
  • A tank dedicated to one consumer with its own meter, the usual case for a factory, must sit on a flat platform with at least 375 mm of clear headroom and a 600 mm wide platform around it for inspection and cleaning (Rule 48).
  • A tank that is not dedicated to one metered consumer, such as one shared by several units, must be compartmentalised above 10 m³, lined inside if built of concrete or steel panels, disinfected on completion and kept behind secured access (Rule 49).

Water for sprinklers and hydrants is a separate store set by Bomba; see our guide to Bomba fire protection requirements for factories. Air Selangor itself advises users to install or upgrade a tank to soften the impact of supply disruptions.

Is there natural gas in my industrial estate? How to check

Piped natural gas in Peninsular Malaysia runs through the Natural Gas Distribution System of Gas Malaysia Distribution (GMD). Gas Malaysia reports over 3,000 km of pipeline and over 24,000 customers (data as of January 2026). Whether gas reaches your unit depends on how far the lot is from the nearest main and on spare capacity, so only a written answer for the lot address settles it.

Who does what

  • GMD owns and runs the pipes as the distribution licensee.
  • A shipper buys the gas and sells it to you. Gas Malaysia Energy and Services (GMES) is one; under the Third Party Access system of the Gas Supply (Amendment) Act 2016, other licensed shippers can use GMD's network.
  • Suruhanjaya Tenaga (ST), the Energy Commission, licenses the industry and approves the gas installation inside your premises.

Where the Central network starts

GMD's distribution network page lists nine city gate stations in its Central Regional Network, each with its available firm capacity:

City gate station Available firm capacity (GJ per day, 24-hour operation)
Bestari Jaya 37,417
Kapar 20,697
Meru 124,456
Batu Tiga 33,135
Shah Alam 63,119
Puchong 21,659
Serdang 81,163
Dengkil 70,377
Bandar Baru Nilai 12,192

The Southern network includes Seremban 2 (9,816) and Seremban (9,321). ST's Piped Gas Distribution Industry Statistics 2019 lists the towns with natural gas supply, including Klang, Port Klang, West Port, North Port, Pulau Indah, Pandamaran, Kapar, Meru, Shah Alam, Puchong, Sungai Buloh, Rawang, Ijok, Bestari Jaya, Teluk Panglima Garang, Banting, Dengkil, Serdang, Seri Kembangan, Balakong, Bangi, Kajang, Semenyih and Nilai, with Senawang, Seremban and Sendayan in the south. These are towns, not lots: an estate in a listed town can still have no main in its road.

Four steps to a real answer

  1. Ask for the existing account. If the lot already takes gas, ask the owner for the meter or regulating station location, recent gas bills, the shipper's name and ST's Approval to Operate for the internal piping.
  2. Walk the estate road. Gas Malaysia marks its pipelines with signboards and pipeline markers along the route.
  3. Send a supply enquiry to a shipper with the lot address, burner or boiler list and expected usage. GMES says it replies within seven business days after its internal assessment.
  4. Get the answer in writing: distance to the main, capacity available, who pays for the service line and regulating station, the timeline and the price basis.

If the factory already has gas, GMD's facilities on the lot are now held under a Lease Agreement with GMD, and connections follow GMD's Gas Connection Manual. A buyer or tenant should read that lease and confirm the account can move across.

How do you get natural gas connected, and what does it cost?

Three things have to line up: a supply contract with a shipper, capacity on GMD's network, and an internal gas installation approved by ST.

Capacity on the network

These steps are run by your shipper. GMD's access application page commits to decide an access application within 7 business days, a long-term Reserved Firm Capacity application within 30 days and a short-term one within 14 days, followed by a Gas Distribution Agreement within seven days of approval.

Internal piping and ST approvals

  • An Approval to Install from ST is needed before work starts on a new, extended or modified installation (regulation 15 of the Gas Supply Regulations 1997), with design plans, calculations and equipment specifications endorsed by competent persons, according to ST's guide to the Gas Supply Act and Regulations.
  • The work must be done by a registered gas contractor and supervised by a competent person (regulation 21). The design codes include MS 930 for fuel gas piping and MS 830 for LPG storage and handling.
  • An Approval to Operate follows completion (regulation 16), on a Certificate of Completion and Test Certificate. ST's Approval to Operate page says it is granted within 7 working days of a complete application.

What it costs

The regulated distribution tariff of GMD for 2026 is RM2.114/GJ/day for all types of utilisation, on a base average tariff of RM1.880/GJ/day for 2026 to 2028, as announced on Gas Malaysia's site. The gas itself is priced by your shipper, so ask for the current price and how it is adjusted. Internal piping, the regulating set and burner conversion are priced by your gas contractor; get a written quote.

Before any piling, trenching or extension near a pipeline, Gas Malaysia says a work permit from Gas Malaysia is required under the Gas Supply Act; its emergency line is 1-800-88-9119.

No pipe in the estate

Gas Malaysia describes its reticulated LPG supply as serving the commercial and residential sectors. A factory without a natural gas main stores gas on site, for example LPG in tanks or cylinders. The piping still needs ATI and ATO, storage follows MS 830, and where the gas is not obtained from a licensed utility the owner or occupier must hold a Private Gas Licence, valid for 12 months and renewed no later than two months before expiry.

Visitors finding a gas pipeline marker post on an industrial estate road
IllustrationVisitors finding a gas pipeline marker post on an industrial estate road

Where are factories with both high power and natural gas in Selangor?

There is no public register of units that have both, so work by overlap. Our high-power factories in Selangor page shows most advertised high-power stock in the Port Klang belt, then Kapar, Shah Alam and Telok Panglima Garang. Those towns are on ST's natural gas supply list, and Kapar, Meru and Shah Alam have GMD city gate stations. Then confirm both at lot level: TNB for the power supply and a shipper for the gas main. Our factory site selection checklist puts water and power alongside flood, zoning and access.

Check on site Ask for Why it matters
Water meter and account Latest bill, meter size, account name Sets daily volume, deposit and who applies for an upgrade
Storage tank Capacity, compartments, cover, scour valve One or two days of demand under Rule 50
Pressure Gauge reading at peak hours Tells you whether pumps and storage are needed
Pump set Suction tank upstream of the pumps Rule 45 bars pumping from the main
Fire water Sprinkler and hydrant tanks Separate Bomba requirement
Existing gas Meter or regulating station, ATO, GMD lease Proves a legal, working connection
New gas Shipper's written reply Distance, capacity, cost and timeline

This guide summarises published rules and tariffs; it is not legal or engineering advice, so confirm figures with Air Selangor, your gas shipper and your engineer before you commit.

Location and site: more questions

Does Gas Malaysia supply natural gas to my area?

Gas Malaysia Distribution's Central network has city gate stations at Bestari Jaya, Kapar, Meru, Batu Tiga, Shah Alam, Puchong, Serdang, Dengkil and Bandar Baru Nilai. A town on the supply list does not mean a main runs past your lot, so send the lot address to a gas shipper and ask for a written reply.

Practical steps: more questions

Can a factory use LPG if there is no natural gas pipe?

Yes. The piping needs ST's Approval to Install and Approval to Operate, LPG storage follows the MS 830 code, and if the gas is not obtained from a licensed utility the owner or occupier needs a Private Gas Licence renewed every 12 months.

FactoryHub is dedicated to helping every client find the right factory or warehouse. For a unit with the water, gas and power your process needs, contact Peter Tan (REN 12771, 016-666 6872) or Jason Low (PEA 1478, 012-288 1834).

For a unit in Klang, Ms Teh Seok Hoon lists the water, gas and fibre checks for a Klang factory.

Frequently Asked Questions

What water supply and infrastructure does a semiconductor factory need?

Treated mains water is the base: in Selangor a factory buys it from Air Selangor at the non-domestic tariff and must keep a storage tank holding at least one day of demand, or two days for a medium or heavy industry building. Any purified process water your line needs is treated on site, so leave room for that plant. Also plan 24-hour power with backup, compressed air, separated and bunded storage for gas cylinders and chemicals, exhaust routes and a scheduled waste store. Check gas and chemical storage with Bomba and DOE.

Which industrial parks have sufficient power and water supply?

No park can promise both for every lot, because TNB and Air Selangor supply each lot according to the local network. Units on higher ground or at the far end of an estate main feel low water pressure first, and any power load above 350 kVA (about 505A) needs a new TNB substation. Before you sign, get the TNB supply in writing with a recent bill, check the water meter size and the pressure at peak hours, and ask Air Selangor in writing whether a bigger connection is possible.

Is 1.5 bar water pressure good for a factory?

It is above the at least 1 bar (10 m head) that Air Selangor gives as the average pressure to premises. For a factory the better test is whether the tank refills overnight to cover a full day's use. If it does not, add a suction tank and pumps rather than a larger pump on the main.

Can I pump water directly from the Air Selangor pipe?

No. Rule 45 of the Water Services Industry (Water Reticulation and Plumbing) Rules 2014 bars a pump that affects mains pressure downstream of the meter unless a suction tank is installed upstream of it. The fine is up to RM10,000.

How much is the water deposit for a factory in Selangor?

For industrial premises the regulations set the deposit at two months of estimated water charges: estimated monthly demand times the tariff times two. A factory using 1,500 m³ a month at the non-domestic tariff would pay about RM11,468. Air Selangor confirms the figure when it processes your application.

What is the minimum water bill for a factory in Selangor?

The non-domestic minimum charge is RM36.00 a month, unchanged in the review that took effect on 1 September 2025. Usage is billed at RM3.51 per m³ up to 35 m³ and RM3.83 per m³ above that.

How do I check water disruption in my industrial area?

Air Selangor tells users to follow its website, the Air Selangor app and, for major disruptions, its social media accounts. Scheduled disruptions are announced in advance; unscheduled ones, such as pipe bursts, come without notice.

Do I need a licence to use well water for my factory in Selangor?

Yes. Taking water from a river or from groundwater in Selangor is licensed by LUAS, the Selangor Water Management Authority, under section 41(2) of the LUAS Enactment 1999, with abstraction charges.