Key Takeaways

  • Yes, a factory needs scheduled waste management as soon as it produces any waste listed in the First Schedule of the Environmental Quality (Scheduled Wastes) Regulations 2005: used oil, oily rags and gloves, empty chemical drums, paint and solvent waste, metal sludge, batteries or e-waste. There is no minimum size.
  • Waste may be kept on site for up to 180 days and 20 metric tonnes in total, in closed, compatible containers inside a roofed, bunded and fenced store. Every container carries the date it was first generated, the generator's name, address and phone number, the hazard label and the SW code.
  • The occupier notifies DOE within 30 days of first generating a new type of waste, keeps an inventory for three years, records every collection in eSWIS, and hands waste only to DOE-licensed contractors who deliver it to licensed facilities.
  • DOE expects a certified competent person (CePSWaM) to manage the waste under section 49A of the Environmental Quality Act 1974. Since 7 July 2024, illegal disposal carries jail of up to five years plus a fine of RM100,000 to RM10 million.
  • An offence record belongs to the company and its directors, not to the land title. Abandoned drums, contamination and DOE clean-up costs, however, can follow the building, so tenants, buyers and landlords should inspect the store, the records and the site before taking over.

Does a factory need scheduled waste management?

Yes, if it generates even one type of scheduled waste. The Regulations define a waste generator as "any person who generates scheduled wastes", with no threshold for floor area, headcount or tonnage. A small workshop that changes machine oil and a large plant with a plating line carry the same core duties; only the volume of paperwork differs.

The First Schedule groups 77 codes into five families: SW 1 metal and metal-bearing wastes, SW 2 mainly inorganic wastes, SW 3 mainly organic wastes, SW 4 wastes that may be either, and SW 5 residues from treating scheduled waste. Once a waste fits a code, these duties apply:

  1. Notify DOE within 30 days of generating a new category, with the details in the Second Schedule (regulation 3).
  2. Dispose of it only at prescribed premises, meaning facilities licensed by DOE, and treat or recover it only there or in an approved on-site facility (regulations 4 to 6).
  3. Store, label and keep an inventory (regulations 9 to 11).
  4. Send it out with a consignment note and the waste information card for the contractor (regulations 12 and 13).
  5. Train every employee who identifies, handles, labels, stores or cleans up the waste (regulation 15).
  6. Employ a DOE-certified competent person for scheduled waste management (section 49A of the Act, explained below).

Which everyday factory wastes are scheduled waste?

Waste you see on the floor SW code Where it usually comes from
Spent lubricating oil SW 305 Machine, compressor and forklift servicing
Spent hydraulic oil SW 306 Presses, injection moulding machines, hydraulic lifts
Oil-water emulsion SW 307 Cutting coolant from CNC and machining lines
Rags, plastics, papers or filters contaminated with scheduled waste SW 410 Wiping rags, gloves, oil and spray booth filters
Containers, bags or equipment contaminated with chemicals or oil SW 409 Empty chemical drums, oil pails, resin bags
Waste inks, paints, lacquer, dye or varnish, and their sludges SW 417, SW 416 Spray painting, printing, coating
Non-halogenated organic solvents SW 322 Thinner, cleaning solvent
Sludges containing metals such as chromium, copper, nickel or zinc SW 204 Sludge from an effluent treatment system or plating line
Lead acid batteries SW 102 Forklift and backup batteries
Waste from electrical and electronic assemblies SW 110 Rejected boards, scrap electronics
Chemicals that are discarded or off-specification SW 429 Expired or rejected raw materials
A mixture of scheduled and non-scheduled wastes SW 422 Mixed scrap that contains any scheduled waste

If your factory runs a wet process, its effluent sludge is scheduled waste too; the treatment plant itself is covered in our guide to industrial effluent treatment systems. DOE also publishes a guideline on the clarification of waste classification under the 2005 Regulations on its scheduled waste guidelines page for borderline cases.

Does a warehouse need it too?

It depends on what happens inside. A warehouse that only receives and ships sealed goods may generate nothing on the list. One that charges forklift batteries, services its own trucks, or writes off damaged and expired chemical stock will produce SW 102, SW 305, SW 409 or SW 429 and becomes a waste generator. A warehouse that stores other companies' scheduled waste is a different business altogether: DOE's packaging, labelling and storage guidelines state that building an off-site storage facility needs an approved EIA and operating it needs written permission under section 19 and a licence under section 18 of the Act. For chemical goods that are not waste, see renting a warehouse for chemical storage.

How long can scheduled waste be stored, and how must the store and labels look?

Up to 180 days from the date the waste is generated, provided the total on site never exceeds 20 metric tonnes (regulation 9(5)). DOE may order you to send waste out earlier. To keep more than 20 tonnes you must apply in writing to the DOE state office on the prescribed form and receive written approval (regulation 9(6) and section 4.3 of the guidelines).

Containers must be compatible with the waste, durable, leak-proof and kept closed except when adding or removing waste. Incompatible wastes go in separate containers placed in separate secondary containment areas (regulation 9(1) to (3)).

What the storage area needs

Requirement DOE guideline
Location Away from production and staff areas, away from heat or fire, not in a flood-prone spot or at the edge of a slope
Size Space for all waste plus 25% extra capacity, for storage of no more than 180 days
Security Fenced, treated as a restricted area, with "DANGER" and "SCHEDULED WASTES STORAGE" signs
Floor Concrete or suitable lining, free of cracks and gaps, including the loading area
Roof Sheltered, roofed or covered; rainwater and surface run-off kept out
Bund Concrete dike around the whole area holding 110% of the volume of the single container with the most capacity, no openings, graded to a sump
Ventilation Required for volatile wastes
Segregation Separate compartments for incompatible waste groups
Fire Firefighting equipment, emergency equipment and a spill kit, fully meeting Bomba requirements

Drums and bags sit on pallets: a maximum of 4 drums or 1 bag per standard pallet, rows two pallets wide, no more than 2 tiers without crates or 3 tiers with crates, and enough aisle space for a forklift, firefighting and inspection. Stored containers are inspected weekly and the results kept in a log book.

What each container label must show

Regulation 10 requires, on every container:

  • the date the waste was first generated;
  • the waste generator's name, address and telephone number;
  • the hazard label from the Third Schedule, chosen from 11 types such as inflammable liquids, toxic substances, corrosive substances and mixture of miscellaneous dangerous substances;
  • the SW code from the First Schedule.

Each hazard label is a square set at 45 degrees and at least 10 cm by 10 cm unless the container is too small. No one may alter the markings once applied. The guidelines also ask for a waste card for each type of waste so that staff and contractors know its hazards.

Who is the competent person, and does every factory need one?

Section 49A of the Environmental Quality Act, inserted by the 2012 amendment (Act A1441), says an owner or occupier of a premises "shall employ a person who has been certified by the Director General as a competent person" for activities that include "the management of scheduled wastes". DOE's training institute EiMAS runs the certification and lists certified people in the National Registry of Certified Environmental Professionals (NRCEP). The certificate for scheduled waste is CePSWaM (Certified Environmental Professional in Scheduled Waste Management); EiMAS also runs COSWaM, a scheduled waste course for workshops.

Certification is not a one-day course. According to INSTEP, one of the training providers EiMAS lists, the candidate attends the competency course, completes assignments, passes the assessment, prepares and submits a field training report, attends a professional interview and is then certified by the Director General. Certified persons must also earn annual continuing professional development points set by DOE.

What to check on site: the competent person's certificate, that the name appears on NRCEP, and that the person actually works at that premises rather than only on paper. Every other employee who handles the waste still needs training under regulation 15.

A supervisor checks sealed waste drums inside a bunded, roofed factory storage area
IllustrationA supervisor checks sealed waste drums inside a bunded, roofed factory storage area

How does eSWIS work, from registration to each collection?

eSWIS, DOE's Electronic Scheduled Waste Information System at eswisv2.doe.gov.my, is where generators record their inventory and file every consignment. The steps:

  1. Get a DOE file number from the DOE state office covering your premises. The eSWIS FAQ says you need it before you can register.
  2. Register the premises on eSWIS as a waste generator.
  3. Notify each new waste within 30 days of first generating it (regulation 3).
  4. Keep the inventory up to date: categories and quantities generated, treated, disposed of and recovered, kept for up to three years (regulation 11 and the Fifth Schedule). eSWIS also asks for WC and WAC submissions for every waste code; only some codes need lab analysis.
  5. File a consignment note for each collection. Under regulation 12 the contractor must deliver the waste within 10 days of receiving it, the receiving facility completes its part within 20 days, and the generator copies DOE within 30 days of transport. If the generator does not get its completed copy within 30 days, it must notify DOE and investigate.
  6. Confirm receipt. The FAQ notes that inventory is only deducted after the consignment is marked Received by the waste receiver, so an unreceived note leaves the waste on your books.

Consignment records are kept for at least three years by the generator, the contractor and the facility.

How do you choose a licensed contractor, and what does disposal cost?

Only a contractor licensed by DOE under section 18(1A) of the Act may transport your waste, and only a prescribed premises may receive it. The eSWIS licensed facility list shows each company's licence number, licence type (transporter or facility), the SW codes it may handle and, for transporters, the registered vehicles. Before signing:

  • check the licence covers your exact SW codes, not just "scheduled waste";
  • check the truck that turns up is on the licence;
  • give the contractor the Seventh Schedule information for each waste, as regulation 13 requires;
  • agree who handles a spill in transit: regulation 14 makes the contractor report and clean it up, with the generator giving technical help.

Disposal cost varies with the SW code, quantity, packaging, distance and whether the waste is recovered or destroyed. No official rate exists, so ask two or three licensed contractors for written quotes per drum or per tonne and confirm whether transport, containers and the consignment process are included. Some wastes can go for reuse or other approved routes under special management (regulation 7), which needs a written application to DOE with a non-refundable fee of RM300 and follows DOE's guidelines and checklists on its hazardous substances management page.

What are the penalties for getting it wrong?

Offence Provision Penalty
Placing, depositing or disposing of scheduled waste anywhere except prescribed premises, or sending, receiving or transiting it without approval Section 34B Jail up to 5 years and a fine of RM100,000 to RM10 million
Other breaches of the Act or the Regulations with no specific penalty, such as storage beyond 180 days, missing labels, no inventory or no notification Section 41 Fine of RM5,000 to RM250,000, or jail up to 2 years, or both
Compounding instead of prosecution Section 45 Needs the Public Prosecutor's written consent; up to 50% of the maximum fine
Offence by a company Section 43 Directors and managers are deemed guilty unless they prove no consent and due diligence
Pollution clean-up by DOE Section 47 Costs recovered from the polluter and made a first charge on its property

The higher fines come from the Environmental Quality (Amendment) Act 2024 (Act A1712), which took effect on 7 July 2024. Sections 41, 43 and 47 are in the Environmental Quality Act 1974.

Cases near Klang show how this plays out. In July 2025 the Kuala Selangor Sessions Court fined a scrap metal and e-waste factory RM256,000 after DOE found about 126 pallets of circuit board material and furnaces without air pollution control. In January 2026 the operator of a copper recycling centre raided in Kapar was jailed for a day and fined RM150,000; inspectors had classified his scrap as SW 422. At an illegal dump in Bukit Pelandok, Negeri Sembilan, DOE found about 800 drums and bulk containers, and the estimated cost of cleaning and disposal was about RM1.16 million, with removal from the first site completed with the landowner's cooperation.

An inspector photographs abandoned drums behind a factory wall as the manager looks on
IllustrationAn inspector photographs abandoned drums behind a factory wall as the manager looks on

What should a tenant, a buyer and a landlord check before taking over a factory?

If you are renting

  • Walk the scheduled waste store: roof, bund, sump, cracks in the floor, signage and fencing. Whether you can reuse it or must build one depends on your waste volume and the 110% bund rule, so size it against the container with the most capacity you will use.
  • Ask the landlord in writing whether any drums, sludge or contaminated material remain on site, and have the tenancy state the unit is handed over free of scheduled waste.
  • Check that the lot's zoning and approvals allow your process; see light, medium and heavy industrial zoning.
  • Plan your own DOE file number, eSWIS registration and competent person before production starts. The outgoing tenant's account and records belong to that tenant.

If you are buying

  • Ask for the seller's eSWIS inventory and consignment notes for the last three years, the contractors' licences, any DOE inspection reports, notices, compounds or court cases, and any approval to store above 20 tonnes or for special management.
  • Inspect for buried or abandoned drums, stained soil, oil around drains and a bund that leaks. DOE's scheduled waste guidelines page carries its contaminated land management, assessment and screening level guidelines if testing is needed.
  • Put a seller's warranty and indemnity on scheduled waste and contamination into the agreement, with a retention sum if anything is found; our guide to the factory SPA covers how these clauses sit alongside the rest.
  • Air emission and noise approvals and a full environmental site assessment are separate checks with their own FactoryHub guides.

If you are the landlord

  • Require the tenant, in the tenancy, to comply with the Act and Regulations, keep eSWIS and consignment records, employ a competent person and let you inspect the store.
  • At the end of the tenancy, ask for proof that every container left with a licensed contractor (completed consignment notes) before returning the deposit; our guide to reinstatement works explains how to tie this to the handover.
  • Never accept drums "left for the next tenant". The Act's section 34B catches anyone who places or deposits scheduled waste, or causes or permits it to be placed or deposited, anywhere other than prescribed premises.

Does an environmental offence record affect a factory sale?

Not directly, but it can affect the price, the timing and who pays. A DOE compound or conviction is recorded against the company and, under section 43, its directors and managers. It is not endorsed on the land title, so it does not by itself stop a transfer or a bank charge.

It matters in three ways. First, if waste or contamination is still on the land, the buyer will find it in due diligence and will either price it in, ask for the clean-up before completion or walk away. Second, if DOE cleans up and recovers the cost under section 47, the sum becomes a first charge on property held by the polluter, which can include the factory being sold. Third, in a share sale the buyer takes over the company itself, together with its record, pending cases and liabilities, which is why share purchasers ask for wider warranties than asset purchasers. A seller with a clean store, three years of complete eSWIS records and no open DOE matters is simply easier to sell.

Frequently Asked Questions

What is meant by scheduled waste in Malaysia?

Scheduled waste is any waste that falls within the 77 codes listed in the First Schedule of the Environmental Quality (Scheduled Wastes) Regulations 2005, grouped from SW 1 to SW 5. Common factory examples are used oil, oily rags and filters, empty chemical containers, solvent and paint waste, metal sludge, lead acid batteries and e-waste. It must be stored, labelled, recorded and sent to DOE-licensed facilities.

How long can scheduled waste be stored in a factory?

Up to 180 days after it is generated, provided the total stored on site does not exceed 20 metric tonnes. DOE can order earlier removal. Storing more than 20 tonnes needs a written application to the DOE state office and written approval.

What is eSWIS and who must register?

eSWIS is DOE's online Electronic Scheduled Waste Information System, used by waste generators and receiving facilities to record inventory and file consignments. A factory that generates scheduled waste first obtains a DOE file number from its state DOE office, then registers the premises on eSWIS. Every collection is filed there and the inventory reduces only when the receiver marks the consignment as received.

Is a CePSWaM competent person compulsory?

Section 49A of the Environmental Quality Act requires an owner or occupier to employ a person certified by DOE's Director General for the management of scheduled wastes, and EiMAS certifies these people under the CePSWaM programme. The person must complete the course, a field training report and an interview, and must keep earning CPD points. Workshops have a separate COSWaM course.

Does an environmental offence record affect the sale of a factory?

The record attaches to the company and its directors, not to the land title, so it does not by itself block a transfer. Waste or contamination left on site, and DOE clean-up costs that the Act makes a first charge on the polluter's property, can still reduce the price or delay completion. In a share sale the buyer inherits the company's record and liabilities.

Who is responsible for scheduled waste left behind when a tenant moves out?

The tenant who generated it remains the waste generator and should remove it through a licensed contractor with completed consignment notes. Landlords should make this a condition of returning the deposit and should not accept waste left on site, because section 34B also covers anyone who causes or permits scheduled waste to be deposited other than at prescribed premises.

What is the fine for illegal disposal of scheduled waste in Malaysia?

Since 7 July 2024, a person convicted under section 34B faces jail of up to five years and a fine of not less than RM100,000 and not more than RM10 million. Directors and managers of an offending company are deemed guilty unless they prove the offence happened without their consent and that they exercised due diligence.

What is e-waste in Malaysia, and is it scheduled waste?

DOE classifies e-waste as scheduled waste under code SW 110, which covers waste from electrical and electronic assemblies containing components such as accumulators, mercury switches or PCB capacitors, or contaminated with metals such as lead, cadmium or mercury. A factory's e-waste is therefore stored, labelled, recorded in eSWIS and sent through a licensed contractor to a prescribed premises like any other scheduled waste, while DOE's e-waste portal points households to registered collection centres instead.

This guide explains the rules in general and is not legal advice; confirm your own case with the DOE state office or a lawyer. To report illegal dumping, DOE's 24-hour hotline is 1-800-88-2727.